{"id":91632,"date":"2019-04-25T22:41:51","date_gmt":"2019-04-25T19:41:51","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=91632"},"modified":"2019-04-25T22:44:36","modified_gmt":"2019-04-25T19:44:36","slug":"turkiye-50-bin-kisiyi-gunes-enerjisi-sektorunde-istihdam-ediyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-50-bin-kisiyi-gunes-enerjisi-sektorunde-istihdam-ediyor\/","title":{"rendered":"(Turkish) &#8217;T\u00fcrkiye&#8217; 50 Bin Ki\u015fiyi G\u00fcne\u015f Enerjisi Sekt\u00f6r\u00fcnde \u0130stihdam Ediyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/91632\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>T\u00fcrkiye\u2019nin \u00c7in, ABD, Hindistan ve Japonya\u2019dan sonra 2017&#8217;de PV g\u00fcne\u015f enerjisi kurulu g\u00fcc\u00fcn\u00fc en \u00e7ok art\u0131ran 5&#8217;inci \u00fclke oldu\u011funu belirten G\u00dcNDER Ba\u015fkan\u0131 Kutay Kaleli, son d\u00f6nemde hareketlili\u011fin olduk\u00e7a artt\u0131\u011f\u0131 di\u011fer pazarlar\u0131n da Kuzey Afrika, Hollanda ve Portekiz oldu\u011funu dile getirdi.<\/h1>\n<p>G\u00fcne\u015f enerjisi kurulu g\u00fcc\u00fcn\u00fc d\u00f6rt y\u0131l i\u00e7inde 100 kat\u0131na y\u00fckselten T\u00fcrkiye\u2019de istihdam verilerine g\u00f6re yakla\u015f\u0131k 50 bin ki\u015finin g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcnde \u00e7al\u0131\u015ft\u0131\u011f\u0131 bilgisini belirten Kaleli, &#8220;\u00d6n\u00fcm\u00fczdeki y\u0131llarda, g\u00fcne\u015f enerjisindeki kurulu g\u00fcc\u00fcn 2023&#8217;de en az 14 GW, 2030&#8217;da ise en az 38 GW\u2019a y\u00fckselmesi bekleniyor. T\u00fcrkiye\u2019de 2014&#8217;\u00fcn sonunda sadece 40 MW olan g\u00fcne\u015f enerjisi kurulu g\u00fcc\u00fc, Temmuz<\/p>\n<h2><img loading=\"lazy\" class=\"alignright size-medium wp-image-91634\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/turkiye-50-bin-kisiyi-gunes-enerjisi-sektorunde-istihdam-ediyor-300x177.jpg\" alt=\"\" width=\"300\" height=\"177\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/turkiye-50-bin-kisiyi-gunes-enerjisi-sektorunde-istihdam-ediyor-300x177.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/turkiye-50-bin-kisiyi-gunes-enerjisi-sektorunde-istihdam-ediyor-500x294.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/turkiye-50-bin-kisiyi-gunes-enerjisi-sektorunde-istihdam-ediyor-80x47.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/turkiye-50-bin-kisiyi-gunes-enerjisi-sektorunde-istihdam-ediyor.jpg 678w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/h2>\n<p>2018\u2019in sonunda 4 bin 800 MW seviyesine \u00e7\u0131kt\u0131. G\u00fcne\u015f enerjisi toplam kurulu g\u00fcc\u00fcn y\u00fczde 5\u2019ini a\u015ft\u0131, ayl\u0131k \u00fcretimde pay\u0131 Nisan 2018\u2019de y\u00fczde 3 seviyesine \u00e7\u0131kt\u0131. 2014\u2019\u00fcn sonundan bu yana elektrik enerjisi kurulu g\u00fcc\u00fcndeki net art\u0131\u015f\u0131n y\u00fczde 25\u2019i g\u00fcne\u015f enerjisi alan\u0131nda ger\u00e7ekle\u015fti\u201d dedi.