{"id":92923,"date":"2019-05-20T09:20:03","date_gmt":"2019-05-20T06:20:03","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=92923"},"modified":"2019-05-20T09:31:25","modified_gmt":"2019-05-20T06:31:25","slug":"abd-350-mwlik-turbin-tedarigine-yonelik-nordex-ile-anlasma-sagladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/abd-350-mwlik-turbin-tedarigine-yonelik-nordex-ile-anlasma-sagladi\/","title":{"rendered":"(Turkish) ABD 350 MW&#8217;l\u0131k T\u00fcrbin Tedari\u011fine Y\u00f6nelik Nordex \u0130le Anla\u015fma Sa\u011flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/92923\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Alman r\u00fczgar t\u00fcrbini \u00fcreticisi olan Nordex taraf\u0131ndan ABD\u2019de ki r\u00fczgar enerji projesine y\u00f6nelik Delta 4000 serisi i\u00e7in anla\u015fma ger\u00e7ekle\u015ftirildi.<\/h1>\n<p><img loading=\"lazy\" class=\"alignright wp-image-92924 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/0-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/0-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/0-768x512.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/0-1024x683.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/0-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/0-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/0-450x300.jpg 450w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Il\u0131man b\u00f6lgelere y\u00f6nelik tasarlanm\u0131\u015f olan <strong>DELTA 4000<\/strong> serisi <strong>N149\/4.0-4.5<\/strong>\u00a0modelinin, Amerika\u2019da bir \u00e7ok potansiyel r\u00fczgar sahas\u0131 i\u00e7in uygun oldu\u011funu belirten Nordex\u00a0Grup CSO\u2019su Patxi Landa, ilk kez y\u00fcksek verimli olan <strong>4.0-4.5 MW<\/strong> aras\u0131nda olan r\u00fczgar t\u00fcrbinlerinin Amerika\u2019da kullan\u0131laca\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131.<\/p>\n<p>Toplamda 350 MW g\u00fcce sahip kurulum i\u00e7in <strong>Delta 4000 serisi\u00a0<\/strong>N149\/4.0-4.5\u00a0modelinden \u00a074 adet r\u00fczgar t\u00fcrbini tedarik edilecek olup 2020 y\u0131l\u0131n\u0131n bahar ay\u0131na kadar r\u00fczgar t\u00fcrbinlerinin teslim edimesi ve kurulmas\u0131 planlanmaktad\u0131r.<\/p>\n<p>Zeynep TEKER \u2013 \u0130T\u00dc \/ \u00c7evre M\u00fchendisi \u2013\u00a0<a href=\"mailto:zeynepteker03@gmail.com\" target=\"_blank\" rel=\"noopener\">zeynepteker03@gmail.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Alman r\u00fczgar t\u00fcrbini \u00fcreticisi olan Nordex taraf\u0131ndan ABD\u2019de ki r\u00fczgar enerji projesine y\u00f6nelik Delta 4000 serisi i\u00e7in anla\u015fma ger\u00e7ekle\u015ftirildi. Il\u0131man b\u00f6lgelere y\u00f6nelik [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":92924,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[1198,21812,51051,34979,19638,26353,67,1009,51053,2455,51050,42477,35002,16,24949,34961,34960,36999,51052,48106],"views":1005,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/92923"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=92923"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/92923\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/92924"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=92923"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=92923"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=92923"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}