{"id":89698,"date":"2019-03-22T13:57:15","date_gmt":"2019-03-22T10:57:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=89698"},"modified":"2019-03-22T14:03:05","modified_gmt":"2019-03-22T11:03:05","slug":"akkuyu-ngsnin-personel-yetistirme-programi-ile-turk-genclerine-egitim","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngsnin-personel-yetistirme-programi-ile-turk-genclerine-egitim\/","title":{"rendered":"(Turkish) Akkuyu NGS&#8217;nin Personel Yeti\u015ftirme Program\u0131 \u0130le T\u00fcrk Gen\u00e7lerine E\u011fitim!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/89698\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Rusya Devlet Atom Enerjisi Kurumu Rosatom taraf\u0131ndan in\u015fa edilen ve T\u00fcrkiye\u2019nin ilk n\u00fckleer santrali olan Akkuyu NGS i\u00e7in personel yeti\u015ftirme s\u00fcreci Rusya\u2019da 2011 y\u0131l\u0131ndan bu yana s\u00fcr\u00fcyor. Rosatom, bu y\u0131l Saint Petersburg\u2019da bulunan St. Petersburg Politeknik \u00dcniversitesi&#8217;nde y\u00fcksek lisans program\u0131nda \u201cIs\u0131 Enerjisi\u201d ve \u201cElektrik Enerjisi\u201d b\u00f6l\u00fcmlerinde e\u011fitim almak isteyen T\u00fcrk \u00f6\u011frenciler i\u00e7in 25 ki\u015filik kota belirledi.<img loading=\"lazy\" class=\"alignright size-medium wp-image-89700\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/akkuyu-ngsnin-personel-yetistirme-programi-ile-turk-genclerine-egitim-300x300.jpg\" alt=\"\" width=\"300\" height=\"300\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/akkuyu-ngsnin-personel-yetistirme-programi-ile-turk-genclerine-egitim-300x300.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/akkuyu-ngsnin-personel-yetistirme-programi-ile-turk-genclerine-egitim-150x150.jpg 150w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/akkuyu-ngsnin-personel-yetistirme-programi-ile-turk-genclerine-egitim-400x400.jpg 400w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/akkuyu-ngsnin-personel-yetistirme-programi-ile-turk-genclerine-egitim-50x50.jpg 50w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/akkuyu-ngsnin-personel-yetistirme-programi-ile-turk-genclerine-egitim-100x100.jpg 100w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/akkuyu-ngsnin-personel-yetistirme-programi-ile-turk-genclerine-egitim.jpg 488w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/h1>\n<p>E\u011fitim sekt\u00f6r\u00fcnde \u00fclkeler aras\u0131ndaki etkile\u015fimin geli\u015ftirilmesine \u00f6zel \u00f6nem veren Rosatom, Rusya E\u011fitim ve Bilim Bakanl\u0131\u011f\u0131 ile i\u015f birli\u011fi i\u00e7erisinde ve n\u00fckleer alan\u0131nda uzmanlar yeti\u015ftirilmesi hedefiyle her y\u0131l yabanc\u0131 \u00f6\u011frenciler i\u00e7in e\u011fitim programlar\u0131 ger\u00e7ekle\u015ftiriyor. Bug\u00fcne kadar bir\u00e7ok T\u00fcrk \u00f6\u011frenci, Rusya\u2019daki e\u011fitimlerini ba\u015far\u0131 ile tamamlayarak mezun oldu.<\/p>\n<p>Saint Petersburg Politeknik \u00dcniversitesi\u2019nde 2019-2021 akademik y\u0131l\u0131 y\u00fcksek lisans program\u0131na kat\u0131lmak i\u00e7in son ba\u015fvuru tarihi <strong>1 Nisan 2019<\/strong> olarak duyuruldu. T\u00fcrk \u00f6\u011frencilerin kariyerleri i\u00e7in b\u00fcy\u00fck bir f\u0131rsat olu\u015fturacak olan y\u00fcksek lisans program\u0131 1 Eyl\u00fcl\u2019de ba\u015flayacak. Program\u0131n e\u011fitim dili ise \u0130ngilizce olacak.<\/p>\n<p>T\u00fcm e\u011fitim masraflar\u0131 Rusya Devleti taraf\u0131ndan kar\u015f\u0131lanacak. \u00d6\u011frencilere kamp\u00fcste bar\u0131nma imk\u00e2n\u0131 da sa\u011flanacak. Ayr\u0131ca \u00f6\u011frencilerin, ilk giri\u015flik vizesi, u\u00e7ak bileti ve havaalan\u0131 ula\u015f\u0131m masraflar\u0131 (y\u0131lda bir defa olmak \u00fczere) Akkuyu N\u00fckleer A.\u015e. taraf\u0131ndan kar\u015f\u0131lanacak.<\/p>\n<p>Rusya\u2019da n\u00fckleer enerji ve n\u00fckleer teknolojiler konusunda e\u011fitim alacak \u00f6\u011frencilere ayda 32 bin rublelik (yakla\u015f\u0131k 500 dolar) burs verilecek.<\/p>\n<p>E\u011fitim program\u0131na ba\u015fvuru yapmak isteyenler\u00a0<a href=\"http:\/\/www.akkunpp.com\/\">http:\/\/www.akkunpp.com<\/a>\u00a0ziyaret edebilmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rusya Devlet Atom Enerjisi Kurumu Rosatom taraf\u0131ndan in\u015fa edilen ve T\u00fcrkiye\u2019nin ilk n\u00fckleer santrali olan Akkuyu NGS i\u00e7in personel yeti\u015ftirme s\u00fcreci Rusya\u2019da [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":89702,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[3019,42302,48166,61,34980,26353,19,67,1009,13626,23134,48168,34931,34930,2587,885,42759,48167,48169,48165],"views":745,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/89698"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=89698"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/89698\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/89702"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=89698"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=89698"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=89698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}