{"id":91393,"date":"2019-04-20T14:21:15","date_gmt":"2019-04-20T11:21:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=91393"},"modified":"2019-04-20T14:25:22","modified_gmt":"2019-04-20T11:25:22","slug":"guneste-mini-yeka-ihalelerinin-bu-yil-icinde-yapilmasi-beklenmektedir","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/guneste-mini-yeka-ihalelerinin-bu-yil-icinde-yapilmasi-beklenmektedir\/","title":{"rendered":"(Turkish) G\u00fcne\u015fte &#8220;Mini YEKA&#8221; \u0130halelerinin Bu Y\u0131l \u0130\u00e7inde Yap\u0131lmas\u0131 Beklenmektedir"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/91393\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Uluslararas\u0131 G\u00fcne\u015f Enerjisi Toplulu\u011fu T\u00fcrkiye B\u00f6l\u00fcm\u00fc (G\u00dcNDER) Y\u00f6netim Kurulu Ba\u015fkan\u0131 Kutay Kaleli, 12. Uluslararas\u0131 G\u00fcne\u015f Enerji ve Teknolojileri Fuar\u0131 Solarex&#8217;te G\u00dcNDER, G\u00fcne\u015f Enerjisi Sanayicileri ve End\u00fcstrisi Derne\u011fi (GENSED) ve G\u00fcne\u015f Enerjisi Yat\u0131r\u0131mc\u0131lar\u0131 Derne\u011fi (G\u00dcYAD) taraf\u0131ndan ger\u00e7ekle\u015ftirilen oturumda<\/h1>\n<h1><img loading=\"lazy\" class=\"alignright size-medium wp-image-91395\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/guneste-mini-yeka-ihalelerinin-bu-yil-icinde-yapilmasi-beklenmektedir-300x180.jpg\" alt=\"\" width=\"300\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/guneste-mini-yeka-ihalelerinin-bu-yil-icinde-yapilmasi-beklenmektedir-300x180.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/guneste-mini-yeka-ihalelerinin-bu-yil-icinde-yapilmasi-beklenmektedir-768x461.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/guneste-mini-yeka-ihalelerinin-bu-yil-icinde-yapilmasi-beklenmektedir-500x300.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/guneste-mini-yeka-ihalelerinin-bu-yil-icinde-yapilmasi-beklenmektedir-80x48.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/guneste-mini-yeka-ihalelerinin-bu-yil-icinde-yapilmasi-beklenmektedir.jpg 813w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/h1>\n<h1>a\u00e7\u0131klamalarda bulundu.<\/h1>\n<p>Lisanss\u0131z Elektrik Y\u00f6netmeli\u011fi Tasla\u011f\u0131\u2019n\u0131n onayland\u0131\u011f\u0131 ve yay\u0131mlanaca\u011f\u0131n\u0131 belirten Kaleli, taslakta jeotermal, biyok\u00fctle ve biyogaz tesislerinin elektrik ihtiya\u00e7lar\u0131n\u0131 g\u00fcne\u015f enerjisinden kar\u015f\u0131layabilmelerine y\u00f6nelik bir madde eklendi\u011fini, bu maddenin s\u00f6z konusu tesislere y\u00f6nelik \u00e7ok olumlu bir geli\u015fme oldu\u011funu dile getirdi.<\/p>\n<p>Ayr\u0131ca Kaleli, daha \u00f6nceden \u00e7a\u011fr\u0131 mektuplar\u0131 verilmi\u015f fakat s\u00fcreleri dolan 1500 mw&#8217;l\u0131k lisanss\u0131z g\u00fcne\u015f enerjisi santrallerine y\u00f6nelik resen s\u00fcre uzat\u0131m\u0131 yap\u0131lmas\u0131n\u0131 istediklerini, bu projelerin s\u00fcrelerinin <strong>31 Aral\u0131k 2020<\/strong>\u2019nin sonuna kadar uzat\u0131lmas\u0131 durumunda s\u00f6z konusu kapasitenin b\u00fcy\u00fck b\u00f6l\u00fcm\u00fcn\u00fcn hayata ge\u00e7irilebilece\u011fini s\u00f6yledi.<\/p>\n<p>Mini YEKA&#8217;lara y\u00f6nelik geli\u015fmeler i\u00e7inde a\u00e7\u0131klamalar yapan Kaleli, &#8220;<strong>YEKA-1<\/strong> 1000 mw olarak yap\u0131ld\u0131, <strong>YEKA-2<\/strong> iptal edildi. \u015eimdi <strong>YEKA-3<\/strong> kapsam\u0131ndaki proje kapasiteleri daha k\u00fc\u00e7\u00fck miktarlarda olacak. T\u00fcrkiye\u2019nin en do\u011fusundan bat\u0131s\u0131na 35-40 ilde, kapasiteleri 10 &#8211; 50 mw aral\u0131\u011f\u0131nda de\u011fi\u015fecek kurulumlar i\u00e7in ihalelerin bu y\u0131l i\u00e7inde yap\u0131lmas\u0131n\u0131 beklemekteyiz. 3&#8217;\u00fcnc\u00fc \u00e7eyre\u011fe sarkmayaca\u011f\u0131n\u0131 d\u00fc\u015f\u00fcn\u00fcyoruz. Bu \u015fekilde k\u00fc\u00e7\u00fck kapasiteleri yat\u0131r\u0131mc\u0131lar kendi \u00f6z kaynaklar\u0131yla hayata ge\u00e7irebilirler. <strong>YEKA-3<\/strong> kapsam\u0131nda her yat\u0131r\u0131mc\u0131 kendi arazisini bulacak ve di\u011fer s\u00fcre\u00e7lerini tamamlayacak. Bu s\u00fcre\u00e7ler zaman ald\u0131\u011f\u0131 i\u00e7in projelerin tamamlanmas\u0131 1,5-2 y\u0131l s\u00fcrerek 2021\u2019i bulabilir.&#8221;<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Uluslararas\u0131 G\u00fcne\u015f Enerjisi Toplulu\u011fu T\u00fcrkiye B\u00f6l\u00fcm\u00fc (G\u00dcNDER) Y\u00f6netim Kurulu Ba\u015fkan\u0131 Kutay Kaleli, 12. Uluslararas\u0131 G\u00fcne\u015f Enerji ve Teknolojileri Fuar\u0131 Solarex&#8217;te G\u00dcNDER, G\u00fcne\u015f [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":91395,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[49667,34979,19638,34980,26353,42030,67,1009,727,35038,1382,23416,15237,35039,32191,23133,34925,23131,679,32192,35120,49668,49669,45357,38787,17901,41411,44799,48946],"views":769,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/91393"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=91393"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/91393\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/91395"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=91393"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=91393"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=91393"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}