{"id":90923,"date":"2019-04-12T13:32:50","date_gmt":"2019-04-12T10:32:50","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=90923"},"modified":"2019-04-12T13:34:14","modified_gmt":"2019-04-12T10:34:14","slug":"yekdemden-yararlanma-suresi-uzatildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yekdemden-yararlanma-suresi-uzatildi\/","title":{"rendered":"(Turkish) YEKDEM\u2019den Yararlanma S\u00fcresi Uzat\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/90923\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><img loading=\"lazy\" class=\"wp-image-90924 alignright\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/YEKDEM-300x199.jpg\" alt=\"\" width=\"285\" height=\"189\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/YEKDEM-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/YEKDEM-768x508.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/YEKDEM-1024x678.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/YEKDEM-500x331.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/YEKDEM-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/YEKDEM-450x300.jpg 450w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/YEKDEM.jpg 1580w\" sizes=\"(max-width: 285px) 100vw, 285px\" \/>5346 say\u0131l\u0131 Yenilenebilir Enerji Kaynaklar\u0131n\u0131n Elektrik Enerjisi \u00dcretimi Ama\u00e7l\u0131 Kullan\u0131m\u0131na \u0130li\u015fkin Kanun, Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) kararlar\u0131 Resmi Gazete\u2019nin bug\u00fcnk\u00fc say\u0131s\u0131nda yay\u0131mland\u0131.<\/p>\n<p>Kurul karar\u0131na g\u00f6re, s\u00f6z konusu kanunun uygulama esaslar\u0131n\u0131 i\u00e7eren 6. maddesi kapsam\u0131nda, 01.11.2010 ile 21.08.2011 tarihleri aras\u0131nda i\u015fletmeye giren ve \u201c2011 Y\u0131l\u0131 Nihai YEK Listesi\u2019nde yer almayan tesisler, YEKDEM\u2019den son yararlanma y\u0131l\u0131n\u0131 takip eden ilk takvim y\u0131l\u0131nda yararlanabilecek.<\/p>\n<p>Ayr\u0131ca, 2011 YEKDEM uygulamas\u0131na ili\u015fkin, ayn\u0131 tarihler aras\u0131nda\u00a0i\u015fletmeye\u00a0giren ve \u201c2011 Y\u0131l\u0131 Nihai YEK Listesi\u2019nde yer alan tesislerin YEKDEM\u2019den son yararlanma y\u0131l\u0131n\u0131 takip eden ilk takvim y\u0131l\u0131n\u0131n 11 ay\u0131nda YEKDEM\u2019den yararlanabilece\u011fine karar verildi.<\/p>\n<p>http:\/\/www.resmigazete.gov.tr\/eskiler\/2019\/04\/20190410-19.pdf<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.5346 say\u0131l\u0131 Yenilenebilir Enerji Kaynaklar\u0131n\u0131n Elektrik Enerjisi \u00dcretimi Ama\u00e7l\u0131 Kullan\u0131m\u0131na \u0130li\u015fkin Kanun, Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) kararlar\u0131 Resmi Gazete\u2019nin bug\u00fcnk\u00fc say\u0131s\u0131nda yay\u0131mland\u0131. [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":90924,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,52,49,50],"tags":[67,23532,6782,8275,105,5844],"views":1133,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/90923"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=90923"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/90923\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/90924"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=90923"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=90923"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=90923"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}