{"id":90371,"date":"2019-04-03T10:08:09","date_gmt":"2019-04-03T07:08:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=90371"},"modified":"2019-04-03T10:09:20","modified_gmt":"2019-04-03T07:09:20","slug":"baskent-edasin-2018-yili-net-donem-kari-825-milyon-tl","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/baskent-edasin-2018-yili-net-donem-kari-825-milyon-tl\/","title":{"rendered":"(Turkish) Ba\u015fkent EDA\u015e\u2019\u0131n 2018 Y\u0131l\u0131 Net D\u00f6nem Kar\u0131 825 Milyon TL"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/90371\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Enerjisa grup \u015firketlerinden Ba\u015fkent Elektrik Da\u011f\u0131t\u0131m A.\u015e ola\u011fan genel kurul toplant\u0131s\u0131 \u0130stanbul\u2019da yap\u0131ld\u0131. \u015eirket taraf\u0131ndan KAP\u2019a yap\u0131lan a\u00e7\u0131klamada, <img loading=\"lazy\" class=\"alignleft size-medium wp-image-90373\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/baskent-edasin-2018-yili-net-donem-kari-825-milyon-tl-300x165.jpg\" alt=\"\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/baskent-edasin-2018-yili-net-donem-kari-825-milyon-tl-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/baskent-edasin-2018-yili-net-donem-kari-825-milyon-tl-500x275.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/baskent-edasin-2018-yili-net-donem-kari-825-milyon-tl-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/baskent-edasin-2018-yili-net-donem-kari-825-milyon-tl.jpg 664w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Ba\u015fkent EDA\u015e\u2019\u0131n 2018 y\u0131l\u0131na ait finansal tablolar\u0131n\u0131n oy birli\u011fi ile kabul edildi\u011fi bildirildi.<\/h1>\n<p>A\u00e7\u0131klamada, 2018 hesap d\u00f6nemine ait finansal tablolar\u0131na g\u00f6re 825,389,000 TL net d\u00f6nem kar\u0131 elde edildi\u011fi belirtildi. Y\u00f6netim Kurulu Ba\u015fkan\u0131 Murat P\u0131nar ba\u015fkanl\u0131\u011f\u0131ndaki genel kurula <span style=\"text-decoration: underline;\">ili\u015fkin a\u00e7\u0131klamada;<\/span><\/p>\n<p>&#8220;2018 y\u0131l\u0131 d\u00f6nem k\u00e2r\u0131ndan yasal y\u00fck\u00fcml\u00fcl\u00fckler ve ge\u00e7mi\u015f d\u00f6nem zararlar\u0131 d\u00fc\u015f\u00fcld\u00fckten sonra, ortaklara 108,113,416.44 TL temett\u00fc da\u011f\u0131t\u0131lmas\u0131na, zarar mahsubu ve temett\u00fc sonras\u0131nda kalan bakiyenin ola\u011fan\u00fcst\u00fc yedeklere kaydedilmesine, bu temett\u00fc tutar\u0131ndan \u00f6denen net 104,538,950.30 TL avans kar pay\u0131n\u0131n mahsup edilmesi sonucu bakiye 3,574,466.14 TL temett\u00fcn\u00fcn 31.12.2019 tarihine kadar ortaklara \u00f6denmesine oybirli\u011fi ile karar verilmi\u015ftir.&#8221; ifadeleri kullan\u0131ld\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerjisa grup \u015firketlerinden Ba\u015fkent Elektrik Da\u011f\u0131t\u0131m A.\u015e ola\u011fan genel kurul toplant\u0131s\u0131 \u0130stanbul\u2019da yap\u0131ld\u0131. \u015eirket taraf\u0131ndan KAP\u2019a yap\u0131lan a\u00e7\u0131klamada, Ba\u015fkent EDA\u015e\u2019\u0131n 2018 y\u0131l\u0131na [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":90373,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[19261,24666,34979,19638,34980,26353,67,1009,5436,33828],"views":669,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/90371"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=90371"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/90371\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/90373"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=90371"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=90371"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=90371"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}