{"id":90771,"date":"2019-04-10T14:54:19","date_gmt":"2019-04-10T11:54:19","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=90771"},"modified":"2019-04-10T14:55:51","modified_gmt":"2019-04-10T11:55:51","slug":"leningrad-ngs-5-numarali-guc-unitesi-5-milyar-kwh-uretime-ulasti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/leningrad-ngs-5-numarali-guc-unitesi-5-milyar-kwh-uretime-ulasti\/","title":{"rendered":"(Turkish) Leningrad NGS: &#8220;5 Numaral\u0131 G\u00fc\u00e7 \u00dcnitesi 5 Milyar kWh \u00dcretime Ula\u015ft\u0131&#8221;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/90771\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>T\u00fcrkiye\u2019nin ilk n\u00fckleer g\u00fc\u00e7 santrali Akkuyu NGS\u2019yi in\u015fa eden Rusya Devlet Atom Enerjisi Kurumu ROSATOM\u2019un Elektrik Enerjisi B\u00f6l\u00fcm\u00fcn\u00fcn bir par\u00e7as\u0131 olan Concern Rosenergoatom\u2019un i\u015fletti\u011fi Leningrad NGS\u2019nin VVER-1200 donan\u0131ml\u0131 5 numaral\u0131 yeni s\u00fcper g\u00fc\u00e7 \u00fcnitesi 5 milyar kilovat saatlik elektrik \u00fcretimine ula\u015ft\u0131. 3 Nisan itibariyle, \u00fcretim 5 milyar 7 milyon kWh&#8217;\u0131n \u00fczerine \u00e7\u0131kt\u0131.<\/h1>\n<p>Leningrad NGS (LNGS) Direkt\u00f6r\u00fc Vladimir Pereguda, ba\u015far\u0131lar\u0131n\u0131 \u015fu s\u00f6zlerle a\u00e7\u0131klad\u0131:<\/p>\n<p>\u201cBug\u00fcn Leningrad N\u00fckleer Santrali\u2019nin tarihinde \u00f6nemli bir g\u00fcn. \u0130lk olarak 5 milyar kilovat saatlik <img loading=\"lazy\" class=\"alignleft size-medium wp-image-90773\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/leningrad-ngs-5-numarali-guc-unitesi-5-milyar-kwh-uretime-ulasti-300x300.jpg\" alt=\"\" width=\"300\" height=\"300\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/leningrad-ngs-5-numarali-guc-unitesi-5-milyar-kwh-uretime-ulasti-300x300.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/leningrad-ngs-5-numarali-guc-unitesi-5-milyar-kwh-uretime-ulasti-150x150.jpg 150w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/leningrad-ngs-5-numarali-guc-unitesi-5-milyar-kwh-uretime-ulasti-768x768.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/leningrad-ngs-5-numarali-guc-unitesi-5-milyar-kwh-uretime-ulasti-400x400.jpg 400w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/leningrad-ngs-5-numarali-guc-unitesi-5-milyar-kwh-uretime-ulasti-50x50.jpg 50w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/leningrad-ngs-5-numarali-guc-unitesi-5-milyar-kwh-uretime-ulasti-100x100.jpg 100w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/leningrad-ngs-5-numarali-guc-unitesi-5-milyar-kwh-uretime-ulasti.jpg 900w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>elektrik \u00fcrettik. Bu ba\u015far\u0131n\u0131n bile\u015fenlerine bakt\u0131\u011f\u0131m\u0131zda; m\u00fckemmel bir proje, yenilik\u00e7i teknolojiler, binlerce insan\u0131n eme\u011fi, tabi ki geli\u015ftiriciler, in\u015faat\u00e7\u0131lar, montajc\u0131lar elbette LNGS personeli bulunuyor. Yeni g\u00fc\u00e7 \u00fcnitesinin emniyetli, g\u00fcvenilir ve \u00e7evre dostu \u00e7al\u0131\u015fmas\u0131n\u0131n s\u0131k\u0131 bir \u015fekilde g\u00f6zetilmesiyle de \u00f6nemli bir \u00fcretim rakam\u0131 elde edildi.\u201d<\/p>\n<p>Yeni g\u00fc\u00e7 \u00fcnitesinin \u00fcretti\u011fi elektrik Kuzey-Bat\u0131 b\u00f6lgesinin kalk\u0131nmas\u0131 i\u00e7in \u00f6nemli bir ad\u0131m olarak g\u00f6r\u00fcl\u00fcyor ve \u015fu anda b\u00f6lgede bir dizi b\u00fcy\u00fck yat\u0131r\u0131m projesi y\u00fcr\u00fct\u00fcl\u00fcyor. B\u00f6lge Ba\u015fkan\u0131 Alexander Drozdenko, d\u00fc\u015f\u00fcncelerini ve Leningrad NGS\u2019nin Leningrad B\u00f6lgesi i\u00e7in \u00f6nemini \u015fu s\u00f6zlerle dile getirdi:<\/p>\n<p>\u201cYeni LNGS-2, birimlerinin devreye girmesi ile y\u00fcksek teknoloji end\u00fcstrileri ve dijital ekonomi projeleri de dahil olmak \u00fczere, yo\u011fun enerji end\u00fcstrilerin geli\u015ftirilmesinde b\u00f6lgenin potansiyelini \u00f6nemli \u00f6l\u00e7\u00fcde artt\u0131rmaktad\u0131r.