{"id":88583,"date":"2019-03-06T12:00:36","date_gmt":"2019-03-06T09:00:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=88583"},"modified":"2019-03-06T12:01:44","modified_gmt":"2019-03-06T09:01:44","slug":"guris-ukraynada-res-yatirimi-gerceklestirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/guris-ukraynada-res-yatirimi-gerceklestirdi\/","title":{"rendered":"(Turkish) G\u00dcR\u0130\u015e, Ukrayna\u2019da RES Yat\u0131r\u0131m\u0131 Ger\u00e7ekle\u015ftirdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/88583\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>G\u00dcR\u0130\u015e Holding taraf\u0131ndan Kosova\u2019n\u0131n \u0130lk R\u00fczgar Enerji Santralinden sonra ikinci yurt d\u0131\u015f\u0131 yat\u0131r\u0131m\u0131 Ukrayna\u2019n\u0131n Odesa\/Ovidiopol b\u00f6lgesinde yap\u0131ld\u0131.<img loading=\"lazy\" class=\"alignright wp-image-88585 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/guris-ukraynada-res-yatirimi-gerceklestirdi-300x179.jpg\" alt=\"\" width=\"300\" height=\"179\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/guris-ukraynada-res-yatirimi-gerceklestirdi-300x179.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/guris-ukraynada-res-yatirimi-gerceklestirdi-500x298.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/guris-ukraynada-res-yatirimi-gerceklestirdi-80x48.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/guris-ukraynada-res-yatirimi-gerceklestirdi.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/h1>\n<p>T\u00fcrkiye\u2019nin \u00f6nde gelen enerji yat\u0131r\u0131mc\u0131s\u0131 konumundaki G\u00dcR\u0130\u015e Holding, yenilenebilir enerjiye dayal\u0131 yurtd\u0131\u015f\u0131 yat\u0131r\u0131mlar\u0131n\u0131 devreye almay\u0131 s\u00fcrd\u00fcr\u00fcyor. Yurt d\u0131\u015f\u0131nda 4 ay \u00f6nce faaliyete ge\u00e7irilen Kosova\u2019n\u0131n \u0130lk R\u00fczgar Enerji Santrali olan \u201932.4 MW Kitka\u2019 RES\u2019ten sonra yine y\u00fczde 100 G\u00dcR\u0130\u015e yat\u0131r\u0131m\u0131 olan Ukrayna\u2019n\u0131n Odesa\/Ovidiopol b\u00f6lgesindeki 30 MW g\u00fcc\u00fcndeki \u2018OVID\u2019 RES\u2019in yat\u0131r\u0131m\u0131n\u0131 tamamlad\u0131.<\/p>\n<p>G\u00dcR\u0130\u015e\u2019in Ukrayna\u2019daki ilk yat\u0131r\u0131m\u0131 olan OVID R\u00fczgar Enerji Santraliyle y\u0131lda toplam 118 milyon kWs elektrik \u00fcretilecek olup 32 bin hanenin y\u0131ll\u0131k elektrik ihtiyac\u0131 da kar\u015f\u0131lanacakt\u0131r. Santralde 9 adet; kule y\u00fcksekli\u011fi 131.4 m ve kanat \u00e7ap\u0131 137 m olan GE 3.6 \u2013 137 t\u00fcrbinler elektrik \u00fcretimi ger\u00e7ekle\u015ftirmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. G\u00dcR\u0130\u015e Holding taraf\u0131ndan Kosova\u2019n\u0131n \u0130lk R\u00fczgar Enerji Santralinden sonra ikinci yurt d\u0131\u015f\u0131 yat\u0131r\u0131m\u0131 Ukrayna\u2019n\u0131n Odesa\/Ovidiopol b\u00f6lgesinde yap\u0131ld\u0131. T\u00fcrkiye\u2019nin \u00f6nde gelen enerji yat\u0131r\u0131mc\u0131s\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":88585,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[34979,19638,26353,19,67,1009,6320,47403,47405,47404,35002,233,36999,34977,26829],"views":1096,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/88583"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=88583"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/88583\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/88585"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=88583"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=88583"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=88583"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}