{"id":88147,"date":"2019-02-28T09:43:06","date_gmt":"2019-02-28T06:43:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=88147"},"modified":"2019-02-28T09:46:37","modified_gmt":"2019-02-28T06:46:37","slug":"briza-ruzgar-santralinde-gunes-enerjisi-santrali-kurulumu-yapildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/briza-ruzgar-santralinde-gunes-enerjisi-santrali-kurulumu-yapildi\/","title":{"rendered":"(Turkish) Briza R\u00fczgar Santrali\u2019nde G\u00fcne\u015f Enerjisi Santrali Kurulumu Yap\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/88147\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Bal\u0131kesir\u2019de kurulmu\u015f olan 52,8 MW g\u00fcce sahip Briza RES (Briza R\u00fczg\u00e2r Elektrik \u00dcretim San. ve Tic. A.\u015e. \/ Kavakl\u0131 RES) kamula\u015ft\u0131rma alan\u0131 i\u00e7indeki at\u0131l alanda 1 MW g\u00fcc\u00fcnde GES kurularak devreye al\u0131nd\u0131.<\/h1>\n<p>Y\u00f6netim Kurulu Ba\u015fkan\u0131 Emre Erciyas yapt\u0131\u011f\u0131 a\u00e7\u0131klamada; &#8220;T\u00fcrkiye\u2019de toplam 7.369 MW kurulu g\u00fcc\u00fcnde 180 adet RES mevcuttur. Bu tesislere ait kamula\u015ft\u0131rma arazileri bir \u015fekilde etkin kullan\u0131ma <img loading=\"lazy\" class=\"alignleft size-medium wp-image-88149\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/briza-ruzgar-santralinde-gunes-enerjisi-santrali-kurulumu-yapildi2-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/briza-ruzgar-santralinde-gunes-enerjisi-santrali-kurulumu-yapildi2-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/briza-ruzgar-santralinde-gunes-enerjisi-santrali-kurulumu-yapildi2-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/briza-ruzgar-santralinde-gunes-enerjisi-santrali-kurulumu-yapildi2.jpg 390w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>a\u00e7\u0131lmal\u0131d\u0131r. Kamula\u015ft\u0131rmalar\u0131n, imara y\u00f6nelik i\u015flemlerin bitti\u011fi bir yerde neden GES kurulmas\u0131n diye d\u00fc\u015f\u00fcnd\u00fck. Bakt\u0131\u011f\u0131m\u0131z zaman ayr\u0131 bir yere GES kurmaya y\u00f6nelik bir\u00e7ok kurumdan izin al\u0131n\u0131yor ve tekrar eden bir\u00e7ok i\u015flemden ge\u00e7iyor. Bu ciddi bir emek ve zaman kayb\u0131d\u0131r.\u201d dedi.<\/p>\n<p>Bu kay\u0131plar\u0131n RES alanlar\u0131ndaki GES kurmakla azalt\u0131laca\u011f\u0131n\u0131 dile getiren Erciyas ayr\u0131ca, &#8220;D\u00fc\u015f\u00fcncemizin do\u011fru oldu\u011funu projemiz sonunda g\u00f6rd\u00fck. Bu nokta kullan\u0131lmayan alanlar\u0131n kullan\u0131m\u0131, bak\u0131m, i\u015fletme maliyetlerinin optimize edilmesi a\u00e7\u0131s\u0131ndan \u00e7ok \u00f6nemlidir ve ciddi oranda tasarruf sa\u011flamaktad\u0131r. \u0130lgililerden RES sahibi t\u00fczel ki\u015filerin kamula\u015ft\u0131rma alanlar\u0131 \u00fczerinde GES kurmalar\u0131n\u0131 te\u015fvik edecek, hatta belki zorunlu k\u0131lacak d\u00fczenlemeleri yapmas\u0131n\u0131\u00a0bekliyoruz.\u201d ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Bal\u0131kesir\u2019de kurulmu\u015f olan 52,8 MW g\u00fcce sahip Briza RES (Briza R\u00fczg\u00e2r Elektrik \u00dcretim San. ve Tic. A.\u015e. \/ Kavakl\u0131 RES) kamula\u015ft\u0131rma alan\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":88150,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,50],"tags":[3613,47128,47129,34979,19638,34980,26353,42030,47132,67,1009,21886,23416,23133,34925,23131,47131,47130,35002,22653,24949,35004,23318,34961,35035,34960,34977,26829],"views":1662,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/88147"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=88147"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/88147\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/88150"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=88147"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=88147"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=88147"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}