{"id":90108,"date":"2019-03-28T23:00:06","date_gmt":"2019-03-28T20:00:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=90108"},"modified":"2019-03-28T23:02:02","modified_gmt":"2019-03-28T20:02:02","slug":"mekkeye-kurulacak-600-mw-gunes-enerjisi-projesi-icin-ihale-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/mekkeye-kurulacak-600-mw-gunes-enerjisi-projesi-icin-ihale-yapilacak\/","title":{"rendered":"(Turkish) Mekke\u2019ye Kurulacak 600 MW G\u00fcne\u015f Enerjisi Projesi \u0130\u00e7in \u0130hale Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/90108\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Suudi Arabistan taraf\u0131ndan Mekke&#8217;de 600 mw g\u00fcce sahip g\u00fcne\u015f enerjisi projesinin in\u015faat\u0131na y\u00f6nelik ihale ger\u00e7ekle\u015ftirilecek.<img loading=\"lazy\" class=\"alignright size-medium wp-image-90110\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/mekkeye-kurulacak-600-mw-gunes-enerjisi-projesi-icin-ihale-yapilacak-300x183.jpg\" alt=\"\" width=\"300\" height=\"183\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/mekkeye-kurulacak-600-mw-gunes-enerjisi-projesi-icin-ihale-yapilacak-300x183.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/mekkeye-kurulacak-600-mw-gunes-enerjisi-projesi-icin-ihale-yapilacak-768x468.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/mekkeye-kurulacak-600-mw-gunes-enerjisi-projesi-icin-ihale-yapilacak-500x305.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/mekkeye-kurulacak-600-mw-gunes-enerjisi-projesi-icin-ihale-yapilacak-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/mekkeye-kurulacak-600-mw-gunes-enerjisi-projesi-icin-ihale-yapilacak.jpg 800w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/h1>\n<p>Suudi Arabistan\u2019\u0131n art\u0131\u015f g\u00f6steren elektrik talebinin yenilenebilir enerji kaynaklar\u0131 ile uyumlu \u015fekilde kar\u015f\u0131lanmas\u0131 hedefiyle haz\u0131rl\u0131klar\u0131 tamamlanan Suudi Vizyon 2030\u2019a uygun olarak, g\u00fcne\u015f enerjisi projeleri yap\u0131lacakt\u0131r. Suudi Arabistan\u2019da 2.600 MW\u2019l\u0131k Faisaliah G\u00fcne\u015f Enerjisi Projesi\u2019de bunun bir par\u00e7as\u0131 olurken 600 megawatt\u2019l\u0131k g\u00fcne\u015f enerjisi santralinin Mekke\u2019de yap\u0131laca\u011f\u0131 ifade edildi.<\/p>\n<p>2.600 MW g\u00fcce sahip Faisaliah G\u00fcne\u015f Enerjisi Projesi, Suudi Enerji Bakanl\u0131\u011f\u0131 taraf\u0131ndan Mekke Kalk\u0131nma \u0130daresi ile birlikte geli\u015ftirilerek a\u015famal\u0131 olarak uygulamaya ge\u00e7ecek olup anla\u015fma kapsam\u0131nda 600 MW\u2019l\u0131k k\u0131sm\u0131 Yenilenebilir Enerji Projeleri Geli\u015ftirme Ofisi (Repdo) taraf\u0131ndan a\u00e7\u0131k ihale usul\u00fcyle 2.000 MW g\u00fcce sahip k\u0131sm\u0131 ise\u00a0Kamu Yat\u0131r\u0131m Fonu ve ortaklar\u0131 taraf\u0131ndan sa\u011flanacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Suudi Arabistan taraf\u0131ndan Mekke&#8217;de 600 mw g\u00fcce sahip g\u00fcne\u015f enerjisi projesinin in\u015faat\u0131na y\u00f6nelik ihale ger\u00e7ekle\u015ftirilecek. Suudi Arabistan\u2019\u0131n art\u0131\u015f g\u00f6steren elektrik talebinin yenilenebilir [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":90110,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[8771,34979,19638,26353,19,67,1009,48569,35038,23416,13593,7781,2569,23131,48574,48567,48571,48573,42867,1463,48570,48568,34977,26829,508,48572],"views":929,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/90108"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=90108"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/90108\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/90110"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=90108"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=90108"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=90108"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}