{"id":9016,"date":"2013-03-30T11:13:32","date_gmt":"2013-03-30T08:13:32","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=9016"},"modified":"2013-03-30T11:13:32","modified_gmt":"2013-03-30T08:13:32","slug":"hindistan-gunes-elektriginde-1-5-gwa-yaklasti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/hindistan-gunes-elektriginde-1-5-gwa-yaklasti\/","title":{"rendered":"(Turkish) Hindistan G\u00fcne\u015f Elektri\u011finde 1.5 GW\u2019a Yakla\u015ft\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/9016\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Hindistan elektrik \u015febekesine ba\u011fl\u0131 g\u00fcne\u015f elektri\u011fi kurulu g\u00fcc\u00fcn\u00fcn \u015eubat ay\u0131\u00a0 sonu itibari ile 1.446,66 MW seviyesine y\u00fckseldi\u011fi a\u00e7\u0131kland\u0131. Hindistan Yeni ve Yenilenebilir Enerji Bakanl\u0131\u011f\u0131 taraf\u0131ndan a\u00e7\u0131klanan verilere g\u00f6<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/gunes-enerjisi-hindistan-HI-456111.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-9017\" title=\"gunes-enerjisi-hindistan--HI-456111\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/gunes-enerjisi-hindistan-HI-456111-300x188.jpg\" alt=\"\" width=\"300\" height=\"188\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/gunes-enerjisi-hindistan-HI-456111-300x188.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/gunes-enerjisi-hindistan-HI-456111-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/gunes-enerjisi-hindistan-HI-456111.jpg 473w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>re \u00fclkede \u015eubat ay\u0131nda 210.18 MW\u2019l\u0131k g\u00fcne\u015f elektri\u011fi sistemi devreye al\u0131narak \u015febeke ba\u011flant\u0131s\u0131 sa\u011fland\u0131.<\/strong><\/p>\n<p>Hindistan\u2019\u0131n 1 Nisan 2012 ila 31 Mart 2013 tarihlerini kapsayan mali y\u0131l\u0131 i\u00e7in g\u00fcne\u015f elektri\u011finde hedefi 800 MW iken, \u015fu ana kadar 505.48 MW\u2019l\u0131k kurulu g\u00fcc\u00fcn \u015febeke ba\u011flant\u0131s\u0131 sa\u011flanabildi.<\/p>\n<p>Bununla birlikte ayn\u0131 d\u00f6nemde \u00fclkede kurulu g\u00fcc\u00fc 1 kW \u00fczeri olup, \u015febeke ba\u011flant\u0131s\u0131 olmayan 17.59 MW kurulu g\u00fcc\u00fcnde sistem devreye al\u0131n\u0131rken, bu gruptaki sistemlerin toplam kurulu g\u00fcc\u00fc ise \u00fclkenin 2013 hedefi olan 30 MW\u2019\u0131 \u00f6nemli \u00f6l\u00e7\u00fcde a\u015farak 108 MW seviyesine y\u00fckseldi.<\/p>\n<p>Frost&amp;Sullivan taraf\u0131ndan yak\u0131n zamanda \u00fclke hakk\u0131nda bir analizde 2012\u2019de 1.05 milyar dolarl\u0131k b\u00fcy\u00fckl\u00fc\u011fe ula\u015fan \u00fclkenin g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcn\u00fcn 2013\u2019de ise 2.05 milyar dolara ula\u015faca\u011f\u0131 \u00f6ng\u00f6r\u00fcs\u00fcnde bulunulmu\u015ftu.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/hindistan-gunes-elektriginde-1-5-gw\u2019a-yaklasti_2927.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Hindistan elektrik \u015febekesine ba\u011fl\u0131 g\u00fcne\u015f elektri\u011fi kurulu g\u00fcc\u00fcn\u00fcn \u015eubat ay\u0131\u00a0 sonu itibari ile 1.446,66 MW seviyesine y\u00fckseldi\u011fi a\u00e7\u0131kland\u0131. Hindistan Yeni ve Yenilenebilir Enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9017,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[19,67,227,1169,13,2206,4034,105],"views":741,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9016"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=9016"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9016\/revisions"}],"predecessor-version":[{"id":9018,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/9016\/revisions\/9018"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9017"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=9016"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=9016"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=9016"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}