{"id":87124,"date":"2019-02-09T17:00:04","date_gmt":"2019-02-09T14:00:04","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=87124"},"modified":"2019-02-09T17:03:14","modified_gmt":"2019-02-09T14:03:14","slug":"akkuyu-ngsnin-ilk-reaktorunde-atommash-imzasi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngsnin-ilk-reaktorunde-atommash-imzasi\/","title":{"rendered":"(Turkish) Akkuyu NGS\u2019nin \u0130lk Reakt\u00f6r\u00fc&#8217;nde &#8216;Atommash&#8217; \u0130mzas\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/87124\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Rusya Devlet Atom Enerjisi Kurumu ROSATOM taraf\u0131ndan Mersin\u2019de in\u015fas\u0131 devam eden T\u00fcrkiye\u2019nin ilk n\u00fckleer enerji santrali Akkuyu NGS&#8217;nin ekipman \u00fcretimi i\u00e7in de \u00e7al\u0131\u015fmalar t\u00fcm h\u0131z\u0131yla devam ediyor. Akkuyu NGS\u2019nin birinci \u00fcnitesinin reakt\u00f6r bas\u0131n\u00e7 tank\u0131n\u0131n taban\u0131 ROSATOM\u2019un makine yap\u0131m\u0131 b\u00f6l\u00fcm\u00fc Atomenergomash\u2019\u0131n b\u00fcnyesindeki AEM Teknoloji A.\u015e.\u2019nin Rusya\u2019n\u0131n Volgodonsk \u015fehrindeki \u015fubesi Atommash taraf\u0131ndan \u00fcretildi.<\/h1>\n<p>S\u00f6z konusu i\u015flem, Atommash\u2019te iki a\u015famada ger\u00e7ekle\u015ftirildi. \u0130lk \u00f6nce, boru \u015feklinde bir d\u00f6vme \u00e7elik kesilerek, f\u0131r\u0131nda \u0131s\u0131t\u0131ld\u0131. Ard\u0131ndan bir metal levha elde etmek i\u00e7in preslenerek a\u00e7\u0131ld\u0131. Bir sonraki a\u015famada ise; taban \u015fekillendirildi ve 64 ton a\u011f\u0131rl\u0131\u011f\u0131nda, 5 bin 850 mm \u00e7ap\u0131nda ve 300 mm kal\u0131nl\u0131\u011f\u0131nda olan ham ocakta, maksimum 1040 derecelik s\u0131cakl\u0131kta iki a\u015famal\u0131 \u0131s\u0131tma uyguland\u0131. Arkas\u0131ndan tabaka <img loading=\"lazy\" class=\"alignright size-medium wp-image-87126\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/akkuyu-ngsnin-ilk-reaktorunde-atommash-imzasi1-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/akkuyu-ngsnin-ilk-reaktorunde-atommash-imzasi1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/akkuyu-ngsnin-ilk-reaktorunde-atommash-imzasi1-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/akkuyu-ngsnin-ilk-reaktorunde-atommash-imzasi1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/akkuyu-ngsnin-ilk-reaktorunde-atommash-imzasi1-450x300.jpg 450w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/akkuyu-ngsnin-ilk-reaktorunde-atommash-imzasi1.jpg 732w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>kal\u0131ba yerle\u015ftirildi ve taban, 12 bin ton\/kuvvetlik bir bask\u0131 g\u00fcc\u00fcyle preslendi.<\/p>\n<p>Metalin art\u0131k gerilmelerini gidermek amac\u0131yla, tamamlanm\u0131\u015f taban tekrar \u0131s\u0131l i\u015flem i\u00e7in f\u0131r\u0131na konuldu. Par\u00e7an\u0131n farkl\u0131 b\u00f6lgelerindeki s\u0131cakl\u0131k termokupllerle kontrol edildi. Is\u0131tma ve so\u011futma 600-900 derece s\u0131cakl\u0131k aral\u0131\u011f\u0131nda de\u011fi\u015firken bu i\u015flemler 6 g\u00fcn s\u00fcr\u00fcyor. Y\u00fczey so\u011fuduktan sonra, alt b\u00f6l\u00fcm gerekli inceleme i\u015flemlerinden ge\u00e7iyor.