{"id":87398,"date":"2019-02-15T00:17:32","date_gmt":"2019-02-14T21:17:32","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=87398"},"modified":"2019-02-15T00:20:46","modified_gmt":"2019-02-14T21:20:46","slug":"ruzgarda-650-milyon-dolarlik-yatirim","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ruzgarda-650-milyon-dolarlik-yatirim\/","title":{"rendered":"(Turkish) R\u00fczgar&#8217;da 650 Milyon Dolarl\u0131k Yat\u0131r\u0131m"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/87398\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>R\u00fczg\u00e2r sekt\u00f6r\u00fcndeki geli\u015fmeleri i\u00e7eren 2018 r\u00fczg\u00e2r enerjisi istatistik raporu yay\u0131nland\u0131. T\u00fcrkiye R\u00fczg\u00e2r Enerjisi Birli\u011fi\u2019nin alt\u0131 ayda bir yay\u0131nlad\u0131\u011f\u0131 rapora g\u00f6re 2018 y\u0131l\u0131nda 497 MW kurulu g\u00fc\u00e7 ile 650 milyon dolarl\u0131k yat\u0131r\u0131m hayata ge\u00e7irildi. T\u00fcrkiye\u2019nin toplam r\u00fczg\u00e2r kurulu g\u00fcc\u00fc 7369 MW\u2019a ula\u015ft\u0131. T\u00fcrkiye R\u00fczg\u00e2r Enerjisi Birli\u011fi (T\u00dcREB) Ba\u015fkan\u0131 Mustafa Serdar Ataseven, hem yurti\u00e7inde hem yurtd\u0131\u015f\u0131nda ilgiyle takip edilen rapor hakk\u0131nda de\u011ferlendirmelerde bulundu.<\/strong><\/p>\n<h2>Bug\u00fcne kadar 11 Milyar Dolarl\u0131k yat\u0131r\u0131m ger\u00e7ekle\u015fti<\/h2>\n<p>Ge\u00e7ti\u011fimiz y\u0131l\u0131n kapasite art\u0131\u015f talepleri, 2020 y\u0131l\u0131 sonras\u0131ndaki yerlile\u015fme politikas\u0131 ve destek mekanizmalar\u0131n\u0131n durumu ile ilgili yo\u011fun bir g\u00fcndemle ge\u00e7ti\u011fini ifade eden Ataseven,\u00a0 gelinen noktada \u015fu konulara dikkat \u00e7ekti.<\/p>\n<p><img loading=\"lazy\" class=\"alignright size-medium wp-image-87400\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/ruzgarda-650-milyon-dolarlik-yatirim2-300x152.jpg\" alt=\"\" width=\"300\" height=\"152\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/ruzgarda-650-milyon-dolarlik-yatirim2-300x152.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/ruzgarda-650-milyon-dolarlik-yatirim2-500x253.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/ruzgarda-650-milyon-dolarlik-yatirim2-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/ruzgarda-650-milyon-dolarlik-yatirim2.jpg 609w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>\u201cBiliyorsunuz son y\u0131llarda t\u00fcm d\u00fcnyada ya\u015fanan ekonomik dalgalanmalar hepimize kolay olmayan s\u00fcre\u00e7ler getirdi. 2018 y\u0131l\u0131nda r\u00fczg\u00e2r sekt\u00f6r\u00fcnde 650 milyon dolarl\u0131k yat\u0131r\u0131m\u0131 hayata ge\u00e7irmemiz, zor ko\u015fullara ra\u011fmen neler ba\u015farabilece\u011fimizi bir kez daha g\u00f6sterdi. Her sorunun bir f\u0131rsat\u0131 bar\u0131nd\u0131rd\u0131\u011f\u0131na olan inanc\u0131m\u0131zla s\u00fcrd\u00fcr\u00fclebilir bir sekt\u00f6r yaratmay\u0131 ama\u00e7lad\u0131k. O yolda istikrarl\u0131 \u015fekilde ilerliyoruz.