{"id":8689,"date":"2013-03-23T15:03:38","date_gmt":"2013-03-23T12:03:38","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=8689"},"modified":"2013-03-23T15:03:54","modified_gmt":"2013-03-23T12:03:54","slug":"abden-ermenistana-nukleer-santral-uyarisi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/abden-ermenistana-nukleer-santral-uyarisi\/","title":{"rendered":"(Turkish) AB\u2019den Ermenistan\u2019a N\u00fckleer Santral Uyar\u0131s\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/8689\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<div>\n<div>\n<div>\n<div>\n<div id=\"post-43961\">\n<h2>Avrupa Birli\u011fi (AB), Ermenistan\u2019dan Metsamor n\u00fckleer santralinin faaliyetini durdurmas\u0131n\u0131 istedi.<\/h2>\n<div>\n<div>\n<p><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/metsamor-nukleer-santrali.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-8690\" title=\"metsamor-nukleer-santrali\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/metsamor-nukleer-santrali-300x188.jpg\" alt=\"\" width=\"300\" height=\"188\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/metsamor-nukleer-santrali-300x188.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/metsamor-nukleer-santrali-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/metsamor-nukleer-santrali.jpg 478w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>AB\u2019nin Ermenistan Ofisi M\u00fcd\u00fcr\u00fc Traian Hristea, d\u00fczenledi\u011fi bas\u0131n toplant\u0131s\u0131nda, \u201cAvrupa Kom\u015fuluk Politikas\u0131\u201d Ermenistan Raporu\u2019nu kamuoyu ile payla\u015ft\u0131. Hristea, Metsamor santralinin, Ermenistan-AB ili\u015fkilerinin g\u00fcndemindeki en \u00f6nemli konulardan biri oldu\u011funu belirtti.<\/p>\n<p>Santralin hala faaliyetini devam ettirmesinden rahats\u0131zl\u0131k duyduklar\u0131n\u0131 ifade eden Hristea, \u201cSantralin faaliyetinin durdurulmas\u0131na y\u00f6nelik k\u0131sa zamanda bir program haz\u0131rlanmas\u0131 i\u00e7in Ermenistan h\u00fck\u00fcmetine ba\u015fvuruda bulunduk. Santralin faaliyeti sona erdikten sonra, Ermenistan\u2019\u0131n enerji g\u00fcvenli\u011fini temin etmek i\u00e7in Ermenistan h\u00fck\u00fcmeti ile alternatif kararlar\u0131 m\u00fczakere etmeye haz\u0131r\u0131z\u201d diye konu\u015ftu.<\/p>\n<h2>Metsamor N\u00fckleer Santrali<\/h2>\n<p>1970\u2032li y\u0131llarda in\u015fa edilen santral, Ermenistan\u2019\u0131n ba\u015fkenti Erivan\u2019a 32 km, Kars\u2019a 100 km, I\u011fd\u0131r\u2019a ise 30 km uzakl\u0131kta bulunuyor.<\/p>\n<p>Sovyet n\u00fckleer santral teknolojilerinin en eskileriyle in\u015fa edilen ve teknik olanaklar\u0131 yetersiz olan santral, birinci derece deprem b\u00f6lgesinde bulundu\u011fu i\u00e7in hem Ermenistan hem T\u00fcrkiye hem de di\u011fer kom\u015fu \u00fclkeler i\u00e7in tehlike olu\u015fturuyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/03\/22\/abden-ermenistana-nukleer-santral-uyarisi\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Avrupa Birli\u011fi (AB), Ermenistan\u2019dan Metsamor n\u00fckleer santralinin faaliyetini durdurmas\u0131n\u0131 istedi. AB\u2019nin Ermenistan Ofisi M\u00fcd\u00fcr\u00fc Traian Hristea, d\u00fczenledi\u011fi bas\u0131n toplant\u0131s\u0131nda, \u201cAvrupa Kom\u015fuluk Politikas\u0131\u201d [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":8690,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[1192,3773,67,3772,880,21,88,3774],"views":1350,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/8689"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=8689"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/8689\/revisions"}],"predecessor-version":[{"id":8692,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/8689\/revisions\/8692"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/8690"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=8689"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=8689"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=8689"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}