<\/p>\n<p>Atommash Direkt\u00f6r\u00fc Rovshan Abbasov, \u201cAtommash&#8217;ta bir reakt\u00f6r bas\u0131n\u00e7l\u0131 kap \u00fcretim d\u00f6ng\u00fcs\u00fc iki y\u0131ldan fazla s\u00fcr\u00fcyor. M\u00fc\u015fteri temsilcileri ile aktif bir i\u015fbirli\u011fi i\u00e7indeyiz. Yabanc\u0131 m\u00fc\u015fteri i\u00e7in ekipman \u00fcretirken, NGS ekipmanlar\u0131na y\u00f6nelik sadece Rus norm ve kurallar\u0131na de\u011fil, ayn\u0131 zamanda \u00fcr\u00fcnlerimizi tedarik etti\u011fimiz \u00fclkenin ulusal standartlar\u0131na da uymak zorunday\u0131z. Tesis, 2018 y\u0131l\u0131 Ekim ay\u0131nda Hint N\u00fckleer Santrali i\u00e7in buhar jenerat\u00f6r\u00fc seti \u00fcretip g\u00f6ndererek gerekli deneyimi kazand\u0131. \u015eu an i\u00e7in i\u015fletmenin ana i\u015f y\u00fck\u00fcn\u00fc ihracat sipari\u015fleri olu\u015fturuyor\u201d \u015feklinde konu\u015ftu.<\/p>\n<p>\u201cAEM Teknoloji\u201d, \u00fcretici olarak resmi onay belgesi alm\u0131\u015f NGS \u00fcreticilerinin ilkidir. TR-10-003 No&#8217;lu Sertifika 19 Eyl\u00fcl 2017 tarihinde T\u00fcrkiye Atom Enerjisi Kurumu taraf\u0131ndan verildi.<\/p>\n<p>2010 y\u0131l\u0131 May\u0131s ay\u0131nda Rusya Federasyonu ile T\u00fcrkiye Cumhuriyeti aras\u0131nda imzalanan H\u00fck\u00fcmetleraras\u0131 Anla\u015fma temelinde ger\u00e7ekle\u015ftirilen Akkuyu NGS projesi, T\u00fcrkiye&#8217;nin ilk n\u00fckleer g\u00fc\u00e7 santrali olan olma \u00f6zelli\u011fini ta\u015f\u0131yor. Akkuyu NGS\u2019nin VVER-1200 g\u00fc\u00e7 \u00fcniteleri; geli\u015fmi\u015f g\u00fcvenlik sistemlerine sahip en modern teknolojiler olan 3+ teknolojiye dayan\u0131yor. Akkuyu NGS&#8217;nin referans santrali ise ilk \u00fcnitesi 27 \u015eubat 2017&#8217;de ticari faaliyete ge\u00e7en Rusya\u2019n\u0131n Voronej B\u00f6lgesi\u2019ndeki Novovoronezh NPP-2 seri bir n\u00fckleer santral projesi. Akkuyu NGS, in\u015faat\u0131 tamamland\u0131\u011f\u0131nda ve 4 bin 800 MW kurulu g\u00fcce ula\u015f\u0131ld\u0131\u011f\u0131nda, y\u0131lda yakla\u015f\u0131k 35 milyar kWh elektrik \u00fcretecek. 20 y\u0131l daha uzatma olas\u0131l\u0131\u011f\u0131yla hizmet \u00f6mr\u00fc 60 y\u0131l olacak.<\/p>\n<p>Akkuyu NGS&#8217;nin \u00e7o\u011funluk hissedar\u0131n\u0131 Rusya Devlet Atom Enerjisi Kurumu ROSATOM olu\u015fturuyor. Proje, yap-i\u015flet-i\u015flet modelinde uygulan\u0131yor. Uzun vadeli bir anla\u015fma olan proje s\u00f6zle\u015fmesine g\u00f6re, projenin y\u00fcklenicisi olan Akkuyu N\u00fckleer, projenin tasar\u0131m, yap\u0131m, bak\u0131m, i\u015fletme ve i\u015fletmeden \u00e7\u0131karma rollerini \u00fcstleniyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rusya Devlet Atom Enerjisi Kurumu ROSATOM taraf\u0131ndan Mersin\u2019de in\u015fas\u0131 devam eden T\u00fcrkiye\u2019nin ilk n\u00fckleer enerji santrali Akkuyu NGS&#8217;nin ekipman \u00fcretimi i\u00e7in de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":87127,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[46141,46137,3019,13232,46136,46138,34979,19638,34980,26353,67,1009,1301,46140,36443,23134,25480,34931,34930,2587,46139,42759,46135],"views":957,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/87124"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=87124"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/87124\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/87127"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=87124"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=87124"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=87124"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}