{"id":90530,"date":"2019-04-05T23:00:42","date_gmt":"2019-04-05T20:00:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=90530"},"modified":"2019-04-05T23:05:53","modified_gmt":"2019-04-05T20:05:53","slug":"akkuyu-nukleer-guc-santrali-tum-hiziyla-suruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-nukleer-guc-santrali-tum-hiziyla-suruyor\/","title":{"rendered":"(Turkish) Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali T\u00fcm H\u0131z\u0131yla S\u00fcr\u00fcyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/90530\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>3 Nisan 2019, Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali projesinde 1\u2019inci \u00dcnitenin temel atma t\u00f6renin birinci y\u0131l d\u00f6n\u00fcm\u00fcyd\u00fc. Projenin in\u015faat a\u015famas\u0131n\u0131n birinci y\u0131l\u0131nda elde edilen ba\u015far\u0131lar, Rusya ile T\u00fcrkiye aras\u0131nda \u00fclkedeki ilk n\u00fckleer g\u00fc\u00e7 santralinin in\u015fas\u0131 i\u00e7in ger\u00e7ekle\u015ftirilen verimli i\u015fbirli\u011finin g\u00f6stergesi olarak dikkat \u00e7ekiyor.<\/h1>\n<p>Birinci \u00dcnite reakt\u00f6r binas\u0131n\u0131n temel plakas\u0131n\u0131n d\u00f6\u015fenmesine ili\u015fkin \u00e7al\u0131\u015fmalar, Uluslararas\u0131 Atom Enerjisi Ajans\u0131&#8217;n\u0131n g\u00fcvenlik standartlar\u0131 ve T\u00fcrkiye&#8217;nin ulusal standartlar\u0131 ile tam uyumlu olacak \u015fekilde ge\u00e7ti\u011fimiz Mart ay\u0131nda tamamland\u0131. 2018 y\u0131l\u0131n\u0131n sonbahar\u0131n\u0131n sonlar\u0131na do\u011fru 2\u2019inci \u00dcnite i\u00e7in s\u0131n\u0131rl\u0131 \u00e7al\u0131\u015fma izni al\u0131nd\u0131 ve \u00e7al\u0131\u015fmalar ba\u015flad\u0131. Bir sonraki a\u015famada, Proje \u015eirketi Akkuyu N\u00fckleer A.\u015e., 2\u2019inci \u00dcnite i\u00e7in in\u015faat izni almay\u0131 ve 2\u2019inci \u00dcnite temel plakas\u0131n\u0131n d\u00f6\u015fenmesi i\u00e7in beton atma \u00e7al\u0131\u015fmalar\u0131na <img loading=\"lazy\" class=\"alignright size-medium wp-image-90532\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/akkuyu-nukleer-guc-santrali-tum-hiziyla-suruyor2-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/akkuyu-nukleer-guc-santrali-tum-hiziyla-suruyor2-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/akkuyu-nukleer-guc-santrali-tum-hiziyla-suruyor2-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/akkuyu-nukleer-guc-santrali-tum-hiziyla-suruyor2-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/akkuyu-nukleer-guc-santrali-tum-hiziyla-suruyor2-450x300.jpg 450w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/akkuyu-nukleer-guc-santrali-tum-hiziyla-suruyor2.jpg 732w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>ba\u015flamay\u0131 planl\u0131yor.<\/p>\n<p>Bunun yan\u0131 s\u0131ra, Do\u011fu Kargo Terminali\u2019nde in\u015faat \u00e7al\u0131\u015fmalar\u0131 tamamland\u0131 ve Ula\u015ft\u0131rma ve Altyap\u0131 Bakanl\u0131\u011f\u0131&#8217;ndan \u00e7al\u0131\u015fma izni bekleniyor. \u00d6te yandan Akkuyu N\u00fckleer A.\u015e., 3\u2019\u00fcnc\u00fc \u00dcnite ile ilgili in\u015faat izninin ve di\u011fer izinlerin al\u0131nmas\u0131 i\u00e7in gerekli belgeleri haz\u0131rlad\u0131 ve TAEK\u2019e sundu.<\/p>\n<p>Akkuyu N\u00fckleer A.\u015e Genel M\u00fcd\u00fcr\u00fc Anastasia Zoteeva, \u201cBir y\u0131lda elde etti\u011fimiz sonu\u00e7lar bizim i\u00e7in \u00e7ok de\u011ferli ve \u00f6n\u00fcm\u00fczde yap\u0131lmas\u0131 gereken daha \u00e7ok i\u015f var\u201d dedi. Zoteeva, s\u00f6zlerine \u015f\u00f6yle devam etti: \u201c2019 y\u0131l\u0131nda yapmam\u0131z gereken, y\u00fczde 70\u2019i an itibar\u0131yla haz\u0131r olan Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali sahas\u0131n\u0131n haz\u0131rlanmas\u0131n\u0131 tamamlamak. Kalan y\u00fczde 30\u2019u y\u0131lsonu itibar\u0131yla tamamlamay\u0131 planl\u0131yoruz. 