<\/p>\n<h2>&#8220;Y\u0131ll\u0131k G\u00fcne\u015flenme S\u00fcresi 2 Bin 640 Saat&#8221;<\/h2>\n<p>K\u00fcresel olarak bakt\u0131\u011f\u0131m\u0131zda T\u00fcrkiye\u2019nin bulundu\u011fu co\u011frafi konumuyla g\u00fcne\u015f enerjisi i\u00e7in uygun b\u00f6lgelerden biri oldu\u011funu a\u00e7\u0131klayan Kaleli, &#8220;Ortalama y\u0131ll\u0131k toplam g\u00fcne\u015flenme s\u00fcresi 2 bin 640 saattir. 1 MW kurulu g\u00fcc\u00fcnde bir tesisten y\u0131lda 1 milyon 750 bin kWh\u2019lik bir enerji sa\u011flanabilir. G\u00fcne\u015f enerjisi sekt\u00f6r\u00fc \u00f6zelinde 2018 y\u0131l\u0131 art\u0131k yeni saha tipi lisanss\u0131z projelerine y\u00f6nelik kapasitelerin verilmedi\u011fi, ancak \u00e7at\u0131 pazar\u0131 i\u00e7in mevzuat\u0131n kalan \u00e7ok ufak eksiklerle d\u00fczeltildi\u011fi, \u00e7at\u0131da kurulumun \u00f6n\u00fcn\u00fcn a\u00e7\u0131ld\u0131\u011f\u0131 y\u0131l olmu\u015ftur.&#8221; ifadelerini kulland\u0131.<\/p>\n<h2>&#8220;T\u00fcrkiye\u2019nin Potansiyeli Y\u00fcksek&#8221;<\/h2>\n<p>T\u00fcrkiye\u2019nin g\u00fcne\u015f enerjisi potansiyelinin \u00e7ok y\u00fcksek oldu\u011funu belirten Kaleli, &#8220;Devletin \u00f6zel sekt\u00f6r yat\u0131r\u0131mc\u0131s\u0131n\u0131n yerine kendisini koymas\u0131 gerekiyor. \u0130ki \u00f6nemli kavram\u0131n da alt\u0131n\u0131n doldurulmas\u0131 <span style=\"text-decoration: underline;\">laz\u0131m;<\/span> yap\u0131labilirlik ve finans. 2020 y\u0131l\u0131 sonunda YEKDEM mekanizmas\u0131 son bulacak. Ancak fiyattan ziyade mutlaka al\u0131m garantisiyle yat\u0131r\u0131m\u0131n desteklenmesi gerekir. Al\u0131m garantileri finanse edilebilirlik noktas\u0131nda T\u00fcrkiye, yat\u0131r\u0131m ve yat\u0131r\u0131mc\u0131 \u00e7ekmek i\u00e7in olmazsa olmaz. Di\u011fer yandan, malzemeler gittik\u00e7e ucuzluyor. Do\u011fru bir ihale modeli ile T\u00fcrkiye\u2019ye katk\u0131 sa\u011flayacak sonu\u00e7lara ula\u015f\u0131labilir. T\u00fcrkiye\u2019nin g\u00fcne\u015f enerjisi kurulu g\u00fcc\u00fcn\u00fcn 2023 y\u0131l\u0131nda en az 14 GW, 2030 y\u0131l\u0131nda ise 38 GW\u2019a y\u00fckselmesi gerekiyor&#8221; dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin \u00c7in, ABD, Hindistan ve Japonya\u2019dan sonra 2017&#8217;de PV g\u00fcne\u015f enerjisi kurulu g\u00fcc\u00fcn\u00fc en \u00e7ok art\u0131ran 5&#8217;inci \u00fclke oldu\u011funu belirten G\u00dcNDER Ba\u015fkan\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":91634,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[49868,26659,35224,67,1009,1382,23416,19757,23133,34925,23131,35120,48945,49867,34977,29410,26829],"views":1245,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/91632"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=91632"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/91632\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/91634"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=91632"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=91632"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=91632"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}