{"id":9236,"date":"2013-04-04T16:58:34","date_gmt":"2013-04-04T13:58:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=9236"},"modified":"2013-04-04T16:58:34","modified_gmt":"2013-04-04T13:58:34","slug":"iki-ayda-365-mw-yeni-kurulu-guc","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/iki-ayda-365-mw-yeni-kurulu-guc\/","title":{"rendered":"(Turkish) \u0130ki Ayda 365 MW Yeni Kurulu G\u00fc\u00e7"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/9236\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye`de \u00f6zel sekt\u00f6r elektrik \u00fcretiminde y\u0131l\u0131n ilk iki ay\u0131nda 32 tesisle 365.7 megawatt`l\u0131k kurulu g\u00fc\u00e7 daha devreye girdi.<\/strong><\/p>\n<p>D\u00fcnya Gazetesi\u2019nden Mehmet Kara\u2019n\u0131n haberine g\u00f6re, T\u00fcrkiye`de \u00f6zel sekt\u00f6r\u00fcn elektrik \u00fcretiminde bu y\u0131l\u0131n ilk iki ay\u0131nda devreye soktu\u011fu toplam kurulu g\u00fc\u00e7 366 MW`ye ula\u015ft\u0131. Enerji Piyasas\u0131 D\u00fczenleme Kurumu verilerine g\u00f6re, T\u00fcrkiye`de\u00a0 \u00f6zel sekt\u00f6r bu y\u0131l\u0131n Ocak ve \u015eubat aylar\u0131nda 32 adet elektrik \u00fcretim tesisini daha devreye soktu. B\u00f6ylece T\u00fcrkiye`de \u00f6zel sekt\u00f6r\u00fcn 2003 y\u0131l\u0131ndan bu yana devreye soktu\u011fu elektrik \u00fcretim tesislerinin say\u0131s\u0131 726`ya, bu santrallerin toplam kurulu g\u00fcc\u00fc ise 20 bin megawatt`a (MW) dayand\u0131.<\/p>\n<p>Bu y\u0131l\u0131n ilk iki ay\u0131nda devreye giren yat\u0131r\u0131mlardan biri 1.5 MW g\u00fcc\u00fcndeki <strong>\u00e7\u00f6p gaz\u0131 tesisi<\/strong>. Bir di\u011fer tesis ise 2.8 MW g\u00fcc\u00fcndeki <strong>biyogaza dayal\u0131 elektrik \u00fcretim santrali<\/strong> oldu. Yeni devreye al\u0131nan tesisler aras\u0131nda en b\u00fcy\u00fck pay, hem adet a\u00e7\u0131s\u0131ndan hem d<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/elektrik-uretimi-yeni-kurulu-guc.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-9237\" title=\"elektrik-uretimi-yeni-kurulu-guc\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/elektrik-uretimi-yeni-kurulu-guc-300x205.jpg\" alt=\"\" width=\"300\" height=\"205\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/elektrik-uretimi-yeni-kurulu-guc-300x205.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/elektrik-uretimi-yeni-kurulu-guc-500x342.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/elektrik-uretimi-yeni-kurulu-guc-72x50.jpg 72w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/elektrik-uretimi-yeni-kurulu-guc.jpg 732w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>e kurulu g\u00fc\u00e7 a\u00e7\u0131s\u0131ndan <strong>hidroelektrik<\/strong> santrallerine ait. Devreye al\u0131nan 17 adet hidroelektrik santralinin toplam kurulu g\u00fcc\u00fc ise 167 megawatt d\u00fczeyinde. Son eklenenlerle birlikte T\u00fcrkiye`de \u00f6zel sekt\u00f6r taraf\u0131ndan 2003 y\u0131l\u0131ndan bu yana i\u015fletmeye al\u0131nan toplam HES say\u0131s\u0131 287`ye, bu tesislerin toplam kurulu g\u00fcc\u00fc ise 5 bin 845.9 MW`ye y\u00fckseldi.