{"id":8671,"date":"2013-03-22T17:02:45","date_gmt":"2013-03-22T14:02:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=8671"},"modified":"2013-03-22T17:13:16","modified_gmt":"2013-03-22T14:13:16","slug":"rusya-akkuyuda-en-uygun-sartlari-onerdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/rusya-akkuyuda-en-uygun-sartlari-onerdi\/","title":{"rendered":"(Turkish) Rusya Akkuyu\u2019da En Uygun \u015eartlar\u0131 \u00d6nerdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/8671\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye Enerji ve Tabii Kaynaklar Bakan\u0131 Taner Y\u0131ld\u0131z, T\u00fcrkiye\u2019nin Japonya, \u00c7in ve G\u00fcney Kore ile Sinop\u2019ta n\u00fckleer enerji santrali in\u015faat\u0131 konusunu g\u00f6r\u00fc\u015ft\u00fc\u011f\u00fcn\u00fc s\u00f6yledi.Ge\u00e7ti\u011fimiz y\u0131l sonunda Rusya ve T\u00fcrkiye enerji bakanlar\u0131 Aleksandr Novak ve Taner Y\u0131ld\u0131z aras\u0131nda yap\u0131lan g\u00f6r\u00fc\u015fmelerde Rus taraf\u0131 Sinop\u2019un yak\u0131n\u0131nda bulunacak olan n\u00fckleer enerji santrali in\u015faat\u0131na kat\u0131lmaya haz\u0131r oldu\u011funu a\u00e7\u0131klam\u0131\u015ft\u0131.<\/strong><\/p>\n<p>O d\u00f6nemde T\u00fcrk bakan Ankara\u2019n\u0131n \u00f6ncelikle \u015fu anda mevcut olan Kanada, Japonya, G\u00fcney Kore ve \u00c7in tekliflerini ele alaca\u011f\u0131 cevab\u0131n\u0131 vermi\u015f idi. Bakan \u015f\u00f6yle konu\u015fmu\u015ftu: \u201cHer\u015feyden \u00f6nce verilmi\u015f olan d\u00f6rt teklifi de\u011ferlendirece\u011fiz ve bundan sonra a\u00e7\u0131klama yapaca\u011f\u0131z. Y\u0131l sonunda kadar g\u00f6r\u00fc\u015fmelerin tamamlanaca\u011f\u0131na eminim.\u201d Ancak g\u00f6rd\u00fc\u011f\u00fcm\u00fcz gibi g\u00f6r\u00fc\u015fmeler tamamlanmad\u0131, Kanada ihaleye kat\u0131lmaktan vazge\u00e7ti. Neden? Bu soruyu politika uzman\u0131 Stanislav Tarasov\u2019a y\u00f6nelttik.<\/p>\n<p>Baz\u0131 verilere g\u00f6re bu g\u00f6r\u00fc\u015fmelerdeki zorluklar T\u00fcrkiye\u2019nin yeni partnerlerinin Akkuyu N\u00fckleer Enerji Santrali in\u015faat\u0131 projesinin g\u00f6r\u00fc\u015f\u00fclmesi i\u00e7in teklif etti\u011fi \u015fartlar\u0131 teklif edememelerinden kaynaklan\u0131yor. D\u00fcnya gazetesi sayfalar\u0131nda Mersin\u2019de bulunan Enformasyon <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/Akkuyu_n\u00fckleer-santrali-505x313.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-8672\" title=\"Akkuyu_n\u00fckleer-santrali-505x313\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/Akkuyu_n\u00fckleer-santrali-505x313-300x185.jpg\" alt=\"\" width=\"300\" height=\"185\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/Akkuyu_n\u00fckleer-santrali-505x313-300x185.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/Akkuyu_n\u00fckleer-santrali-505x313-500x309.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/Akkuyu_n\u00fckleer-santrali-505x313-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/Akkuyu_n\u00fckleer-santrali-505x313.jpg 505w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Merkezi Ba\u015fkan\u0131 Faruk Uzel\u2019in g\u00f6r\u00fc\u015flerine yer veriyor. Uzel\u2019in s\u00f6zlerine g\u00f6re T\u00fcrkiye\u2019nin ilk n\u00fckleer enerji santrali T\u00fcrk taraf\u0131 i\u00e7in belli avantajlar sa\u011fl\u0131yor: Rus taraf\u0131ndan sa\u011flanan 20 milyar dolara yak\u0131n b\u00fcy\u00fck yat\u0131r\u0131m, T\u00fcrkiye devlet b\u00fct\u00e7esinden masraf yap\u0131lmayacak olmas\u0131, T\u00fcrk \u00f6\u011frencilerin n\u00fckleer m\u00fchendislik alan\u0131nda Rusya\u2019da e\u011fitim almalar\u0131 bunlar aras\u0131nda. T\u00fcrkiye\u2019de esasen n\u00fckleer enerji ad\u0131nda yeni bir ekonomi sekt\u00f6r\u00fc kurulmaktad\u0131r.