{"id":86989,"date":"2019-02-07T17:12:46","date_gmt":"2019-02-07T14:12:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=86989"},"modified":"2019-02-07T17:15:57","modified_gmt":"2019-02-07T14:15:57","slug":"antalyanin-2nci-etap-3-mw-gucundeki-gunes-santrali-faaliyete-geciyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/antalyanin-2nci-etap-3-mw-gucundeki-gunes-santrali-faaliyete-geciyor\/","title":{"rendered":"(Turkish) Antalya\u2019n\u0131n 2\u2019nci Etap 3 MW G\u00fcc\u00fcndeki G\u00fcne\u015f Santrali Faaliyete Ge\u00e7iyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/86989\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Antalya B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan \u00e7ift\u00e7iye sulama suyunda enerji deste\u011fi verilmek \u00fczere D\u00f6\u015femealt\u0131\u2019nda yap\u0131m\u0131na ba\u015flan\u0131lan 2\u2019nci Etap G\u00fcne\u015f Enerji Santrali\u2019nin kurulumu tamamland\u0131. 11 bin 594 g\u00fcne\u015f panelinin yer ald\u0131\u011f\u0131 projeden 3 mw g\u00fcc\u00fcnde enerji elde edilecek.<\/h1>\n<p>Bat\u0131 Akdeniz Kalk\u0131nma Ajans\u0131 (BAKA) i\u015f birli\u011fiyle hayata ge\u00e7irilen 2\u2019nci Etap G\u00fcne\u015f Enerji Santrali\u2019nde <img loading=\"lazy\" class=\"alignleft size-medium wp-image-86991\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/antalyanin-2nci-etap-3-mw-gucundeki-gunes-santrali-faaliyete-geciyor-300x183.jpg\" alt=\"\" width=\"300\" height=\"183\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/antalyanin-2nci-etap-3-mw-gucundeki-gunes-santrali-faaliyete-geciyor-300x183.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/antalyanin-2nci-etap-3-mw-gucundeki-gunes-santrali-faaliyete-geciyor-500x305.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/antalyanin-2nci-etap-3-mw-gucundeki-gunes-santrali-faaliyete-geciyor-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/02\/antalyanin-2nci-etap-3-mw-gucundeki-gunes-santrali-faaliyete-geciyor.jpg 656w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>11 bin 594 adet g\u00fcne\u015f paneli kullan\u0131l\u0131rken santralin \u015eubat ay\u0131 i\u00e7inde faaliyete ge\u00e7mesi \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<h2>\u015eu Ana Kadar 7 Milyon 82 Bin Liral\u0131k Enerji Deste\u011fi Sa\u011fland\u0131<\/h2>\n<p>D\u00f6\u015femealt\u0131 \u0130l\u00e7esi Da\u011fbeli Mahallesi\u2019nde ilk etapta 30 bin 648 metrekarelik alana daha \u00f6nceden 2 mw kurulu g\u00fcce sahip g\u00fcne\u015f enerji santrali kurulmu\u015f olup santralden elde edilen enerji ile bug\u00fcne kadar 39 sulama kooperatifine kay\u0131tl\u0131 8 bin 164 \u00e7ift\u00e7i ailesine sulama suyunda 7 milyon 82 bin liral\u0131k enerji deste\u011fi sa\u011flanm\u0131\u015ft\u0131r. Tar\u0131msal \u00fcretimde en \u00f6nemli harcama kalemlerinden olan elektrik giderleri T\u00fcrkiye\u2019de ilk defa bir belediye taraf\u0131ndan bedelsiz olarak verilmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Antalya B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan \u00e7ift\u00e7iye sulama suyunda enerji deste\u011fi verilmek \u00fczere D\u00f6\u015femealt\u0131\u2019nda yap\u0131m\u0131na ba\u015flan\u0131lan 2\u2019nci Etap G\u00fcne\u015f Enerji Santrali\u2019nin kurulumu tamamland\u0131. 11 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":86991,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[46017,5201,7939,18601,18602,46015,37738,36723,67,1009,35038,6014,46016,23416,23133,8071,34925,23131,33897,46019,46018,46020],"views":989,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/86989"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=86989"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/86989\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/86991"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=86989"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=86989"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=86989"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}