{"id":85513,"date":"2019-01-15T16:32:29","date_gmt":"2019-01-15T13:32:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=85513"},"modified":"2019-01-15T16:46:35","modified_gmt":"2019-01-15T13:46:35","slug":"turkiye-gunes-enerjisi-sektorunde-emin-fakat-kucuk-adimlarla-ilerlemeli","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-gunes-enerjisi-sektorunde-emin-fakat-kucuk-adimlarla-ilerlemeli\/","title":{"rendered":"(Turkish) T\u00fcrkiye, G\u00fcne\u015f Enerjisi Sekt\u00f6r\u00fc&#8217;nde Emin Fakat K\u00fc\u00e7\u00fck Ad\u0131mlarla \u0130lerlemeli&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/85513\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>G\u00fcne\u015f enerjisine y\u00f6nelik yenilenebilir enerji ihalelerinden yakla\u015f\u0131k 1 milyar dolar yat\u0131r\u0131m bedeli olan YEKA-2 GES iptal edilirken yetkililerce daha k\u00fc\u00e7\u00fck kapasitelere sahip enerji santrallarinin kurulmas\u0131na y\u00f6nelik ad\u0131mlar at\u0131lmas\u0131n\u0131n zorunlu oldu\u011fu ve yeni ihalelerin de bu y\u00f6nde olaca\u011f\u0131 belirtilmektedir.<\/h1>\n<p>Ge\u00e7ti\u011fimiz d\u00f6nemler i\u00e7inde finansmana eri\u015fimin zorla\u015fmas\u0131yla ihaleye girme plan\u0131 olan firmalar\u0131n\u00a0<img loading=\"lazy\" class=\"alignright size-medium wp-image-85515\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/turkiye-gunes-enerjisi-sektorunde-emin-fakat-kucuk-adimlarla-ilerlemeli-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/turkiye-gunes-enerjisi-sektorunde-emin-fakat-kucuk-adimlarla-ilerlemeli-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/turkiye-gunes-enerjisi-sektorunde-emin-fakat-kucuk-adimlarla-ilerlemeli-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/turkiye-gunes-enerjisi-sektorunde-emin-fakat-kucuk-adimlarla-ilerlemeli-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/turkiye-gunes-enerjisi-sektorunde-emin-fakat-kucuk-adimlarla-ilerlemeli-450x300.jpg 450w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/turkiye-gunes-enerjisi-sektorunde-emin-fakat-kucuk-adimlarla-ilerlemeli.jpg 732w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>planlar\u0131nda de\u011fi\u015fiklik yapt\u0131\u011f\u0131 ve g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcnde durgunluk ya\u015fand\u0131\u011f\u0131 ifade edilirken G\u00fcne\u015f Enerjisi Yat\u0131r\u0131mc\u0131lar\u0131 Derne\u011fi (G\u00dcYAD) Ba\u015fkan\u0131 Cem \u00d6zk\u00f6k ise &#8220;B\u00fcy\u00fck \u00e7apl\u0131 yat\u0131r\u0131m gerektiren bir model yerine b\u00f6lgesel bazda yay\u0131lm\u0131\u015f ve yat\u0131r\u0131m yapan\u0131n % 100 \u00f6z sermayesini ortaya koyabilece\u011fi k\u00fc\u00e7\u00fck \u00e7apl\u0131 santrallere y\u00f6nelik \u00e7al\u0131\u015fmalar\u0131n yap\u0131lmas\u0131 gerekti\u011fini ifade etmi\u015ftik. Bu y\u00f6nde yat\u0131r\u0131mc\u0131 taraf\u0131nda ciddi bir talep mevcuttur. \u015eimdi il ve il\u00e7e baz\u0131nda daha k\u00fc\u00e7\u00fck yat\u0131r\u0131mlar gerektiren yeni bir modelle ihaleye \u00e7\u0131k\u0131lmas\u0131 g\u00fcndemdedir. G\u00fcne\u015f Santralleri \u00e7e\u015fitli b\u00f6lgelere yay\u0131lm\u0131\u015f 10-20 mw&#8217;l\u0131k b\u00f6l\u00fcmlerden olu\u015facakt\u0131r.&#8221; ifadelerine yer verdi.<\/p>\n<p><strong>\u0130LK YEKA KAPSAMINDA 1.3 M\u0130LYAR DOLARLIK YATIRIM YAPILDI<\/strong><\/p>\n<p>Mart 2017 tarihinde Konya Karap\u0131nar\u2019da 1.000 mw kurulu g\u00fcce sahip olan YEKA-1 g\u00fcne\u015f enerjisi santrali ihalesi yap\u0131l\u0131rken en iyi teklif 0.0699 USD\/kWh ile Kalyon ile G\u00fcney Koreli orta\u011f\u0131 Hanwha taraf\u0131ndan verilmi\u015fti. Kalyon Enerji ve Hanwha Q CELLS konsorsiyumu projeyi hayata ge\u00e7irmeye y\u00f6nelik 1.3 milyar dolar seviyesinde bir yat\u0131r\u0131m ger\u00e7ekle\u015ftirecektir.<\/p>\n<p>Sarp ALTINEL &#8211; <a href=\"mailto:sarp.altinel@enerjigazetesi.ist\" target=\"_blank\" rel=\"noopener\">sarp.altinel@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. G\u00fcne\u015f enerjisine y\u00f6nelik yenilenebilir enerji ihalelerinden yakla\u015f\u0131k 1 milyar dolar yat\u0131r\u0131m bedeli olan YEKA-2 GES iptal edilirken yetkililerce daha k\u00fc\u00e7\u00fck kapasitelere sahip [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":85515,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[44797,67,1009,3135,2326,29013,23416,44800,1876,32191,44798,34925,17513,26729,23131,32192,19231,34920,34977,33219,44799,39410,44803,44801,26829,44802],"views":1279,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/85513"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=85513"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/85513\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/85515"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=85513"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=85513"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=85513"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}