{"id":92880,"date":"2019-05-19T10:47:28","date_gmt":"2019-05-19T07:47:28","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=92880"},"modified":"2019-05-19T10:50:51","modified_gmt":"2019-05-19T07:50:51","slug":"akfenin-canakkaledeki-ucpinar-res-projesi-enerji-uretimine-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akfenin-canakkaledeki-ucpinar-res-projesi-enerji-uretimine-basladi\/","title":{"rendered":"(Turkish) Akfen&#8217;in \u00c7anakkale\u2019deki &#8216;\u00dc\u00e7p\u0131nar RES Projesi&#8217; Enerji \u00dcretimine Ba\u015flad\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/92880\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>2020 y\u0131l\u0131na kadar T\u00fcrkiye\u2019de sadece yerli ve yenilenebilir kaynaklardan olu\u015fan 1000 MW\u2019l\u0131k enerji \u00fcretim santrali kapasitesine ula\u015fmay\u0131 hedefleyen Akfen Yenilenebilir Enerji, \u00c7anakkale\u2019de 143 milyon dolarl\u0131k yat\u0131r\u0131ma sahip 112 MW\u2019l\u0131k \u00dc\u00e7p\u0131nar R\u00fczgar Enerji Santrali (RES) projesinin 51 MW\u2019l\u0131k ilk faz\u0131n\u0131 devreye ald\u0131.<img loading=\"lazy\" class=\"alignright size-medium wp-image-92882\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/akfenin-canakkaledeki-ucpinar-res-projesi-enerji-uretimine-basladi2-200x300.jpg\" alt=\"\" width=\"200\" height=\"300\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/akfenin-canakkaledeki-ucpinar-res-projesi-enerji-uretimine-basladi2-200x300.jpg 200w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/akfenin-canakkaledeki-ucpinar-res-projesi-enerji-uretimine-basladi2-266x400.jpg 266w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/akfenin-canakkaledeki-ucpinar-res-projesi-enerji-uretimine-basladi2-33x50.jpg 33w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/akfenin-canakkaledeki-ucpinar-res-projesi-enerji-uretimine-basladi2.jpg 325w\" sizes=\"(max-width: 200px) 100vw, 200px\" \/><\/h1>\n<p>Yerli ve yenilenebilir enerji kaynaklar\u0131n\u0131 ekonomiye kazand\u0131rmak \u00fczere yat\u0131r\u0131mlar\u0131n\u0131 aral\u0131ks\u0131z s\u00fcrd\u00fcren <strong>Akfen Yenilenebilir Enerji<\/strong>, 143 milyon dolarl\u0131k yat\u0131r\u0131m de\u011feri bulunan \u00c7anakkale \u00dc\u00e7p\u0131nar R\u00fczgar Enerji Santrali (RES) projesinde elektrik \u00fcretimine ge\u00e7ti.<\/p>\n<p><strong>\u00dc\u00e7p\u0131nar RES<\/strong>\u2019in, <strong>51 MW g\u00fc\u00e7 kapasitesine sahip 15 t\u00fcrbini<\/strong> i\u00e7in Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019ndan ge\u00e7ici kabul alan <strong>Akfen Yenilenebilir Enerji<\/strong>, projenin ilk faz\u0131n\u0131 tamamlam\u0131\u015f oldu. Santralin ge\u00e7ici kabul\u00fc yap\u0131lan ilk k\u0131sm\u0131n\u0131n <strong>y\u0131ll\u0131k 156 GWs <\/strong>elektrik \u00fcretmesi bekleniyor. Tam kapasiteye ula\u015ft\u0131\u011f\u0131nda <strong>33 t\u00fcrbin<\/strong> ve <strong>112 MW kurulu g\u00fcce ula\u015facak projenin 2019 y\u0131l\u0131 i\u00e7inde<\/strong> tamamlanmas\u0131 hedefleniyor. <strong>\u00dc\u00e7p\u0131nar RES<\/strong> tam kapasiteye ula\u015ft\u0131\u011f\u0131nda <strong>450 bin ki\u015finin<\/strong> y\u0131ll\u0131k enerji ihtiyac\u0131n\u0131 kar\u015f\u0131layacak.<\/p>\n<p><strong>\u00dc\u00e7p\u0131nar RES<\/strong> projesinin k\u0131smi olarak devreye girmesiyle Akfen Yenilenebilir Enerji <strong>406 MW kurulu g\u00fc\u00e7<\/strong> <strong>kapasitesine<\/strong> ve y\u0131ll\u0131k toplam <strong>1.295 GWs elektrik \u00fcretim<\/strong> <strong>kapasitesine<\/strong> ula\u015ft\u0131.<\/p>\n<p><strong>R\u00dcZGARDA\u00a0<\/strong><strong>ATA\u011eA KALTI<\/strong><\/p>\n<p>Akfen Yenilenebilir Enerji, ge\u00e7en <strong>Mart ay\u0131nda<\/strong> yine \u00c7anakkale\u2019de bulunan <strong>30,6 MW kurulu g\u00fcc\u00fcndeki Kocalar RES<\/strong> projesini tamamlayarak devreye ald\u0131. Kocalar RES projesinde \u00fcretilen enerjiyi ulusal elektrik a\u011f\u0131 \u00fczerinden t\u00fcm T\u00fcrkiye\u2019ye ula\u015ft\u0131rarak <strong>120 bin ki\u015finin<\/strong> y\u0131ll\u0131k enerji ihtiyac\u0131n\u0131 r\u00fczgardan tek ba\u015f\u0131na kar\u015f\u0131layan Akfen Yenilenebilir Enerji, Kocalar ve \u00dc\u00e7p\u0131nar RES\u2019in yan\u0131 s\u0131ra 2019 y\u0131l\u0131 i\u00e7erisinde \u00c7anakkale\u2019deki <strong>58 MW\u2019l\u0131k Hasanoba RES<\/strong> ve Denizli\u2019deki <strong>75 MW\u2019l\u0131k Denizli RES<\/strong> projelerinin tamamlan\u0131p elektrik \u00fcretimine ge\u00e7irmeyi hedefliyor. B\u00f6ylelikle \u015firketin 4 r\u00fczgar enerjisi santrali projesindeki kurulu g\u00fcc\u00fc 2019 y\u0131l\u0131 sonunda <strong>275 MW\u2019a<\/strong> ula\u015facak. \u015eirketin toplam g\u00fcc\u00fc ise <strong>632 MW\u2019a<\/strong> \u00e7\u0131kacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 2020 y\u0131l\u0131na kadar T\u00fcrkiye\u2019de sadece yerli ve yenilenebilir kaynaklardan olu\u015fan 1000 MW\u2019l\u0131k enerji \u00fcretim santrali kapasitesine ula\u015fmay\u0131 hedefleyen Akfen Yenilenebilir Enerji, \u00c7anakkale\u2019de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":92883,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[3936,28245,4427,51019,51018,34979,26353,19,67,1009,50483,51017,35002,24949,35004,34961,34960,34977,50527,51020,26829,12145],"views":605,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/92880"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=92880"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/92880\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/92883"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=92880"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=92880"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=92880"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}