<\/p>\n<p>Bir s\u00fcredir \u00e7e\u015fitli nedenlerle proje \u00fcretilemedi\u011fi i\u00e7in in\u015fa halinde olan projelerin 2018 y\u0131l\u0131 i\u00e7in 606 MW\u2019a kadar geriledi\u011finin bilincindeyiz. Bununla birlikte s\u00fcrd\u00fcr\u00fclebilirli\u011fi sa\u011flamak ad\u0131na kapasite art\u0131\u015f <img loading=\"lazy\" class=\"alignleft size-medium wp-image-87401\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/ruzgarda-650-milyon-dolarlik-yatirim3-300x147.jpg\" alt=\"\" width=\"300\" height=\"147\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/ruzgarda-650-milyon-dolarlik-yatirim3-300x147.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/ruzgarda-650-milyon-dolarlik-yatirim3-500x244.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/ruzgarda-650-milyon-dolarlik-yatirim3-80x39.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/ruzgarda-650-milyon-dolarlik-yatirim3.jpg 614w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>taleplerini g\u00fcndeme ta\u015f\u0131d\u0131k. Sekt\u00f6re katk\u0131 sa\u011flayacak bu talebimiz olumlu kar\u015f\u0131land\u0131 ve birka\u00e7 ay i\u00e7inde \u00f6n\u00fcn\u00fcn a\u00e7\u0131lmas\u0131n\u0131 bekliyoruz. Kapasite art\u0131\u015flar\u0131yla birlikte bu y\u0131l ve \u00f6n\u00fcm\u00fczdeki y\u0131l kurulu g\u00fcc\u00fcm\u00fczde ciddi bir ivme olacakt\u0131r. Sonras\u0131nda da 2017 y\u0131l\u0131n\u0131n sonunda yap\u0131lan yar\u0131\u015fmalar\u0131n sonu\u00e7lar\u0131 yans\u0131maya ba\u015flayacakt\u0131r. B\u00f6ylece sekt\u00f6r h\u0131z kesmeden yerlile\u015fme politikas\u0131na devam etmi\u015f olacakt\u0131r. Bug\u00fcne kadar r\u00fczg\u00e2r sekt\u00f6r\u00fcnde yakla\u015f\u0131k 11 milyar dolarl\u0131k yat\u0131r\u0131m ger\u00e7ekle\u015fti. \u00dclkemizin gelece\u011fini ve d\u0131\u015fa ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n\u0131 yak\u0131ndan ilgilendiren bu yat\u0131r\u0131mlar bundan sonra da h\u0131zla devam edecektir.\u201d<\/p>\n<h2>Kurulu G\u00fc\u00e7te Y\u00fczde 7,24\u2019l\u00fck Art\u0131\u015f<\/h2>\n<p>T\u00dcREB istatistik raporunda \u00fclkemizin toplam r\u00fczg\u00e2r kurulu g\u00fcc\u00fc, 2018 sonu itibariyle 7369 MW oldu\u011fu belirtiliyor. Ge\u00e7en y\u0131la g\u00f6re y\u00fczde 7,24\u2019l\u00fck art\u0131\u015f sa\u011flan\u0131rken, i\u015fletmedeki proje say\u0131s\u0131n\u0131n da 164\u2019den 180\u2019e \u00e7\u0131kt\u0131\u011f\u0131 g\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>\u0130\u015fletmedeki RES\u2019lerin yat\u0131r\u0131mc\u0131lara g\u00f6re da\u011f\u0131l\u0131m\u0131nda 566 MW ile Polat Enerji birinci s\u0131rada yer al\u0131rken, 494 MW ile Demirer Enerji, 481 MW ile G\u00fcri\u015f, 436 MW ile Borusan EnBW onu izliyor.<\/p>\n<p>\u0130\u015fletmedeki r\u00fczg\u00e2r enerjisi santrallerinin % 38,43\u2019\u00fc Ege b\u00f6lgesinde, % 33,23\u2019\u00fc Marmara\u2019da, % 13,52\u2019si Akdeniz\u2019de ve % 9,86\u2019s\u0131 \u0130\u00e7 Anadolu B\u00f6lgesinde bulunuyor. Karadeniz ve G\u00fcneydo\u011fu Anadolu yat\u0131r\u0131mlar\u0131 hen\u00fcz olduk\u00e7a az. Do\u011fu Anadolu B\u00f6lgesinde i\u015fletmede bir santral bulunmuyor.