{"id":89862,"date":"2019-03-25T10:47:36","date_gmt":"2019-03-25T07:47:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=89862"},"modified":"2019-03-25T10:49:13","modified_gmt":"2019-03-25T07:49:13","slug":"abden-macaristanin-paks-2-nukleer-santralinin-yapimina-onay","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/abden-macaristanin-paks-2-nukleer-santralinin-yapimina-onay\/","title":{"rendered":"(Turkish) AB&#8217;den Macaristan\u2019\u0131n Pak\u015f-2 N\u00fckleer Santralinin Yap\u0131m\u0131na Onay"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/89862\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Macaristan D\u0131\u015fi\u015fleri Bakan\u0131 Peter Szijjarto taraf\u0131ndan Avrupa Birli\u011fi\u2019nin (AB) Pak\u015f-2 n\u00fckleer g\u00fc\u00e7 santralinin yap\u0131m\u0131na y\u00f6nelik onay verildi\u011fi belirtildi.<img loading=\"lazy\" class=\"alignright size-medium wp-image-89864\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/abden-macaristanin-paks-2-nukleer-santralinin-yapimina-onay-300x162.jpg\" alt=\"\" width=\"300\" height=\"162\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/abden-macaristanin-paks-2-nukleer-santralinin-yapimina-onay-300x162.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/abden-macaristanin-paks-2-nukleer-santralinin-yapimina-onay-768x416.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/abden-macaristanin-paks-2-nukleer-santralinin-yapimina-onay-500x271.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/abden-macaristanin-paks-2-nukleer-santralinin-yapimina-onay-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/abden-macaristanin-paks-2-nukleer-santralinin-yapimina-onay.jpg 902w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/h1>\n<p>Szijjarto yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, &#8220;Santralin planland\u0131\u011f\u0131ndan daha ge\u00e7 tarihlerde a\u00e7\u0131lacak olup gecikmenin temel nedeni, AB\u2019nin resmi prosed\u00fcrlerinin uzamas\u0131yla prosed\u00fcrlerin gerekti\u011finden daha fazla zaman almas\u0131 olmu\u015ftur. \u015eu anda prosed\u00fcrler tamamland\u0131 ve AB ye\u015fil \u0131\u015f\u0131k yakt\u0131&#8221; ifadelerini kulland\u0131.<\/p>\n<p>Ayr\u0131ca Szijjarto \u00fclkenin elektrik ihtiyac\u0131n\u0131n % 40\u2019\u0131n\u0131n n\u00fckleer enerji sayesinde kar\u015f\u0131land\u0131\u011f\u0131n\u0131, Pak\u015f-2\u2019nin a\u00e7\u0131lmas\u0131yla bu rakam\u0131n daha da art\u0131\u015f g\u00f6sterece\u011fini dile getirdi. Rusya ve Macaristan, 2014&#8217;te Pak\u015f-2 n\u00fckleer santralinin yap\u0131m\u0131na y\u00f6nelik anla\u015fma imzalam\u0131\u015ft\u0131. Santralin 12.5 milyar euro olan toplam yat\u0131r\u0131m bedelinin 10 milyarl\u0131k k\u0131sm\u0131 Rusya\u2019dan al\u0131nacak olan kredi ile kar\u015f\u0131lanacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Macaristan D\u0131\u015fi\u015fleri Bakan\u0131 Peter Szijjarto taraf\u0131ndan Avrupa Birli\u011fi\u2019nin (AB) Pak\u015f-2 n\u00fckleer g\u00fc\u00e7 santralinin yap\u0131m\u0131na y\u00f6nelik onay verildi\u011fi belirtildi. Szijjarto yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, &#8220;Santralin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":89864,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[1192,2132,67,1009,6666,36443,23134,25480,34931,34930,48292,48293,39847,885],"views":851,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/89862"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=89862"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/89862\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/89864"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=89862"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=89862"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=89862"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}