{"id":86042,"date":"2019-01-24T16:18:31","date_gmt":"2019-01-24T13:18:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=86042"},"modified":"2019-01-24T16:19:53","modified_gmt":"2019-01-24T13:19:53","slug":"kalyon-ile-guney-koreli-ortagi-hanwha-yollari-ayiriyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kalyon-ile-guney-koreli-ortagi-hanwha-yollari-ayiriyor\/","title":{"rendered":"(Turkish) Kalyon \u0130le G\u00fcney Koreli Orta\u011f\u0131 Hanwha Yollar\u0131 Ay\u0131r\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/86042\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Konya-Karap\u0131nar Enerji \u0130htisas End\u00fcstri B\u00f6lgesi\u2019nde yer alan ve 1000 mw kapasite tahsisi olan Karap\u0131nar Yenilenebilir Enerji Kaynak Alan\u0131 YEKA-1 GES ihalesi 2017 y\u0131l\u0131nda yap\u0131l\u0131rken ihaleyi, Kalyoncu- Hanwha Grubu 6.99 dolar cent\/kilovatsaat<\/h1>\n<h1><img loading=\"lazy\" class=\"alignright size-medium wp-image-86044\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/kalyon-ile-guney-koreli-ortagi-hanwha-yollari-ayiriyor-300x199.jpg\" alt=\"\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/kalyon-ile-guney-koreli-ortagi-hanwha-yollari-ayiriyor-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/kalyon-ile-guney-koreli-ortagi-hanwha-yollari-ayiriyor-768x510.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/kalyon-ile-guney-koreli-ortagi-hanwha-yollari-ayiriyor-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/kalyon-ile-guney-koreli-ortagi-hanwha-yollari-ayiriyor-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/kalyon-ile-guney-koreli-ortagi-hanwha-yollari-ayiriyor-450x300.jpg 450w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/kalyon-ile-guney-koreli-ortagi-hanwha-yollari-ayiriyor.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/h1>\n<h1>teklif vererek kazanm\u0131\u015ft\u0131.<\/h1>\n<p>Proje \u00e7er\u00e7evesinde kurulmu\u015f olan ortakl\u0131k, T\u00fcrkiye\u2019de y\u0131lda minimum 500 mw fotovoltaik mod\u00fcl \u00fcretim kapasitesine sahip g\u00fcne\u015f paneli fabrikas\u0131 kurulumu ger\u00e7ekle\u015ftirip bunu 2 y\u0131l i\u00e7inde Ankara\u2019da kurmay\u0131 planlamaktayd\u0131. 10 y\u0131l s\u00fcresince Konya-Karap\u0131nar YEKA\u2019da 1000 mw ba\u011flant\u0131 kapasitesi tahsisinin yap\u0131lmas\u0131na y\u00f6nelik bir kararda al\u0131nm\u0131\u015ft\u0131.<\/p>\n<p>Fakat proje kapsam\u0131nda planlanan \u015fekilde y\u00fcr\u00fcmedi. Kalyon ve Hanwha, yollar\u0131n\u0131 ay\u0131rmaya karar verirken taraflarca bu konuda g\u00f6r\u00fc\u015fmelere ba\u015fland\u0131. Kalyon\u2019un, ba\u015fka bir yabanc\u0131 ortakla projeyi ger\u00e7ekle\u015ftirmeye y\u00f6nelik giri\u015fimlerde bulunabilece\u011fi de ifade edilmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Konya-Karap\u0131nar Enerji \u0130htisas End\u00fcstri B\u00f6lgesi\u2019nde yer alan ve 1000 mw kapasite tahsisi olan Karap\u0131nar Yenilenebilir Enerji Kaynak Alan\u0131 YEKA-1 GES ihalesi 2017 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":86044,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[67,1009,45198,35038,23416,35039,23133,8256,34925,35037,23131,7601,34842,45197,25577,45195,45196],"views":1120,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/86042"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=86042"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/86042\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/86044"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=86042"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=86042"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=86042"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}