{"id":92427,"date":"2019-05-11T11:53:39","date_gmt":"2019-05-11T08:53:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=92427"},"modified":"2019-05-11T11:56:36","modified_gmt":"2019-05-11T08:56:36","slug":"kuresel-fotovoltaik-enerji-pv-kurulu-gucu-2019da-129-gwa-cikabilir","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kuresel-fotovoltaik-enerji-pv-kurulu-gucu-2019da-129-gwa-cikabilir\/","title":{"rendered":"(Turkish) &#8221;K\u00fcresel Fotovoltaik Enerji (PV) Kurulu G\u00fcc\u00fc 2019&#8217;da 129 GW&#8217;a \u00c7\u0131kabilir&#8221;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/92427\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Londra merkezli ara\u015ft\u0131rma firmas\u0131 olan IHS Markit\u2019in yay\u0131nlad\u0131\u011f\u0131 &#8220;PV Installations Tracker 2019&#8221; \u00e7eyrek d\u00f6nem raporuna g\u00f6re, k\u00fcresel fotovoltaik (PV) kurulumlar\u0131 y\u0131ll\u0131k % 25\u2019lik art\u0131\u015fla toplamda 129 GW\u2019a \u00e7\u0131kabilir.<\/h1>\n<p>IHS\u2019nin bir \u00f6nceki tahmini olan 123 GW\u2019yi olumlu revize edilen raporu Bloomberg New Energy Finance <img loading=\"lazy\" class=\"alignleft size-medium wp-image-92429\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/kuresel-fotovoltaik-enerji-pv-kurulu-gucu-2019da-129-gwa-cikabilir-300x157.jpg\" alt=\"\" width=\"300\" height=\"157\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/kuresel-fotovoltaik-enerji-pv-kurulu-gucu-2019da-129-gwa-cikabilir-300x157.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/kuresel-fotovoltaik-enerji-pv-kurulu-gucu-2019da-129-gwa-cikabilir-500x262.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/kuresel-fotovoltaik-enerji-pv-kurulu-gucu-2019da-129-gwa-cikabilir-80x42.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/05\/kuresel-fotovoltaik-enerji-pv-kurulu-gucu-2019da-129-gwa-cikabilir.jpg 764w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>(BNEF)\u2019\u0131n 125 GW-141 GW aral\u0131\u011f\u0131ndaki 2019 y\u0131l\u0131 tahminleriyle \u00f6rt\u00fc\u015fmektedir.<\/p>\n<p>Tahminlere g\u00f6re \u00c7in liderli\u011fini korumay\u0131 s\u00fcrd\u00fcr\u00fcrken ABD ikinci en b\u00fcy\u00fck pazar olacak ve \u015firketlerin % 30 <strong>yat\u0131r\u0131m vergisi kredisinden<\/strong> (ITC) yararlanmas\u0131 pazar\u0131n b\u00fcy\u00fcmesini olumlu etkilemeyi s\u00fcrd\u00fcrecek.<\/p>\n<p>IHS Markit, Avrupa pazar\u0131nda ise 2018\u2019de % 23\u2019ten % 12\u2019ye gerileyen PV kurulumlar\u0131n\u0131n, 2019 y\u0131l\u0131nda 19 GW\u2019ye ula\u015faca\u011f\u0131n\u0131 ve \u0130spanya\u2019n\u0131n toplam b\u00fcy\u00fcmenin % 60\u2019\u0131ndan sorumlu olaca\u011f\u0131n\u0131 ifade etmektedir.<\/p>\n<p>Asya\u2019n\u0131n, 2019&#8217;da % 64 ile toplam kurulumlar i\u00e7inde en y\u00fcksek paya sahip olaca\u011f\u0131 bunu % 16 ile Amerika k\u0131tas\u0131n\u0131n, % 15 ile Avrupa ve Afrika\u2019n\u0131n, % 5 ile\u00a0Orta Do\u011fu\u2019nun takip edece\u011fi belirtilmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Londra merkezli ara\u015ft\u0131rma firmas\u0131 olan IHS Markit\u2019in yay\u0131nlad\u0131\u011f\u0131 &#8220;PV Installations Tracker 2019&#8221; \u00e7eyrek d\u00f6nem raporuna g\u00f6re, k\u00fcresel fotovoltaik (PV) kurulumlar\u0131 y\u0131ll\u0131k % [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":92429,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[1198,1976,3512,1964,6398,2630,4559,886,67,1009,50562,50556,38670,50561,23416,23133,34925,23131,37049,4353,44455,50558,10665,2534,50557,50560,34977,50559,26829],"views":865,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/92427"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=92427"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/92427\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/92429"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=92427"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=92427"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=92427"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}