2019 i\u00e7in planlanan \u00e7al\u0131\u015fmalar aras\u0131nda, verilen izinler ve onaylar kapsam\u0131nda 1\u2019inci ve 2\u2019inci \u00dcnitelerin teknik ve n\u00fckleer altyap\u0131lar\u0131 i\u00e7in gerekli temelin haz\u0131rlanmas\u0131 da var. \u0130\u015flerimizin gittik\u00e7e daha b\u00fcy\u00fck bir k\u0131sm\u0131n\u0131 sahada bizimle \u00e7al\u0131\u015fan T\u00fcrk ortaklar\u0131m\u0131z vas\u0131tas\u0131yla ger\u00e7ekle\u015ftiriyoruz. Aktif \u00e7al\u0131\u015fmalar\u0131n ba\u015flamas\u0131n\u0131n birinci y\u0131l\u0131nda, birlikte verimli bir \u015fekilde \u00e7al\u0131\u015fabilece\u011fimizi g\u00f6sterdik. Rosatom olarak ayn\u0131 dili konu\u015fabilmenin \u00e7ok de\u011ferli oldu\u011funa ve Akkuyu Projesi&#8217;ndeki dinamiklerin de bunun g\u00f6stergesi oldu\u011funa inan\u0131yoruz.\u201d<\/p>\n<p>\u0130n\u015faat sahas\u0131ndaki ilerlemeye ilave olarak, Akkuyu projesi bu y\u0131l bir ba\u015fka ba\u015far\u0131s\u0131n\u0131n; 35 T\u00fcrk gen\u00e7 n\u00fckleer enerji uzman\u0131n\u0131n Akkuyu N\u00fckleer A.\u015e.\u2019de \u00e7al\u0131\u015fmaya ba\u015flamas\u0131n\u0131n gururunu ya\u015f\u0131yor. Bu \u00f6\u011frenciler, 2018 ilkbahar\u0131nda, 1\u2019inci \u00dcnitenin temelinin at\u0131lmas\u0131 ile ayn\u0131 zamanda, Rus n\u00fckleer sekt\u00f6r\u00fcn\u00fcn merkezi \u00fcniversitesi olan Ulusal N\u00fckleer Ara\u015ft\u0131rma \u00dcniversitesi MEPhI&#8217;den mezun oldu ve Akkuyu projesine dahil oldu. 2019 y\u0131l\u0131n\u0131n \u015eubat ay\u0131nda \u015firket, 53 yeni MEPhI mezununa bu y\u0131l\u0131n May\u0131s ay\u0131nda projeye dahil olmak \u00fczere i\u015f teklifinde bulundu.<\/p>\n<p>Halihaz\u0131rda, Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali in\u015faat sahas\u0131nda y\u00fczde 90\u2019\u0131 T\u00fcrk vatanda\u015flar\u0131 olmak \u00fczere 783 ki\u015fi \u00e7al\u0131\u015f\u0131yor. 2019&#8217;un sonunda bu say\u0131n\u0131n 1500&#8217;e \u00e7\u0131kar\u0131lmas\u0131 hedefleniyor. \u0130n\u015faat faaliyetinin en yo\u011fun olmas\u0131n\u0131n beklendi\u011fi 2023 ve 2024 y\u0131llar\u0131nda proje yakla\u015f\u0131k 9 bin ki\u015fiye istihdam olana\u011f\u0131 sa\u011flayacak.\u0130n\u015faat\u0131 tamamlan\u0131p santral devreye al\u0131nd\u0131\u011f\u0131nda Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nde yakla\u015f\u0131k 3500 ki\u015fi istihdam edilecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 3 Nisan 2019, Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali projesinde 1\u2019inci \u00dcnitenin temel atma t\u00f6renin birinci y\u0131l d\u00f6n\u00fcm\u00fcyd\u00fc. Projenin in\u015faat a\u015famas\u0131n\u0131n birinci y\u0131l\u0131nda elde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":90533,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[3019,20867,1303,38367,42416,34979,19638,34980,26353,67,1009,3785,23134,25480,34931,34930,13100],"views":693,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/90530"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=90530"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/90530\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/90533"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=90530"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=90530"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=90530"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}