{"id":89233,"date":"2019-03-14T23:20:39","date_gmt":"2019-03-14T20:20:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=89233"},"modified":"2019-03-14T23:22:25","modified_gmt":"2019-03-14T20:22:25","slug":"verimlilik-artirici-projelerde-vap-destek-bedeli-yuzde-20-den-yuzde-30-a-cikarildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/verimlilik-artirici-projelerde-vap-destek-bedeli-yuzde-20-den-yuzde-30-a-cikarildi\/","title":{"rendered":"(Turkish) Verimlilik Art\u0131r\u0131c\u0131 Proje&#8217;lerde (VAP) Destek Bedeli % 20&#8217;den % 30&#8217;a \u00c7\u0131kar\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/89233\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Verimlilik art\u0131r\u0131c\u0131 proje (vap) bedeli ve destek oran\u0131 ile enerji yo\u011funlu\u011funun azalt\u0131lmas\u0131na y\u00f6nelik yap\u0131lan g\u00f6n\u00fcll\u00fc anla\u015fma destek bedeli ve enerji gideri oranlar\u0131nda de\u011fi\u015fiklik yap\u0131ld\u0131.<\/h1>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-89235\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/verimlilik-artirici-projelerde-vap-destek-bedeli-yuzde-20-den-yuzde-30-a-cikarildi-300x180.jpg\" alt=\"\" width=\"300\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/verimlilik-artirici-projelerde-vap-destek-bedeli-yuzde-20-den-yuzde-30-a-cikarildi-300x180.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/verimlilik-artirici-projelerde-vap-destek-bedeli-yuzde-20-den-yuzde-30-a-cikarildi-768x461.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/verimlilik-artirici-projelerde-vap-destek-bedeli-yuzde-20-den-yuzde-30-a-cikarildi-500x300.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/verimlilik-artirici-projelerde-vap-destek-bedeli-yuzde-20-den-yuzde-30-a-cikarildi-80x48.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/verimlilik-artirici-projelerde-vap-destek-bedeli-yuzde-20-den-yuzde-30-a-cikarildi.jpg 1000w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Konuya ili\u015fkin Cumhurba\u015fkan\u0131 karar\u0131 Resmi Gazete&#8217;nin ilgili say\u0131s\u0131nda yay\u0131mland\u0131.<\/p>\n<p>Bu kapsamda, 5627 say\u0131l\u0131 Enerji Verimlili\u011fi Kanunu&#8217;nun 8&#8217;inci maddesi kapsam\u0131nda yer alan proje bedeli 1 milyon T\u00fcrk liras\u0131ndan 5 milyon T\u00fcrk liras\u0131na, destek oran\u0131 ise y\u00fczde 20&#8217;den y\u00fczde 30&#8217;a \u00e7\u0131kar\u0131ld\u0131.<\/p>\n<p>Ayr\u0131ca, destek bedeli oran\u0131 200 bin T\u00fcrk liras\u0131ndan 1 milyon T\u00fcrk liras\u0131na, enerji gideri oran\u0131 ise y\u00fczde 20&#8217;den y\u00fczde 30&#8217;a y\u00fckseltildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Verimlilik art\u0131r\u0131c\u0131 proje (vap) bedeli ve destek oran\u0131 ile enerji yo\u011funlu\u011funun azalt\u0131lmas\u0131na y\u00f6nelik yap\u0131lan g\u00f6n\u00fcll\u00fc anla\u015fma destek bedeli ve enerji gideri oranlar\u0131nda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":89235,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,52],"tags":[6802,7711,47803,47801,47802,67,1009,26559,2408,40803,3344,1388,1781,793,6204],"views":1365,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/89233"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=89233"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/89233\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/89235"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=89233"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=89233"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=89233"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}