\u2019\u2019<\/p>\n<p>\u00dcnitenin tam kapasite ticari faaliyete ge\u00e7mesiyle birlikte, Leningrad B\u00f6lgesi&#8217;nin konsolide b\u00fct\u00e7esine ek vergi \u015feklinde ger\u00e7ekle\u015fecek ekonomik etkinin y\u0131ll\u0131k 3 milyar rubleden fazla olaca\u011f\u0131 tahmin ediliyor.<\/p>\n<p>Santralin yer ald\u0131\u011f\u0131 Sosnovy Bor kasabas\u0131n\u0131n sakinleri i\u00e7in, LNGS sadece bir i\u015f de\u011fil, ayn\u0131 zamanda en d\u00fc\u015f\u00fck \u0131s\u0131 maliyeti anlam\u0131na geliyor; gigcalorium ba\u015f\u0131na sadece 388 ruble gibi bir fiyat bi\u00e7iliyor.<\/p>\n<p>VVER-1200 LNGS\u2019nin 1 No\u2019lu yenilik\u00e7i g\u00fc\u00e7 \u00fcnitesinin jenerat\u00f6r\u00fc 9 Mart 2018\u2019de \u015febeke ile senkronize edildi, t\u00fcm testler ve g\u00fc\u00e7 geli\u015fimi ger\u00e7ekle\u015ftirildi, y\u00fczde 30-100 aras\u0131nda farkl\u0131 seviyelerde \u00e7al\u0131\u015ft\u0131r\u0131ld\u0131 . Ekim 2018&#8217;de, VVER-1200 LNGS&#8217;nin 1 No&#8217;lu g\u00fc\u00e7 \u00fcnitesi ticari i\u015fletmeye a\u00e7\u0131ld\u0131 ve yeni y\u0131l\u0131n ba\u015f\u0131ndan itibaren kapasite sat\u0131\u015f\u0131 i\u00e7in pazara girdi. Bunun zaman\u0131nda devreye al\u0131nmas\u0131 LNGS&#8217;nin 2018 plan\u0131n\u0131 y\u00fczde 5,05 a\u015fmas\u0131n\u0131 sa\u011flad\u0131 ve Rosenergoatom Concern JSC&#8217;nin yeni rekoruna \u00f6nemli katk\u0131larda bulundu.<\/p>\n<p>2019\u2019da, Leningrad NGS\u2019nin Federal Antimonopoly Servisi\u2019nin (FAS) elektrik \u00fcretme plan\u0131, 2018 seviyesinden y\u00fczde 2 daha y\u00fcksek olan 28 milyar 30 milyon kWh olarak belirlendi. Ayn\u0131 zamanda, \u00fcretimin en b\u00fcy\u00fck b\u00f6l\u00fcm\u00fcn\u00fcn neredeyse y\u00fczde 30&#8217;u yeni g\u00fc\u00e7 \u00fcnitesinden bekleniyor.<\/p>\n<p>LNGS 3\u2019\u00fcnc\u00fc jenerasyon \u00fcnitesinin kullan\u0131ld\u0131\u011f\u0131 bu proje, geleneksel g\u00fc\u00e7 \u00fcnitelerine (VVER-1000) k\u0131yasla ekonomik performans\u0131n\u0131 ve g\u00fcvenli\u011fini \u00f6nemli \u00f6l\u00e7\u00fcde art\u0131ran bir tak\u0131m avantajlara sahip. Reakt\u00f6r\u00fcn \u00e7al\u0131\u015fma g\u00fcc\u00fc y\u00fczde 20 art\u0131r\u0131larak 1000&#8217;den 1200 MW&#8217;a \u00e7\u0131kar\u0131ld\u0131. Ana ekipmanlar\u0131n kullan\u0131m \u00f6mr\u00fc 30 y\u0131ldan 60 y\u0131la yani tam olarak 2 kat\u0131na \u00e7\u0131kar\u0131ld\u0131. Ayn\u0131 zamanda \u00fcnite, n\u00fckleer g\u00fcvenlik alan\u0131ndaki en y\u00fcksek uluslararas\u0131 standartlara da uyum g\u00f6steriyor.<\/p>\n<p>LNGS-2 Projesi, Belarus NGS, Paks-2 NGS, Al-Dabaa NGS, Hanhikivi-1 NGS gibi uluslararas\u0131 ROSATOM projeleri i\u00e7in bir referans olarak g\u00f6steriliyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin ilk n\u00fckleer g\u00fc\u00e7 santrali Akkuyu NGS\u2019yi in\u015fa eden Rusya Devlet Atom Enerjisi Kurumu ROSATOM\u2019un Elektrik Enerjisi B\u00f6l\u00fcm\u00fcn\u00fcn bir par\u00e7as\u0131 olan Concern [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":90773,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[3019,42302,49172,34979,19638,34980,26353,42030,67,1009,49170,49174,23134,25480,34931,43093,34930,2587,42759,49171,49173],"views":830,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/90771"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=90771"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/90771\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/90773"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=90771"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=90771"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=90771"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}