{"id":86050,"date":"2019-01-24T17:46:08","date_gmt":"2019-01-24T14:46:08","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=86050"},"modified":"2019-01-24T17:47:45","modified_gmt":"2019-01-24T14:47:45","slug":"asunim-turkiyeden-pms-aluminyumun-fabrika-cati-gesi-icin-anlasma","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/asunim-turkiyeden-pms-aluminyumun-fabrika-cati-gesi-icin-anlasma\/","title":{"rendered":"(Turkish) Asunim T\u00fcrkiye&#8217;den PMS Al\u00fcminyum\u2019un Fabrika \u00c7at\u0131 GES&#8217;i \u0130\u00e7in Anla\u015fma"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/86050\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>G\u00fcne\u015f sekt\u00f6r\u00fcn\u00fcn \u00f6nc\u00fc firmalar\u0131ndan oldu\u011funu kan\u0131tlayan Asunim taraf\u0131ndan PMS Al\u00fcminyum\u2019un Bursa\u2019da yer alan fabrika \u00e7at\u0131s\u0131na kurulacak GES sistemine y\u00f6nelik 900 kWp\u2019lik s\u00f6zle\u015fmesi imzaland\u0131.<img loading=\"lazy\" class=\"alignright size-medium wp-image-86052\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/asunim-turkiyeden-pms-aluminyumun-fabrika-cati-gesi-icin-anlasma-300x183.jpg\" alt=\"\" width=\"300\" height=\"183\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/asunim-turkiyeden-pms-aluminyumun-fabrika-cati-gesi-icin-anlasma-300x183.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/asunim-turkiyeden-pms-aluminyumun-fabrika-cati-gesi-icin-anlasma-500x305.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/asunim-turkiyeden-pms-aluminyumun-fabrika-cati-gesi-icin-anlasma-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/asunim-turkiyeden-pms-aluminyumun-fabrika-cati-gesi-icin-anlasma.jpg 656w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/h1>\n<p>Asunim Genel M\u00fcd\u00fcr\u00fc Umut G\u00fcrb\u00fcz yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, &#8220;T\u00fcrkiye&#8217;de \u00e7at\u0131 \u00fcst\u00fc GES projelerinde lider olduklar\u0131n\u0131 t\u00fcm projelerimizde oldu\u011fu gibi bu projeyi de, piyasadaki en kaliteli \u00fcr\u00fcnlerle, en iyi m\u00fchendislik ve bak\u0131m hizmetlerini sunarak AB standartlar\u0131na uygun bir \u015fekilde projeyi nihayete erdirece\u011fiz&#8221; ifadeleri kullan\u0131ld\u0131.<\/p>\n<p>Kurulumunun 60 g\u00fcn gibi bir zamanda tamamlanmas\u0131 \u00f6ng\u00f6r\u00fclen projenin, bak\u0131m onar\u0131m faaliyetleri ise Asunim\u2019in i\u015ftiraki, GES\u2019lerin bak\u0131m onar\u0131m\u0131 alan\u0131nda lider; ba\u011f\u0131ms\u0131z bir bak\u0131m onar\u0131m \u015firketi Maxima Enerji taraf\u0131ndan sa\u011flanacakt\u0131r.<\/p>\n<p>Asunim&#8217;in 850 MW\u2019\u0131n \u00fczerinde uluslararas\u0131 tecr\u00fcbesi ile T\u00fcrkiye \u00e7ap\u0131nda 185 MW\u2019\u0131 a\u015fm\u0131\u015f olan referans\u0131 mevcuttur.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. G\u00fcne\u015f sekt\u00f6r\u00fcn\u00fcn \u00f6nc\u00fc firmalar\u0131ndan oldu\u011funu kan\u0131tlayan Asunim taraf\u0131ndan PMS Al\u00fcminyum\u2019un Bursa\u2019da yer alan fabrika \u00e7at\u0131s\u0131na kurulacak GES sistemine y\u00f6nelik 900 kWp\u2019lik s\u00f6zle\u015fmesi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":86052,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[6743,24218,37412,26659,67,1009,34485,21886,20026,23416,23133,34925,23131,36099,45207,45206,8494],"views":1225,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/86050"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=86050"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/86050\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/86052"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=86050"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=86050"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=86050"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}