{"id":9092,"date":"2013-04-01T16:48:02","date_gmt":"2013-04-01T13:48:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=9092"},"modified":"2013-04-01T16:48:02","modified_gmt":"2013-04-01T13:48:02","slug":"akfen-kavakcali-hes-uretime-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akfen-kavakcali-hes-uretime-basladi\/","title":{"rendered":"(Turkish) Akfen: Kavak\u00e7al\u0131 HES \u00dcretime Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/9092\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Akfen Holding, Akfenhes Yat\u0131r\u0131mlar\u0131 ba\u011fl\u0131 ortakl\u0131\u011f\u0131 PAK Enerji\u2019nin Mu\u011fla ili, Fethiye il\u00e7esinde bulunan Kavak\u00e7al\u0131 HES projesinin ticari enerji \u00fcretimine ge\u00e7ti\u011fini bildirdi.<\/strong><\/p>\n<p>\u015eirketten Kap\u2019a yap\u0131lan a\u00e7\u0131klamada yer alan detaylar \u015f\u00f6yle:<\/p>\n<p><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/akfen-kavak\u00e7al\u0131-hes-505x307.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-9093\" title=\"akfen-kavakcal\u0131-hes-505x307\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/akfen-kavak\u00e7al\u0131-hes-505x307-300x190.jpg\" alt=\"\" width=\"300\" height=\"190\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/akfen-kavak\u00e7al\u0131-hes-505x307-300x190.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/akfen-kavak\u00e7al\u0131-hes-505x307-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/akfen-kavak\u00e7al\u0131-hes-505x307.jpg 434w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\u015eirketimizin ba\u011fl\u0131 ortakl\u0131klar\u0131ndan Akfenhes Yat\u0131r\u0131mlar\u0131 ve Enerji \u00dcretim A.\u015e.\u2019nin ba\u011fl\u0131 ortakl\u0131\u011f\u0131 PAK Enerji \u00dcretimi San. Tic. A.\u015e.\u2019nin, Mu\u011fla ili, Fethiye il\u00e7esinde bulunan, Enerji Piyasas\u0131 D\u00fczenleme Kurulu (EPDK) taraf\u0131ndan verilen E\u00dc\/1980-1\/1404 lisans numaral\u0131, 8,9 MW kurulu g\u00fc\u00e7 kapasitesine sahip KAVAK\u00c7ALI HES Projesi\u2019nin T.C. Enerji Bakanl\u0131\u011f\u0131 taraf\u0131ndan 29.03.2013 tarihinde ge\u00e7ici kabul\u00fc yap\u0131lm\u0131\u015f ve santral mevzuata uygun olarak 24:00 itibar\u0131yla ticari enerji \u00fcretimine ba\u015flam\u0131\u015f olup y\u0131ll\u0131k 48,2 GWs elektrik \u00fcretmesi beklenmektedir.<\/p>\n<p>\u015eirketimiz Akfen Holding A.\u015e., yat\u0131r\u0131m program\u0131na uygun \u015fekilde HES santrallerini ticari enerji \u00fcretimi i\u00e7in devreye almaya devam etmekte olup, 29 Mart 2013 tarihi itibar\u0131yla, ba\u011fl\u0131 ortakl\u0131klar\u0131 vas\u0131tas\u0131yla faaliyet g\u00f6sterdi\u011fi hidroelektrik santrallerinde toplam 159,1 MW kurulu g\u00fc\u00e7 kapasitesine ve y\u0131ll\u0131k toplam 664,3 GWs \u00fcretim kapasitesine ula\u015fm\u0131\u015ft\u0131r.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/04\/01\/akfen-kavakcali-hes-uretime-basladi\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Akfen Holding, Akfenhes Yat\u0131r\u0131mlar\u0131 ba\u011fl\u0131 ortakl\u0131\u011f\u0131 PAK Enerji\u2019nin Mu\u011fla ili, Fethiye il\u00e7esinde bulunan Kavak\u00e7al\u0131 HES projesinin ticari enerji \u00fcretimine ge\u00e7ti\u011fini bildirdi. \u015eirketten Kap\u2019a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9093,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[4082,67,18,35370,1090,4084,4085,4083],"views":1324,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9092"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=9092"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9092\/revisions"}],"predecessor-version":[{"id":9095,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9092\/revisions\/9095"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9093"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=9092"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=9092"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=9092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}