<\/p>\n<p><strong>DO\u011eALGAZDAN VAZGE\u00c7\u0130LM\u0130YOR<\/strong><\/p>\n<p>Her ne kadar elektrik \u00fcretiminde do\u011falgazda a\u015f\u0131r\u0131 ba\u011f\u0131ml\u0131l\u0131k ele\u015ftirilse de bu kayna\u011fa dayal\u0131 \u00fcretim yat\u0131r\u0131mlar\u0131 devam ediyor. Y\u0131l\u0131n ilk 2 ay\u0131nda do\u011falgaza dayal\u0131 5 yeni tesis daha devreye al\u0131nd\u0131. Bu tesislerin toplam kurulu g\u00fcc\u00fc 80.6 megawatt d\u00fczeyinde. Son devreye girenlerle birlikte \u00f6zel sekt\u00f6r eliyle 2003 y\u0131l\u0131ndan bu yana i\u015fletmeye al\u0131nan do\u011falgaza dayal\u0131 elektrik \u00fcretim tesisi say\u0131s\u0131 255`e, bunlar\u0131n toplam kurulu g\u00fcc\u00fc ise 7 bin 977 MW`ye ula\u015ft\u0131.<\/p>\n<p>Hem kurulu g\u00fc\u00e7 hem de toplam tesis say\u0131s\u0131 a\u00e7\u0131s\u0131ndan hidroelektrik ve do\u011falgaza dayal\u0131 santrallerin arkas\u0131ndan gelen \u00fc\u00e7\u00fcnc\u00fc s\u0131radaki tesis t\u00fcr\u00fc ise r\u00fczgar santralleri oldu. Ocak ve \u015fubat aylar\u0131nda devreye al\u0131nan 7 adet r\u00fczgara dayal\u0131 elektrik \u00fcretim tesisinin toplam kurulu g\u00fcc\u00fc 76.9 MW d\u00fczeyinde. B\u00f6ylece T\u00fcrkiye`de 2003 y\u0131l\u0131ndan bu yana i\u015fletmeye r\u00fczgara dayal\u0131 elektrik \u00fcretim tesisleri say\u0131s\u0131 103`e, toplam kurulu g\u00fc\u00e7leri ise 2 bin 321 MW`ye y\u00fckseldi.<\/p>\n<p><strong>L\u0130NY\u0130TTE 107.6 MW<\/strong><\/p>\n<p>EPDK kay\u0131tlar\u0131na g\u00f6re Ocak \u015eubat aylar\u0131nda bir adet de linyite dayal\u0131 elektrik \u00fcretim tesisi devreye al\u0131nd\u0131. Bu tip elektrik santrallerinin say\u0131s\u0131 8`e, toplam kurulu g\u00fc\u00e7leri ise 107.6 MW`ye \u00e7\u0131kt\u0131. T\u00fcrkiye`nin hedefi&#8230; Bu y\u0131l devletin hedefledi\u011fi ya da tahmin etti\u011fi kurulu g\u00fc\u00e7 art\u0131\u015f oran\u0131 y\u00fczde 3. Ancak sekt\u00f6r kaynaklar\u0131\u00a0 bunun \u00e7ok m\u00fctevaz\u0131 bir hedef oldu\u011funu belirtirken, devreye al\u0131nacak ilave kurulu g\u00fcc\u00fcn bunun \u00e7ok \u00e7ok \u00fczerinde olaca\u011f\u0131n\u0131 d\u00fc\u015f\u00fcn\u00fcyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/iki-ayda-365-mw-yeni-kurulu-guc_3020.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye`de \u00f6zel sekt\u00f6r elektrik \u00fcretiminde y\u0131l\u0131n ilk iki ay\u0131nda 32 tesisle 365.7 megawatt`l\u0131k kurulu g\u00fc\u00e7 daha devreye girdi. D\u00fcnya Gazetesi\u2019nden Mehmet Kara\u2019n\u0131n haberine [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9237,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53,47,50],"tags":[4183,3709,92,4184,19,67,1046,750,35370,1090,4186,16,4185],"views":920,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9236"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=9236"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9236\/revisions"}],"predecessor-version":[{"id":9238,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9236\/revisions\/9238"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9237"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=9236"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=9236"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=9236"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}