{"id":92869,"date":"2019-05-19T00:35:58","date_gmt":"2019-05-18T21:35:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=92869"},"modified":"2019-05-19T00:42:05","modified_gmt":"2019-05-18T21:42:05","slug":"teksin-enerjiden-karamana-33-mw-guce-sahip-gunes-enerjisi-santrali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/teksin-enerjiden-karamana-33-mw-guce-sahip-gunes-enerjisi-santrali\/","title":{"rendered":"(Turkish) &#8217;Teksin Enerji&#8217;den Karaman\u2019a 33 MW G\u00fcce Sahip G\u00fcne\u015f Santrali"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/92869\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Teksin Enerji taraf\u0131ndan Karaman\u2019da 33 MW g\u00fcce sahip g\u00fcne\u015f enerjisi santrali (ges) kurulup i\u015fletilecek.<\/h1>\n<h1><img loading=\"lazy\" class=\"alignleft size-medium wp-image-92871\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/teksin-enerjiden-karamana-33-mw-guce-sahip-gunes-enerjisi-santrali-300x197.jpg\" alt=\"\" width=\"300\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/teksin-enerjiden-karamana-33-mw-guce-sahip-gunes-enerjisi-santrali-300x197.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/teksin-enerjiden-karamana-33-mw-guce-sahip-gunes-enerjisi-santrali-768x505.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/teksin-enerjiden-karamana-33-mw-guce-sahip-gunes-enerjisi-santrali-500x329.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/teksin-enerjiden-karamana-33-mw-guce-sahip-gunes-enerjisi-santrali-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/teksin-enerjiden-karamana-33-mw-guce-sahip-gunes-enerjisi-santrali.jpg 853w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/h1>\n<p>Teksin Enerji \u00dcretim A.\u015e., Karaman \u0130li, Merkez \u0130l\u00e7esi, Urgan K\u00f6y\u00fc s\u0131n\u0131rlar\u0131nda <strong>33,124 MW<\/strong> kurulu g\u00fcce sahip Teksin G\u00fcne\u015f Enerjisi Santrali\u2019nin kurulumunu ger\u00e7ekle\u015ftirerek i\u015fletmeye alacakt\u0131r.<\/p>\n<p>Yakla\u015f\u0131k olarak 114,3 milyon lira de\u011ferinde yat\u0131r\u0131m bedeliyle\u00a0<strong>66.254.736 kWh<\/strong> elektrik \u00fcretiminin ge\u00e7ekle\u015ftirilerek ekonomik \u00f6mr\u00fcn\u00fcn <strong>49 y\u0131l<\/strong> olaca\u011f\u0131 tahmin edilen tesis kurulumunun <strong>6 ay<\/strong> s\u00fcrece\u011fi belirtilmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Teksin Enerji taraf\u0131ndan Karaman\u2019da 33 MW g\u00fcce sahip g\u00fcne\u015f enerjisi santrali (ges) kurulup i\u015fletilecek. Teksin Enerji \u00dcretim A.\u015e., Karaman \u0130li, Merkez \u0130l\u00e7esi, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":92871,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[19,67,1009,35038,23416,35039,23133,34925,23131,1679,51001,51000,34977,26829],"views":1198,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/92869"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=92869"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/92869\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/92871"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=92869"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=92869"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=92869"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}