{"id":91358,"date":"2019-04-19T23:03:52","date_gmt":"2019-04-19T20:03:52","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=91358"},"modified":"2019-04-19T23:05:48","modified_gmt":"2019-04-19T20:05:48","slug":"yeka-res-2-yarismalari-icin-9-sirket-basvuru-yapti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yeka-res-2-yarismalari-icin-9-sirket-basvuru-yapti\/","title":{"rendered":"(Turkish) YEKA RES-2 Yar\u0131\u015fmalar\u0131 \u0130\u00e7in 9 \u015eirket Ba\u015fvuru Yapt\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/91358\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan toplamda 1000 mw kapasiteli d\u00f6rt farkl\u0131 b\u00f6lge i\u00e7in ger\u00e7ekle\u015ftirece\u011fi 2&#8217;inci R\u00fczgar Enerjisi Yenilenebilir Enerji Kaynak Alan\u0131 (YEKA RES-2) ihalesine 9 \u015firket ba\u015fvuru yapt\u0131.<\/h1>\n<p>\u0130haleye kat\u0131lmak i\u00e7in ba\u015fvuran \u015firketlerin isimlerini bakanl\u0131kta d\u00fczenlenen toplant\u0131da Bakan Yard\u0131mc\u0131s\u0131 <img loading=\"lazy\" class=\"alignright size-medium wp-image-91360\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/yeka-res-2-yarismalari-icin-9-sirket-basvuru-yapti1-300x174.jpg\" alt=\"\" width=\"300\" height=\"174\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/yeka-res-2-yarismalari-icin-9-sirket-basvuru-yapti1-300x174.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/yeka-res-2-yarismalari-icin-9-sirket-basvuru-yapti1-500x290.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/yeka-res-2-yarismalari-icin-9-sirket-basvuru-yapti1-80x46.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/yeka-res-2-yarismalari-icin-9-sirket-basvuru-yapti1.jpg 620w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Abdullah Tancan a\u00e7\u0131klan\u0131rken Bal\u0131kesir, \u00c7anakkale, Ayd\u0131n ve Mu\u011fla b\u00f6lgeleri i\u00e7in belirlenen 250\u2019\u015fer mw kapasiteli r\u00fczgar enerjisi santrali projesi toplamda 1 milyar dolar yat\u0131r\u0131m ile yap\u0131lacakt\u0131r. S\u00f6z konusu RES\u2019ler tamamland\u0131\u011f\u0131nda 1 milyon 200 bin hanenin elektrik ihtiyac\u0131n\u0131n kar\u015f\u0131lanaca\u011f\u0131 \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>Tarihi daha sonra a\u00e7\u0131klanacak olan ihale, a\u00e7\u0131k eksiltme usul\u00fcyle ger\u00e7ekle\u015ftirilecek ve kilovatsaat ba\u015f\u0131na tavan fiyat 5,5 dolar\/cent olacakt\u0131r. \u0130haleye girecek \u015firketler her b\u00f6lge i\u00e7in fiyat teklifi sunacak olup YEKA RES-2 ihalesi \u00e7er\u00e7evesinde kurulacak tesislere y\u00f6nelik lisans s\u00fcresi ise 49 y\u0131l olacakt\u0131r.<\/p>\n<p><strong>S\u00f6z Konusu 9 \u015eirketin B\u00f6lgelere G\u00f6re <span style=\"text-decoration: underline;\">Da\u011f\u0131l\u0131m\u0131 \u015eu \u015eekildedir;<\/span><\/strong><\/p>\n<p><strong>Bal\u0131kesir B\u00f6lgesi<\/strong><\/p>\n<p>\u2013 Enercon R\u00fczgar Enerji Santrali Kurulum Hizmetleri Ltd.\u015eti<br \/>\n\u2013 Bey\u00e7elik Elewan Yenilenebilir Enerji \u00dcretim A\u015e<br \/>\n\u2013 RES Anatolia Holding A\u015e<br \/>\n\u2013 Enerjisa \u00dcretim Santralleri A\u015e<br \/>\n\u2013 B. Erg\u00fcnler Yol Yap\u0131 \u0130n\u015faat, Taahh\u00fct, Madencilik, Nakliyecilik, Sanayi Ticaret A\u015e<br \/>\n\u2013 Eze \u0130n\u015faat A\u015e<br \/>\n\u2013 \u00c7inili RES Enerji \u00dcretim Sanayi Tic. A\u015e<br \/>\n\u2013 \u0130klim Elektrik Yat\u0131r\u0131m, Sanayi ve Ticaret A\u015e<\/p>\n<p><strong>\u00c7anakkale B\u00f6lgesi<\/strong><\/p>\n<p>\u2013 Enercon R\u00fczgar Enerji Santrali Kurulum Hizmetleri Ltd.\u015eti<br \/>\n\u2013 Bey\u00e7elik Elewan Yenilenebilir Enerji \u00dcretim A\u015e<br \/>\n\u2013 Enerjisa \u00dcretim Santralleri A\u015e<br \/>\n\u2013 Eze \u0130n\u015faat A\u015e<br \/>\n\u2013 Gem Wind Sanayi Tic. A\u015e<br \/>\n\u2013 \u0130klim Elektrik Yat\u0131r\u0131m, Sanayi ve Ticaret A\u015e<\/p>\n<p><strong>Ayd\u0131n B\u00f6lgesi<\/strong><\/p>\n<p>\u2013 Enercon R\u00fczgar Enerji Santrali Kurulum Hizmetleri Ltd.\u015eti<br \/>\n\u2013 Enerjisa \u00dcretim Santralleri A\u015e<br \/>\n\u2013 Eze \u0130n\u015faat Anonim \u015eirket<br \/>\n\u2013 \u0130klim Elektrik Yat\u0131r\u0131m ve Sanayi Ticaret A\u015e<\/p>\n<p><strong>Mu\u011fla B\u00f6lgesi<\/strong><\/p>\n<p>\u2013 Enercon R\u00fczgar Enerji Santrali Kurulum Hizmetleri Ltd.\u015eti<br \/>\n\u2013 Enerjisa \u00dcretim Santralleri A\u015e<br \/>\n\u2013 Eze \u0130n\u015faat A\u015e<br \/>\n\u2013 \u0130klim Elektrik Yat\u0131r\u0131m, Sanayi ve Ticaret A\u015e<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan toplamda 1000 mw kapasiteli d\u00f6rt farkl\u0131 b\u00f6lge i\u00e7in ger\u00e7ekle\u015ftirece\u011fi 2&#8217;inci R\u00fczgar Enerjisi Yenilenebilir Enerji Kaynak Alan\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":91360,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[34979,19638,26353,42030,63,67,1009,1972,2054,35002,24949,30144,35004,49650,34961,34960,34977,25578,45607,40533,26829],"views":1056,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/91358"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=91358"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/91358\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/91360"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=91358"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=91358"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=91358"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}