{"id":90353,"date":"2019-04-03T00:40:25","date_gmt":"2019-04-02T21:40:25","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=90353"},"modified":"2019-04-03T00:45:00","modified_gmt":"2019-04-02T21:45:00","slug":"2018de-finanse-edilen-en-buyuk-gunes-projesi-fastan","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/2018de-finanse-edilen-en-buyuk-gunes-projesi-fastan\/","title":{"rendered":"(Turkish) 2018&#8217;de Finanse Edilen En B\u00fcy\u00fck G\u00fcne\u015f Projesi Fas\u2019tan!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/90353\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Ak\u0131ll\u0131 teknolojiler ve yenilenebilir enerjiye y\u00f6nelik yat\u0131r\u0131mlar, 2018 y\u0131l\u0131nda bir \u00f6nceki d\u00f6neme g\u00f6re y\u00fczde 8 d\u00fc\u015f\u00fc\u015f g\u00f6stererek 332,1 milyar dolar tutar\u0131nda ger\u00e7ekle\u015fti. Azalan yat\u0131r\u0131m miktar\u0131na ra\u011fmen, g<strong>\u00fcne\u015f maliyetlerini d\u00fc\u015f\u00fcrmek, a\u00e7\u0131k deniz r\u00fczgar\u0131 ve elektrikli ara\u00e7 pazarlar\u0131n\u0131 b\u00fcy\u00fctmek i\u00e7in k\u00fcresel ilgi s\u00fcr\u00fcyor. Ge\u00e7ti\u011fimiz y\u0131l g\u00fcne\u015f ve r\u00fczgar enerjisi alan\u0131nda yap\u0131lan en b\u00fcy\u00fck projelerin ba\u015f\u0131nda PV ve offshore tesisleri geliyor.<\/strong><\/h1>\n<p>Bloomberg NEF\u2019in raporuna g\u00f6re, 2018 y\u0131l\u0131nda finanse edilen en b\u00fcy\u00fck g\u00fcne\u015f enerjisi projesi yakla\u015f\u0131k 2.4 milyar dolara mal olan Fas\u2019taki 800 MW\u2019lik termal g\u00fcne\u015f enerjisi portf\u00f6y\u00fc NOOR Midelt PV oldu.<\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-90355\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/2018de-finanse-edilen-en-buyuk-gunes-projesi-fastan-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/2018de-finanse-edilen-en-buyuk-gunes-projesi-fastan-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/2018de-finanse-edilen-en-buyuk-gunes-projesi-fastan-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/2018de-finanse-edilen-en-buyuk-gunes-projesi-fastan-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/2018de-finanse-edilen-en-buyuk-gunes-projesi-fastan-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/2018de-finanse-edilen-en-buyuk-gunes-projesi-fastan.jpg 868w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Noor Midelt projesi, 2020 y\u0131l\u0131na kadar toplam 2.000 MW kapasiteye sahip olmay\u0131 hedefleyen \u201cThe Noor Solar Plan\u201d adl\u0131 giri\u015fimin bir par\u00e7as\u0131. Noor Midelt\u2019in ilk a\u015famas\u0131 iki adet 400 MW\u2019l\u0131k hibrit yo\u011funla\u015ft\u0131r\u0131lm\u0131\u015f g\u00fcne\u015f enerjisi santrali (CSP) ve\u00a0fotovoltaik santralden olu\u015fuyor. Her bir proje i\u00e7in CSP taraf\u0131ndan en az 5 saatlik 150-190 MW kapasiteli depolama sa\u011flan\u0131yor.<\/p>\n<p>\u0130kinci en b\u00fcy\u00fck proje, 500 milyon dolara mal olan\u00a0Hindistan\u2019daki 709 MW\u2019lik NLC Tangedco PV tesisi olurken Hindistan, fotovoltaik tesisler i\u00e7in megawatt ba\u015f\u0131na en d\u00fc\u015f\u00fck sermaye maliyetine sahip \u00fclkelerin ba\u015f\u0131nda gelmeye devam ediyor.<\/p>\n<h2>R\u00fczgarda en b\u00fcy\u00fck projeler offshore tesislerde<\/h2>\n<p>Ge\u00e7en y\u0131l yenilenebilir enerji yat\u0131r\u0131mlar\u0131n\u0131n \u00f6nemli bir par\u00e7as\u0131 olan a\u00e7\u0131k deniz (offshore) r\u00fczgar enerjisi yat\u0131r\u0131mlar\u0131nda finanse edilen projeler aras\u0131nda, Kuzey Denizi\u2019ndeki 3,3 milyar dolar de\u011ferinde 950 MW\u2019l\u0131k Moray Firth East ve 11.4 milyar dolar ile in\u015faat\u0131 ba\u015flayan \u00c7in\u2019deki 13 a\u00e7\u0131k deniz r\u00fczgar \u00e7iftli\u011fi yer al\u0131yor.<\/p>\n<p>Karadaki r\u00fczgar enerjisi projeleri, ge\u00e7en y\u0131l k\u00fcresel olarak %2 art\u0131\u015fla 100,8 milyar dolara ula\u015f\u0131rken en b\u00fcy\u00fck projeler aras\u0131nda 1,4 milyar dolar ile 706 MW\u2019lik Enel Green Power G\u00fcney Afrika portf\u00f6y\u00fc ve 600 MW\u2019lik 1 milyar dolara mal olan ABD\u2019deki Xcel Rush Creek g\u00f6steriliyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ak\u0131ll\u0131 teknolojiler ve yenilenebilir enerjiye y\u00f6nelik yat\u0131r\u0131mlar, 2018 y\u0131l\u0131nda bir \u00f6nceki d\u00f6neme g\u00f6re y\u00fczde 8 d\u00fc\u015f\u00fc\u015f g\u00f6stererek 332,1 milyar dolar tutar\u0131nda ger\u00e7ekle\u015fti. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":90355,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[41476,1396,34979,26353,42030,67,1009,15126,48805,35038,23416,7781,23133,34925,35037,23131,48804,48802,48803,35002,24949,35035,42867,34977,26829,1245,48806],"views":790,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/90353"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=90353"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/90353\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/90355"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=90353"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=90353"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=90353"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}