{"id":88502,"date":"2019-03-05T00:41:02","date_gmt":"2019-03-04T21:41:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=88502"},"modified":"2019-03-05T00:46:35","modified_gmt":"2019-03-04T21:46:35","slug":"izmir-torbalida-5000-konutun-gunluk-enerjisi-gunesten-karsilaniyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/izmir-torbalida-5000-konutun-gunluk-enerjisi-gunesten-karsilaniyor\/","title":{"rendered":"(Turkish) \u0130zmir Torbal\u0131\u2019da 5000 Konutun G\u00fcnl\u00fck Enerjisi G\u00fcne\u015ften Kar\u015f\u0131lan\u0131yor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/88502\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>\u0130zmir\u2019in Torbal\u0131 il\u00e7esinde 300 dekarl\u0131k alana kurulumu yap\u0131lan g\u00fcne\u015f enerjisi santrali (GES) ile g\u00fcnde 5 bin evin ihtiyac\u0131n\u0131 kar\u015f\u0131layacak kadar elektrik \u00fcretimi ger\u00e7ekle\u015fiyor.<img loading=\"lazy\" class=\"alignright size-medium wp-image-88504\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/izmir-torbalida-5000-konutun-gunluk-enerjisi-gunesten-karsilaniyor-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/izmir-torbalida-5000-konutun-gunluk-enerjisi-gunesten-karsilaniyor-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/izmir-torbalida-5000-konutun-gunluk-enerjisi-gunesten-karsilaniyor-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/izmir-torbalida-5000-konutun-gunluk-enerjisi-gunesten-karsilaniyor-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/03\/izmir-torbalida-5000-konutun-gunluk-enerjisi-gunesten-karsilaniyor.jpg 590w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/h1>\n<p>8 y\u0131lda maliyetini kar\u015f\u0131lamas\u0131 beklenen, do\u011fu-bat\u0131 ve kuzey-g\u00fcney y\u00f6nlerinde toplam 40 bin g\u00fcne\u015f panelinin yer ald\u0131\u011f\u0131 tesiste \u00fcretilen elektrik, do\u011frudan ana ak\u0131ma transfer edilerek kullan\u0131ma sunuluyor. Tesiste 1 saat i\u00e7inde \u00fcretilen 12 mw elektrik ise bir da\u011f\u0131t\u0131m \u015firketine sat\u0131l\u0131yor ve g\u00fcnde 5000 konutun enerji ihtiyac\u0131n\u0131 kar\u015f\u0131layacak enerji elde ediliyor.<\/p>\n<p>Tesisin kurulum, bak\u0131m ve kontrol sorumlusu Ramazan Sar\u0131, &#8220;Do\u011fa i\u00e7in en uygun \u00fcretim y\u00f6ntemi olan g\u00fcne\u015f enerjisi ile elektrik \u00fcretiyoruz. \u0130lk kurulumda maliyetini k\u0131sa s\u00fcrede kar\u015f\u0131layarak kar edilebilen bu sistemin \u00f6mr\u00fc 25 y\u0131ld\u0131r. Bu tesisleri genellikle bu saha gibi tar\u0131ma elveri\u015fli olmayan arazilere kuruluyor. \u0130zmir\u2019in en b\u00fcy\u00fck g\u00fcne\u015f tarlas\u0131 sahalar\u0131ndan biri Torbal\u0131\u2019daki bu tesisle hem do\u011faya zarar vermeden \u00fcretim yapt\u0131\u011f\u0131m\u0131z hem de d\u0131\u015fa ba\u011f\u0131ml\u0131l\u0131\u011f\u0131 azaltt\u0131\u011f\u0131m\u0131z i\u00e7in mutluyuz\u201d ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130zmir\u2019in Torbal\u0131 il\u00e7esinde 300 dekarl\u0131k alana kurulumu yap\u0131lan g\u00fcne\u015f enerjisi santrali (GES) ile g\u00fcnde 5 bin evin ihtiyac\u0131n\u0131 kar\u015f\u0131layacak kadar elektrik \u00fcretimi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":88504,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[14879,42030,67,1009,35038,31710,23416,35039,23133,142,35037,23131,2689,47359,42867,34977,47360,26829],"views":891,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/88502"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=88502"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/88502\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/88504"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=88502"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=88502"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=88502"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}