{"id":90307,"date":"2019-04-02T09:23:15","date_gmt":"2019-04-02T06:23:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=90307"},"modified":"2019-04-02T09:29:18","modified_gmt":"2019-04-02T06:29:18","slug":"sivasta-18-5-mw-gucunde-hidroelektrik-santrali-hes-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sivasta-18-5-mw-gucunde-hidroelektrik-santrali-hes-kurulacak\/","title":{"rendered":"(Turkish) Sivas\u2019ta 18.5 MW G\u00fcc\u00fcnde Hidroelektrik Santrali (HES) Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/90307\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>NASA Enerji taraf\u0131ndan Sivas \/ Su\u015fehri&#8217;in Gemin Deresinde \u201cGEM\u0130N 1-5 HES (19,25 <img loading=\"lazy\" class=\"alignleft size-medium wp-image-90309\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/sivasta-18-5-mw-gucunde-hidroelektrik-santrali-hes-kurulacak-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/sivasta-18-5-mw-gucunde-hidroelektrik-santrali-hes-kurulacak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/sivasta-18-5-mw-gucunde-hidroelektrik-santrali-hes-kurulacak-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/sivasta-18-5-mw-gucunde-hidroelektrik-santrali-hes-kurulacak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/sivasta-18-5-mw-gucunde-hidroelektrik-santrali-hes-kurulacak-450x300.jpg 450w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/04\/sivasta-18-5-mw-gucunde-hidroelektrik-santrali-hes-kurulacak.jpg 732w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>MWm \/ 18,50 MWe)\u201d projesini hayata ge\u00e7irilecek.<\/h1>\n<p>92,2 milyon lira yat\u0131r\u0131m bedeli olan 2,49 MW\u2019l\u0131k Gemin-1 Reg\u00fclat\u00f6r\u00fc ve HES, 5,83 MW\u2019l\u0131k Gemin-2&amp;3 Reg\u00fclat\u00f6r\u00fc ve HES ve 10,18 MW\u2019l\u0131k Gemin-4&amp;5 Reg\u00fclat\u00f6r\u00fc ve HES olmak \u00fczere 3 etaptan meydana gelmektedir.<\/p>\n<p>HES y\u0131ll\u0131k ortalama 68,22 GWh elektrik \u00fcretimi ger\u00e7ekle\u015ftirecek olup Gemin- 4&amp;5 HES\u2019e 3\/0 AWG ile ba\u011flanarak 2&#215;477 MCM olarak yakla\u015f\u0131k 15 km uzunlu\u011funda olacak Enerji iletim hatt\u0131na ba\u011flanacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. NASA Enerji taraf\u0131ndan Sivas \/ Su\u015fehri&#8217;in Gemin Deresinde \u201cGEM\u0130N 1-5 HES (19,25 MWm \/ 18,50 MWe)\u201d projesini hayata ge\u00e7irilecek. 92,2 milyon lira [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":90309,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[34979,19,67,1009,7215,48761,48762,48763,48764,26043,1090,48759,2437,48760,34977,48765],"views":1412,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/90307"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=90307"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/90307\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/90309"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=90307"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=90307"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=90307"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}