{"id":91698,"date":"2019-04-27T22:54:01","date_gmt":"2019-04-27T19:54:01","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=91698"},"modified":"2019-04-28T00:23:36","modified_gmt":"2019-04-27T21:23:36","slug":"limak-holdingin-konyadaki-gunes-santrali-yil-sonunda-faaliyete-gececek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/limak-holdingin-konyadaki-gunes-santrali-yil-sonunda-faaliyete-gececek\/","title":{"rendered":"(Turkish) &#8217;Limak Holding&#8217;in Konya\u2019daki G\u00fcne\u015f Santrali Y\u0131l Sonu Faaliyete Ge\u00e7ecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/91698\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Limak Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Nihat \u00d6zdemir taraf\u0131ndan Konya\u2019da 13,5 mw g\u00fcce sahip 2&#8217;inci g\u00fcne\u015f enerjisi santralinin <img loading=\"lazy\" class=\"alignleft size-medium wp-image-91700\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/limak-holdingin-konyadaki-gunes-santrali-yil-sonunda-faaliyete-gececek1-300x192.jpg\" alt=\"\" width=\"300\" height=\"192\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/limak-holdingin-konyadaki-gunes-santrali-yil-sonunda-faaliyete-gececek1-300x192.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/limak-holdingin-konyadaki-gunes-santrali-yil-sonunda-faaliyete-gececek1-78x50.jpg 78w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/limak-holdingin-konyadaki-gunes-santrali-yil-sonunda-faaliyete-gececek1.jpg 468w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>bu y\u0131l sonuna do\u011fru elektrik \u00fcretimine ge\u00e7ece\u011fi a\u00e7\u0131kland\u0131.<\/h1>\n<p>Limak Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Nihat \u00d6zdemir, hidroelektrik alan\u0131nda b\u00fcy\u00fcd\u00fckleri gibi g\u00fcne\u015f enerjisinde de kapasitelerini art\u0131rmay\u0131 hedeflediklerini belirterek &#8220;Isparta\u2019da 5,5 mw g\u00fcce sahip g\u00fcne\u015f enerjisi santralimizi devreye ald\u0131k. Konya\u2019da 13,5 mw 2&#8217;inci g\u00fcne\u015f enerjisi santralimiz bu y\u0131l sonuna do\u011fru elektrik \u00fcretimine ge\u00e7ecek. Daha \u00f6nceden Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA) ihalelerine kat\u0131ld\u0131k fakat almak k\u0131smet olmad\u0131. Bundan sonra bir\u00e7ok ilde daha k\u00fc\u00e7\u00fck kapasitelerde hem r\u00fczgar hem g\u00fcne\u015f YEKA ihaleleri ger\u00e7ekle\u015fecek. Bu ihalelerle yak\u0131ndan ilgileniyoruz.\u201d ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Limak Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Nihat \u00d6zdemir taraf\u0131ndan Konya\u2019da 13,5 mw g\u00fcce sahip 2&#8217;inci g\u00fcne\u015f enerjisi santralinin bu y\u0131l sonuna do\u011fru elektrik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":91700,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[34979,19638,26353,19,67,1009,23416,2569,23133,34925,23131,2441,4797,48949,2829,34977,25578,32142,26829,31711],"views":1200,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/91698"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=91698"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/91698\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/91700"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=91698"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=91698"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=91698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}