{"id":9229,"date":"2013-04-04T16:47:22","date_gmt":"2013-04-04T13:47:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=9229"},"modified":"2013-04-04T16:50:06","modified_gmt":"2013-04-04T13:50:06","slug":"bp-yenilenebilir-enerji-sektorunden-cekiliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bp-yenilenebilir-enerji-sektorunden-cekiliyor\/","title":{"rendered":"(Turkish) BP Yenilenebilir Enerji Sekt\u00f6r\u00fcnden \u00c7ekiliyor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/9229\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>BP PLC, ABD\u2019de yenilenebili<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/bp-petrol-75-505x283-yenilenebilir-enerji-sektoru.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-9230\" title=\"bp-petrol-75-505x283-yenilenebilir-enerji-sektoru\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/bp-petrol-75-505x283-yenilenebilir-enerji-sektoru-300x184.jpg\" alt=\"\" width=\"300\" height=\"184\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/bp-petrol-75-505x283-yenilenebilir-enerji-sektoru-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/bp-petrol-75-505x283-yenilenebilir-enerji-sektoru-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/bp-petrol-75-505x283-yenilenebilir-enerji-sektoru.jpg 461w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>r enerji sekt\u00f6r\u00fcnden \u00e7ekilen b\u00fcy\u00fck petrol \u015firketleri kervan\u0131na kat\u0131l\u0131yor.<\/strong><\/p>\n<p>BP, ABD\u2019de r\u00fczgar \u00e7iftli\u011fi operasyonlar\u0131n\u0131 sat\u0131\u015fa \u00e7\u0131kard\u0131. ABD\u2019nin en b\u00fcy\u00fck r\u00fczgar \u00e7iftliklerinden birininde sahibi olan BP, 9 eyalette toplam 16 r\u00fczgar \u00e7iftli\u011fi i\u015fletiyor. Bu r\u00fczgar \u00e7iftliklerinin toplam kurulu kapasiteli 2.600 megawatt.<\/p>\n<p>Uzmanlar, BP\u2019nin bu sat\u0131\u015ftan <strong>1.5 milyar Dolar<\/strong> elde edebilece\u011fini ifade ediyorlar.<\/p>\n<p>BP hali haz\u0131rda kendini yeniden konumlamak ve ABD\u2019yi etkileyen <strong>petrol s\u0131z\u0131nt\u0131s\u0131n\u0131n<\/strong> <strong>tazminatlar\u0131n\u0131<\/strong> \u00f6demek i\u00e7in 38 milyar Dolar tutar\u0131nda varl\u0131\u011f\u0131n\u0131 satt\u0131 veya sat\u0131\u015fa \u00e7\u0131kard\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/04\/04\/bp-yenilenebilir-enerji-sektorunden-cekiliyor\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.BP PLC, ABD\u2019de yenilenebilir enerji sekt\u00f6r\u00fcnden \u00e7ekilen b\u00fcy\u00fck petrol \u015firketleri kervan\u0131na kat\u0131l\u0131yor. BP, ABD\u2019de r\u00fczgar \u00e7iftli\u011fi operasyonlar\u0131n\u0131 sat\u0131\u015fa \u00e7\u0131kard\u0131. ABD\u2019nin en b\u00fcy\u00fck r\u00fczgar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9230,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,44,50],"tags":[853,4181,4182,67,165,59,474,69,233,16,105,3940],"views":666,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9229"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=9229"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9229\/revisions"}],"predecessor-version":[{"id":9235,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9229\/revisions\/9235"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9230"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=9229"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=9229"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=9229"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}