{"id":85903,"date":"2019-01-21T23:53:59","date_gmt":"2019-01-21T20:53:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=85903"},"modified":"2019-01-21T23:55:00","modified_gmt":"2019-01-21T20:55:00","slug":"ruzgar-enerjisi-2-13-cent-kwh-ile-yeni-bir-rekora-imza-atti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ruzgar-enerjisi-2-13-cent-kwh-ile-yeni-bir-rekora-imza-atti\/","title":{"rendered":"(Turkish) R\u00fczgar Enerjisi 2.13 cent\/kWh \u0130le Yeni Bir Rekora \u0130mza Att\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/85903\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Suudi Arabistan\u2019da 400 MW\u2019l\u0131k r\u00fczgar ihalesi yap\u0131ld\u0131. 400 MW kurulu g\u00fcce sahip olan 500 milyon dolarl\u0131k bu proje, Orta Do\u011fu\u2019nun en b\u00fcy\u00fck, Suudi Arabistan\u2019\u0131n ise ilk r\u00fczgar santrali olacak. 20 y\u0131ll\u0131k sat\u0131n <img loading=\"lazy\" class=\"alignleft size-medium wp-image-85905\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/ruzgar-enerjisi-2-13-cent-kwh-ile-yeni-bir-rekora-imza-atti-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/ruzgar-enerjisi-2-13-cent-kwh-ile-yeni-bir-rekora-imza-atti-300x150.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/ruzgar-enerjisi-2-13-cent-kwh-ile-yeni-bir-rekora-imza-atti-500x251.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/ruzgar-enerjisi-2-13-cent-kwh-ile-yeni-bir-rekora-imza-atti-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/ruzgar-enerjisi-2-13-cent-kwh-ile-yeni-bir-rekora-imza-atti.jpg 658w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>alma garantisine sahip projeyi 2.13 cent\/kWh ile Masdar ve EDF Konsorsiyumu kazand\u0131.<\/h1>\n<p>B\u00f6lgenin yenilenebilir enerji yat\u0131r\u0131m planlar\u0131 \u00e7er\u00e7evesinde 2020\u2019lerin ba\u015f\u0131nda yenilenebilir enerji kaynakl\u0131 7 GW g\u00fcc\u00fcnde ilave kapasite devreye girecektir.<\/p>\n<p>2030 y\u0131l\u0131 hedeflerine ula\u015f\u0131lmas\u0131, elektrik sekt\u00f6r\u00fcnde 354 milyon varil e\u015fde\u011fer petrolden fazla tasarruf sa\u011flayacak olup 220.000\u2019den fazla yeni istihdam yarat\u0131lmas\u0131 da dahil olmak \u00fczere \u00f6nemli ekonomik faydalar\u0131 olacakt\u0131r.<\/p>\n<p><a href=\"https:\/\/www.forbes.com\/sites\/feliciajackson\/2019\/01\/15\/wind-power-breaks-new-record-at-0-02-per-kwhr\/#406e6435272d\">Forbes<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Suudi Arabistan\u2019da 400 MW\u2019l\u0131k r\u00fczgar ihalesi yap\u0131ld\u0131. 400 MW kurulu g\u00fcce sahip olan 500 milyon dolarl\u0131k bu proje, Orta Do\u011fu\u2019nun en b\u00fcy\u00fck, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":85905,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[3701,67,1009,2690,3651,35002,45082,24949,23318,34744,34961,34960,1463,34977,26829,358],"views":1087,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/85903"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=85903"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/85903\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/85905"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=85903"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=85903"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=85903"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}