{"id":8699,"date":"2013-03-23T15:22:49","date_gmt":"2013-03-23T12:22:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=8699"},"modified":"2013-03-23T15:23:15","modified_gmt":"2013-03-23T12:23:15","slug":"nukleer-egitime-basvuru-5-mayista-bitiyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/nukleer-egitime-basvuru-5-mayista-bitiyor\/","title":{"rendered":"(Turkish) \u2018N\u00fckleer E\u011fitime\u2019 Ba\u015fvuru 5 May\u0131s\u2019ta Bitiyor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/8699\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<div><strong>Mersin-Akkuyu\u2019da yap\u0131lmas\u0131 planlanan n\u00fckleer enerji santralinde g\u00f6rev almak \u00fczere Rusya\u2019ya e\u011fitime g\u00f6nderilecek 100 ki\u015finin aras\u0131na girmek isteyenler, 5 May\u0131s\u2019a kadar ba\u015fvuruda bulunabilecek.<\/strong><\/div>\n<div><\/div>\n<div>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019ndan yap\u0131lan yaz\u0131l\u0131 a\u00e7\u0131klamaya g\u00f6re, 2013-2014 e\u011fitim-\u00f6\u011fretim y\u0131l\u0131nda Moskova\u2019daki Ulusal N\u00fckleer Ara\u015ft\u0131rma \u00dcniversitesi Moskova Fizik M\u00fchendisli\u011fi Enstit\u00fcs\u00fc\u2019nde (MEPhI) 100 \u00f6\u011frencinin daha n\u00fckleer m\u00fchendislik e\u011fitimi g\u00f6rmesiyle ilgili s\u00fcre\u00e7 ba\u015flad\u0131.<\/div>\n<div>\n<p>Buna g\u00f6re, \u00fcniversitelerin fen-edebiyat ve m\u00fchendislik fak\u00fcltelerinin, fizik ve\/veya matematik derslerinin okutuldu\u011fu t\u00fcm <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/rusya-nukleer-egitim.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-8158\" title=\"rusya-nukleer-egitim\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/rusya-nukleer-egitim-300x211.jpg\" alt=\"\" width=\"300\" height=\"211\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/rusya-nukleer-egitim-300x211.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/rusya-nukleer-egitim-70x50.jpg 70w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/rusya-nukleer-egitim.jpg 500w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>b\u00f6l\u00fcmlerinin 1, 2, 3 ve 4. s\u0131n\u0131f\u0131nda okuyan \u00f6\u011frenciler aras\u0131ndan 100 \u00f6\u011frenci se\u00e7ilecek.\u00d6\u011frencilerin se\u00e7imi i\u00e7in yaz\u0131l\u0131 ve s\u00f6zl\u00fc s\u0131nav yap\u0131lacak. S\u0131navda ba\u015far\u0131l\u0131 olup e\u011fitim program\u0131na kat\u0131lmaya hak kazananlar, Rusya Federasyonu\u2019nda n\u00fckleer m\u00fchendislik alan\u0131nda bedelsiz e\u011fitim alacak.<\/p>\n<p>Ba\u015fvurular, 5 May\u0131s 2013\u2032e kadar <a href=\"http:\/\/www.akkunpp.com\" target=\"_blank\">http:\/\/www.akkunpp.com<\/a> internet adresinde yer alan form doldurularak yap\u0131lacak ve ba\u015fvuru i\u00e7in herhangi bir \u00fccret talep edilmeyecek. Ba\u015fvuru yapanlar aras\u0131ndan \u00fcniversiteye yerle\u015ftirilmeye esas giri\u015f puan\u0131 dikkate al\u0131narak belirlenecek 600 ki\u015fi, 12 May\u0131s\u2019ta yaz\u0131l\u0131 s\u0131nava girecek.Yaz\u0131l\u0131 s\u0131navda ilk 300\u2032e giren adaylar, s\u00f6zl\u00fc s\u0131nava \u00e7a\u011fr\u0131lacak.<\/p>\n<p>E\u011fitim program\u0131n\u0131 ba\u015far\u0131yla tamamlayan, mezuniyet sonras\u0131 uygulama e\u011fitimini ve staj\u0131n\u0131 bitiren \u00f6\u011frenciler, onaylanm\u0131\u015f kadro listesi do\u011frultusunda Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nde i\u015fe al\u0131nacak.<\/p>\n<p>N\u00fckleer santralde \u00e7al\u0131\u015fmaya ba\u015flad\u0131ktan sonra Akkuyu NGS E\u011fitim Merkezi\u2019nde e\u011fitimini ba\u015far\u0131yla tamamlayan, uzmanl\u0131k alan\u0131nda m\u00fchendislik pozisyonu i\u00e7in s\u0131nav\u0131 ge\u00e7en ve herhangi birinin g\u00f6zetimine ihtiya\u00e7 duymaks\u0131z\u0131n \u00e7al\u0131\u015fma yetkisini alanlara, Devlet Memurlar\u0131 Kanunu\u2019na tabi 1. derecedeki m\u00fchendislere verilen maa\u015ftan az olmayacak \u015fekilde \u00fccret \u00f6denecek.<\/p>\n<p>Bu d\u00f6nemde gidecek 100 \u00f6\u011frenci ile Rusya\u2019da e\u011fitim g\u00f6ren \u00f6\u011frenci say\u0131s\u0131 217\u2032ye \u00e7\u0131kacak. Toplamda 600 \u00f6\u011frenci bu e\u011fitimi g\u00f6r\u00fcp, Akkuyu\u2019daki n\u00fckleer santralde \u00e7al\u0131\u015fma imkan\u0131na kavu\u015fabilecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/03\/22\/nukleer-egitime-basvuru-5-mayista-bitiyor\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Mersin-Akkuyu\u2019da yap\u0131lmas\u0131 planlanan n\u00fckleer enerji santralinde g\u00f6rev almak \u00fczere Rusya\u2019ya e\u011fitime g\u00f6nderilecek 100 ki\u015finin aras\u0131na girmek isteyenler, 5 May\u0131s\u2019a kadar ba\u015fvuruda bulunabilecek. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":8158,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3787,1026,3788,67,3785,3783,3372,21,3789,3786,885,3784],"views":648,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/8699"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=8699"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/8699\/revisions"}],"predecessor-version":[{"id":8703,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/8699\/revisions\/8703"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/8158"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=8699"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=8699"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=8699"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}