{"id":87208,"date":"2019-02-11T14:51:50","date_gmt":"2019-02-11T11:51:50","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=87208"},"modified":"2019-02-11T14:52:53","modified_gmt":"2019-02-11T11:52:53","slug":"bolu-belediyesi-1-mw-guce-sahip-ges-santrali-ile-kendi-enerjisini-uretiyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bolu-belediyesi-1-mw-guce-sahip-ges-santrali-ile-kendi-enerjisini-uretiyor\/","title":{"rendered":"(Turkish) Bolu Belediyesi, 1 MW G\u00fcce Sahip Ges Santrali \u0130le Kendi Enerjisini \u00dcretiyor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/87208\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Bolu Belediyesi, Nisan ay\u0131nda Sar\u0131calar \u0130\u00e7me Suyu Ar\u0131tma Tesisi arazisine kurulan 1 MW <img loading=\"lazy\" class=\"alignleft size-medium wp-image-87210\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/bolu-belediyesi-1-mw-guce-sahip-ges-santrali-ile-kendi-enerjisini-uretiyor-300x171.jpg\" alt=\"\" width=\"300\" height=\"171\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/bolu-belediyesi-1-mw-guce-sahip-ges-santrali-ile-kendi-enerjisini-uretiyor-300x171.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/bolu-belediyesi-1-mw-guce-sahip-ges-santrali-ile-kendi-enerjisini-uretiyor-500x285.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/bolu-belediyesi-1-mw-guce-sahip-ges-santrali-ile-kendi-enerjisini-uretiyor-80x46.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/bolu-belediyesi-1-mw-guce-sahip-ges-santrali-ile-kendi-enerjisini-uretiyor.jpg 650w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>G\u00fcne\u015f Enerjisi Santrali (GES)\u2019nden kendi enerjisini \u00fcretiyor.<\/h1>\n<p>1MW ges projesi \u00e7er\u00e7evesinde toplamda 19 bin 500 m2&#8217;lik alana kurularak 4000 g\u00fcne\u015f panelinden meydana getirilen ve y\u0131ll\u0131k 1 milyon 300 bin kilovatsaat elektrik \u00fcretimi ger\u00e7ekle\u015ftiren GES santrali ile 8 ay i\u00e7inde 1 milyon 4 bin 800 kilovatsaat elektrik \u00fcretildi.<\/p>\n<p>G\u00fcne\u015f santralinden sa\u011flanan enerjinin y\u0131ll\u0131k 200.000 kilovatsaati Bolu Belediyesi Sar\u0131calar Temiz Su Ar\u0131tma Tesisi\u2019nin enerjisini kar\u015f\u0131larken kalan\u0131 ise Sakarya Elektrik Da\u011f\u0131t\u0131m A\u015e\u2019ye sat\u0131lmaktad\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Bolu Belediyesi, Nisan ay\u0131nda Sar\u0131calar \u0130\u00e7me Suyu Ar\u0131tma Tesisi arazisine kurulan 1 MW G\u00fcne\u015f Enerjisi Santrali (GES)\u2019nden kendi enerjisini \u00fcretiyor. 1MW ges [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":87210,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[36898,34979,19638,34980,26353,67,1009,35038,23416,35039,23133,34925,23131,21115,46213],"views":1459,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/87208"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=87208"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/87208\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/87210"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=87208"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=87208"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=87208"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}