{"id":89020,"date":"2019-03-11T19:31:08","date_gmt":"2019-03-11T16:31:08","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=89020"},"modified":"2019-03-11T19:32:43","modified_gmt":"2019-03-11T16:32:43","slug":"jeotermal-enerjide-elektrik-uretimi-artis-gosterdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/jeotermal-enerjide-elektrik-uretimi-artis-gosterdi\/","title":{"rendered":"(Turkish) Jeotermal Enerjide Elektrik \u00dcretimi Art\u0131\u015f G\u00f6sterdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/89020\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Jeotermal Elektrik Santral Yat\u0131r\u0131mc\u0131lar\u0131 Derne\u011fi&#8217;nin (JESDER) yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, T\u00fcrkiye&#8217;de jeotermal elektrik santrallerinin kurulu g\u00fcc\u00fcn\u00fcn \u015fubat ay\u0131 sonu itibar\u0131 ile 1347 mw&#8217;a ula\u015ft\u0131\u011f\u0131 belirtildi.<\/h1>\n<p>T\u00fcrkiye&#8217;nin ge\u00e7ti\u011fimiz y\u0131l jeotermal enerjiden 6 milyar 894 milyon 164 bin kilovatsaat elektrik<\/p>\n<h2><img loading=\"lazy\" class=\"alignleft size-medium wp-image-89022\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/jeotermal-enerjide-elektrik-uretimi-artis-gosterdi-300x158.jpg\" alt=\"\" width=\"300\" height=\"158\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/jeotermal-enerjide-elektrik-uretimi-artis-gosterdi-300x158.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/jeotermal-enerjide-elektrik-uretimi-artis-gosterdi-500x263.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/jeotermal-enerjide-elektrik-uretimi-artis-gosterdi-80x42.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/jeotermal-enerjide-elektrik-uretimi-artis-gosterdi.jpg 752w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/h2>\n<p>\u00fcretildi\u011finin belirtildi\u011fi a\u00e7\u0131klamada, 2019 y\u0131l\u0131n\u0131n Ocak ve \u015eubat aylar\u0131nda ge\u00e7ti\u011fimiz y\u0131l\u0131n ayn\u0131 d\u00f6nemine g\u00f6re \u00fcretimin y\u00fczde 23,75 art\u0131\u015f g\u00f6stererek 1 milyon 374 bin 690 megavatsaate \u00e7\u0131kt\u0131\u011f\u0131 a\u00e7\u0131kland\u0131.<\/p>\n<h2>3000 MW Kurulu G\u00fcce Ula\u015fma Hedefi Mevcut<\/h2>\n<p>T\u00fcrkiye&#8217;nin 2020 y\u0131l\u0131na kadar kurulu g\u00fcc\u00fcn\u00fcn 2000 MW&#8217;a \u00e7\u0131kaca\u011f\u0131n\u0131 \u00f6ng\u00f6rd\u00fcklerini belirten K\u0131ndap,&#8221;2023&#8217;de ise 3000 mw kurulu g\u00fcce ula\u015fma hedefimiz mevcut ancak bunlar i\u00e7in sekt\u00f6r\u00fcn \u00f6n\u00fcn\u00fc g\u00f6rmesi gerekiyor. Ocak&#8217;ta jeotermal kaynaklardan 715.160 megavatsaat, \u015fubatta ise 659.529 megavatsaat elektrik \u00fcretimi ger\u00e7ekle\u015fmi\u015ftir.&#8221; dedi.<\/p>\n<p>Ayr\u0131ca K\u0131ndap, jeotermalin serac\u0131l\u0131k, \u015fehir \u0131s\u0131tmas\u0131 gibi alanlarda yayg\u0131nla\u015ft\u0131r\u0131lmas\u0131yla T\u00fcrkiye\u2019nin % 70\u2019inin jeotermal enerji ile konut ve sera \u0131s\u0131tmas\u0131 ger\u00e7ekle\u015ftirebilece\u011fi de dile getirildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Jeotermal Elektrik Santral Yat\u0131r\u0131mc\u0131lar\u0131 Derne\u011fi&#8217;nin (JESDER) yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, T\u00fcrkiye&#8217;de jeotermal elektrik santrallerinin kurulu g\u00fcc\u00fcn\u00fcn \u015fubat ay\u0131 sonu itibar\u0131 ile 1347 mw&#8217;a ula\u015ft\u0131\u011f\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":89022,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,48],"tags":[34979,19638,26353,19,67,1009,29545,37424,35040,23226,34986,43688,34985,26929,47628],"views":919,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/89020"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=89020"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/89020\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/89022"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=89020"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=89020"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=89020"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}