<\/p>\n<h2>Toplam Kurulu G\u00fcc\u00fcn Yar\u0131s\u0131 Be\u015f \u0130lde Bulunuyor<\/h2>\n<p>\u0130llere g\u00f6re s\u0131ralamaya bakt\u0131\u011f\u0131m\u0131zda 1405 MW ile \u0130zmir ilk s\u0131rada yer al\u0131yor. \u0130zmir yaln\u0131zca r\u00fczgar yat\u0131r\u0131mlar\u0131 a\u00e7\u0131s\u0131ndan de\u011fil ayn\u0131 zamanda r\u00fczgar sanayisi a\u00e7\u0131s\u0131ndan da en ilk s\u0131rada yer alan ilimiz. Bal\u0131kesir 1123 MW, Manisa 669 MW, Hatay 364 MW ve \u00c7anakkale 362 MW kurulu g\u00fc\u00e7 ile en fazla r\u00fczg\u00e2r santralinin bulundu\u011fu iller aras\u0131nda. R\u00fczg\u00e2r kurulu g\u00fcc\u00fcn\u00fcn yar\u0131s\u0131ndan fazlas\u0131 bu be\u015f ilde bulunuyor.<\/p>\n<p>Ba\u015fvuru tarihlerine g\u00f6re i\u015fletmedeki RES\u2019lerin y\u00fczde 62\u2019si 2007 y\u0131l\u0131 \u00f6ncesindeki ba\u015fvurulara ait. 1 Kas\u0131m 2007 tarihinden sonraki projelerin y\u00fczde 27\u2019si i\u015fletmeye ge\u00e7mi\u015f durumda. Y\u00fczde 11\u2019lik k\u0131sm\u0131n da ilave kapasite art\u0131\u015f\u0131ndan olu\u015ftu\u011fu vurgulan\u0131yor.<\/p>\n<h2>606 MW \u0130n\u015fa Halinde RES<\/h2>\n<p>\u0130n\u015fas\u0131 devam eden 606 MW\u2019l\u0131k onsekiz proje i\u00e7inde en b\u00fcy\u00fck pay 243 MW ile Akfen Enerji\u2019ye ait. 124 MW ile A\u011fao\u011flu Enerji, 72 MW ile Sancak Enerji onu izliyor. \u0130n\u015fa halinde projelerin y\u00fczde 66\u2019s\u0131 Marmara B\u00f6lgesinde bulunuyor. Y\u00fczde 2 gibi bir k\u0131sm\u0131n da Do\u011fu Anadolu B\u00f6lgesinde oldu\u011fu g\u00f6r\u00fcl\u00fcyor. 203 MW\u2019\u0131 \u00c7anakkale\u2019de olan projelerin 124 MW\u2019\u0131 Bal\u0131kesir\u2019de ilerlerken, 72 MW\u2019\u0131 da \u0130zmir\u2019de bulunuyor.<\/p>\n<p>Rapora g\u00f6re a\u011f\u0131rl\u0131kl\u0131 olarak Marmara B\u00f6lgesinde olan, 2239 MW\u2019l\u0131k lisansl\u0131, 4483 MW\u2019l\u0131k \u00f6n lisansl\u0131 proje oldu\u011fu belirtiliyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.R\u00fczg\u00e2r sekt\u00f6r\u00fcndeki geli\u015fmeleri i\u00e7eren 2018 r\u00fczg\u00e2r enerjisi istatistik raporu yay\u0131nland\u0131. T\u00fcrkiye R\u00fczg\u00e2r Enerjisi Birli\u011fi\u2019nin alt\u0131 ayda bir yay\u0131nlad\u0131\u011f\u0131 rapora g\u00f6re 2018 y\u0131l\u0131nda 497 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":87402,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[67,1009,3388,35002,24949,35004,23318,34961,34960,1682,3390],"views":898,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/87398"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=87398"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/87398\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/87402"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=87398"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=87398"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=87398"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}