{"id":88212,"date":"2019-02-28T23:49:35","date_gmt":"2019-02-28T20:49:35","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=88212"},"modified":"2019-02-28T23:52:40","modified_gmt":"2019-02-28T20:52:40","slug":"dubaide-900-mw-gucunde-gunes-enerjisi-ihalesi-acildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/dubaide-900-mw-gucunde-gunes-enerjisi-ihalesi-acildi\/","title":{"rendered":"(Turkish) Dubai&#8217;de 900 MW G\u00fcc\u00fcnde G\u00fcne\u015f Enerjisi \u0130halesi A\u00e7\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/88212\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Dubai Elektrik ve Su \u0130daresi (DEWA) taraf\u0131ndan d\u00fcnyan\u0131n en b\u00fcy\u00fck konsantre g\u00fcne\u015f enerjisi santrali Mohammed Bin Rashid Al Maktoum G\u00fcne\u015f Park\u0131 i\u00e7inde yer alan 900 MW\u2019l\u0131k g\u00fcne\u015f enerjisi santraline y\u00f6nelik ihale a\u00e7\u0131ld\u0131.<\/h1>\n<p><img loading=\"lazy\" class=\"alignright size-medium wp-image-88214\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/dubaide-900-mw-gucunde-gunes-enerjisi-ihalesi-acildi-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/dubaide-900-mw-gucunde-gunes-enerjisi-ihalesi-acildi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/dubaide-900-mw-gucunde-gunes-enerjisi-ihalesi-acildi-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/dubaide-900-mw-gucunde-gunes-enerjisi-ihalesi-acildi-1024x576.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/dubaide-900-mw-gucunde-gunes-enerjisi-ihalesi-acildi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/dubaide-900-mw-gucunde-gunes-enerjisi-ihalesi-acildi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/dubaide-900-mw-gucunde-gunes-enerjisi-ihalesi-acildi.jpg 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>2021&#8217;in ikinci \u00e7eyre\u011finde devreye girecek Dubai\u2019nin Faz V projesi kapsam\u0131nda, tesiste \u00fcretilen \u00fcretilen enerji DEWA taraf\u0131ndan uzun vadeli bir enerji sat\u0131n alma s\u00f6zle\u015fmesi (PPA) kapsam\u0131nda sat\u0131n al\u0131nacak.<\/p>\n<p>Pv-tech\u2019te yer alan ihale haberine g\u00f6re; Dubai\u2019nin b\u00f6lgesel kom\u015fusu olan Birle\u015fik Arap Emirlikleri\u2019nin ba\u015fkenti Abu Dhabi\u2019nin Emirates Su ve Elektrik \u015eirketi (EWEC) arac\u0131l\u0131\u011f\u0131yla 2 GW g\u00fcne\u015f enerjisi ihalesini duyurmas\u0131ndan k\u0131sa bir s\u00fcre sonra geldi. \u0130hale i\u00e7in <strong>31 Mart 2019<\/strong>&#8216;a kadar Yeterlilik Beyan\u0131 (SOQ) sunulabilecek.<\/p>\n<p>DEWA ge\u00e7en Kas\u0131m ay\u0131, Mohammed bin Rashid Al Maktoum G\u00fcne\u015f Park\u0131\u2019n\u0131n 4&#8217;\u00fcnc\u00fc a\u015famas\u0131nda Suudi merkezli geli\u015ftirici ACWA Power liderli\u011findeki bir konsorsiyum ile yap\u0131lan anla\u015fma \u00e7er\u00e7evesinde 250 MW g\u00fcne\u015f enerjisi santrali (CSP) ilave etmi\u015fti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Dubai Elektrik ve Su \u0130daresi (DEWA) taraf\u0131ndan d\u00fcnyan\u0131n en b\u00fcy\u00fck konsantre g\u00fcne\u015f enerjisi santrali Mohammed Bin Rashid Al Maktoum G\u00fcne\u015f Park\u0131 i\u00e7inde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":88214,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[47188,20782,3648,47192,9827,47191,34979,19638,34980,26353,42030,67,1009,7097,532,47189,35038,23416,13593,23133,34925,35037,23131,47184,47185,47190,47187,34977,26829,47186],"views":1269,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/88212"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=88212"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/88212\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/88214"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=88212"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=88212"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=88212"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}