{"id":90625,"date":"2019-04-07T22:22:27","date_gmt":"2019-04-07T19:22:27","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=90625"},"modified":"2019-04-07T22:25:59","modified_gmt":"2019-04-07T19:25:59","slug":"ozbekistan-2030-yilina-kadar-25-gunes-santrali-ges-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ozbekistan-2030-yilina-kadar-25-gunes-santrali-ges-kuracak\/","title":{"rendered":"(Turkish) \u00d6zbekistan 2030 Y\u0131l\u0131na Kadar 25 G\u00fcne\u015f Santrali ( GES ) Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/90625\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>\u00d6zbekistan Enerji Bakan Yard\u0131mc\u0131s\u0131 \u015eerzad Hocayev taraf\u0131ndan \u00d6zbek televizyona yap\u0131lan a\u00e7\u0131klamada, 10 y\u0131l i\u00e7inde \u00fclkede 25 g\u00fcne\u015f santrali (ges) kurulaca\u011f\u0131 belirtilirken \u00fclkenin 100 mw g\u00fcc\u00fcnde ilk g\u00fcne\u015f enerjisi santralinin Nevai vilayetinde in\u015fa edilece\u011fi <img loading=\"lazy\" class=\"alignright size-medium wp-image-90627\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/ozbekistan-2030-yilina-kadar-25-gunes-santrali-ges-kuracak-300x188.jpg\" alt=\"\" width=\"300\" height=\"188\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/ozbekistan-2030-yilina-kadar-25-gunes-santrali-ges-kuracak-300x188.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/ozbekistan-2030-yilina-kadar-25-gunes-santrali-ges-kuracak-768x480.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/ozbekistan-2030-yilina-kadar-25-gunes-santrali-ges-kuracak-500x313.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/ozbekistan-2030-yilina-kadar-25-gunes-santrali-ges-kuracak-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/ozbekistan-2030-yilina-kadar-25-gunes-santrali-ges-kuracak.jpg 875w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>de a\u00e7\u0131kland\u0131. Bu y\u0131l in\u015faat \u00e7al\u0131\u015fmalar\u0131na ba\u015flanacak bu santralin iki y\u0131l i\u00e7inde tamamlanmas\u0131n\u0131n planland\u0131\u011f\u0131 da ifade edilmi\u015ftir.<\/h1>\n<p>Santral in\u015faat\u0131na y\u00f6nelik ihale i\u00e7in 23 yat\u0131r\u0131mc\u0131dan ba\u015fvuru al\u0131nd\u0131\u011f\u0131n\u0131 belirten Hocayev, &#8220;Elektrik enerjisi sekt\u00f6r\u00fcne yat\u0131r\u0131m \u00e7ekmeden, rekabet etmek ve yeni teknolojiler sunmak \u00e7ok zor olacakt\u0131r. Bundan dolay\u0131 do\u011frudan yat\u0131r\u0131m yapma yoluyla yenilenebilir enerji kaynaklar\u0131na dayal\u0131 elektrik \u00fcretilmesine karar verilmi\u015ftir.&#8221; ifadelerini kulland\u0131.<\/p>\n<p>Y\u0131lda ortalama 52 milyar kilovatsaat elektrik \u00fcretiminin yap\u0131ld\u0131\u011f\u0131 \u00fclkede, 50\u2019ye yak\u0131n termik ve hidroelektrik enerji santrali bulunuyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u00d6zbekistan Enerji Bakan Yard\u0131mc\u0131s\u0131 \u015eerzad Hocayev taraf\u0131ndan \u00d6zbek televizyona yap\u0131lan a\u00e7\u0131klamada, 10 y\u0131l i\u00e7inde \u00fclkede 25 g\u00fcne\u015f santrali (ges) kurulaca\u011f\u0131 belirtilirken \u00fclkenin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":90627,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[34979,34980,26353,42030,67,1009,35038,21886,23416,35039,23133,34925,26059,23131,10997,49014,34977,26829,508],"views":917,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/90625"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=90625"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/90625\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/90627"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=90625"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=90625"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=90625"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}