<\/p>\n<p>Ruslar\u0131n bir atas\u00f6z\u00fc vard\u0131r: <strong>\u0130\u015ftah yemek yerken a\u00e7\u0131l\u0131r.<\/strong> \u015eimdi \u2018N\u00fckleer enerji santraline ihtiya\u00e7 var m\u0131? sorusu art\u0131k T\u00fcrkiye\u2019de akt\u00fcellei\u011fini kaybetti. Marshall Fonu taraf\u0131ndan d\u00fczenlenen Br\u00fcksel forumunda konu\u015fan Uluslararas\u0131 Enerji Ajans\u0131 (Paris, Fransa) ba\u015f ekonomisti Fatih Birol yapt\u0131\u011f\u0131 a\u00e7\u0131klamada: \u201cT\u00fcrkiye\u2019de ne kadar \u00e7ok n\u00fckleer enerji santrali in\u015fa edilirse o kadar iyidir.\u201d dedi.<\/p>\n<p>Bunun \u00e7ok nedeni var. Her \u015feyden \u00f6nce T\u00fcrkiye\u2019nin geli\u015fmekte olan ekonomisi ucuz enerjiye ihtiya\u00e7 duymaktad\u0131r. Birol T\u00fcrkiye\u2019nin mevcut \u00e7al\u0131\u015fmalardaki a\u00e7\u0131\u011f\u0131n\u0131n \u00e7o\u011funlukla enerji kaynaklar\u0131 ithalinden kaynakland\u0131\u011f\u0131n\u0131 s\u00f6yledi.<\/p>\n<p>Bunun \u00fczerine \u00f6n\u00fcn\u00fcm\u00fczdeki g\u00fcnlerde tahmin edilen petrol, do\u011fal gaz ve k\u00f6m\u00fcr fiyatlar\u0131n\u0131n art\u0131\u015f\u0131 d\u0131\u015f ticaret dengesinde olumsuz yans\u0131malara neden olacakt\u0131r. Ajans\u0131n ba\u015f ekonomisti etkili tedbir olarak n\u00fckleer enerjiyi \u00fclkenin a\u011f\u0131rl\u0131kl\u0131 sekt\u00f6r\u00fc haline mutlaka getirmek gerekir g\u00f6r\u00fc\u015f\u00fcn\u00fc savunuyor. Birol\u2019un g\u00f6r\u00fc\u015f\u00fcne g\u00f6re ancak bu \u015fekilde gelecekte enerji ba\u011f\u0131ms\u0131zl\u0131\u011f\u0131 sa\u011flanabilir.<\/p>\n<p>\u015eimdilik Devlet \u015eirketi Rosatom\u2019a ba\u011fl\u0131 ZAO Atomstroyeksport T\u00fcrkiye \u015fubesi ve T\u00fcrk \u00d6ZDO\u011eU In\u015faat ve Ticaret Ltd. \u015eti. Aras\u0131nda Akkuyu N\u00fckleer Santrali in\u015faat-montaj i\u015fleri ile ilgili ilk kontrat imzaland\u0131. Akkuyu NGS A.\u015e. Genel M\u00fcd\u00fcr\u00fc Aleksandr Superfin\u2019in bildirdi\u011fi \u00fczere T\u00fcrk Akkuyu N\u00fckleer Enerji santrali in\u015faat\u0131 2014 y\u0131l\u0131n\u0131n ilk aylar\u0131nda ba\u015flayacak. May\u0131s ay\u0131nda n\u00fckleer enerji santrali ile ilgili ekoloji raporu a\u00e7\u0131klanacak. Akkuyu N\u00fckleer Enerji Santrali\u2019nde elektrik \u00fcretimine ise 2020 y\u0131l\u0131ndan sonra ba\u015flanacak. N\u00fckleer Enerji Santrali\u2019nin \u00fcretim kapasitesi 4,8 GWt.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/03\/22\/rusya-akkuyuda-en-uygun-sartlari-onerdi\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye Enerji ve Tabii Kaynaklar Bakan\u0131 Taner Y\u0131ld\u0131z, T\u00fcrkiye\u2019nin Japonya, \u00c7in ve G\u00fcney Kore ile Sinop\u2019ta n\u00fckleer enerji santrali in\u015faat\u0131 konusunu g\u00f6r\u00fc\u015ft\u00fc\u011f\u00fcn\u00fc s\u00f6yledi.Ge\u00e7ti\u011fimiz [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":8672,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3768,67,21,3767,88],"views":685,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/8671"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=8671"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/8671\/revisions"}],"predecessor-version":[{"id":8674,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/8671\/revisions\/8674"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/8672"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=8671"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=8671"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=8671"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}