{"id":85008,"date":"2019-01-08T12:56:24","date_gmt":"2019-01-08T09:56:24","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=85008"},"modified":"2019-01-08T13:28:43","modified_gmt":"2019-01-08T10:28:43","slug":"japon-panasonic-ortakliginin-cati-tipi-gunes-santralinin-ilk-fazi-devrede","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/japon-panasonic-ortakliginin-cati-tipi-gunes-santralinin-ilk-fazi-devrede\/","title":{"rendered":"The First Phase of the Japanese Panasonic Partnership&#8217;s Roof Type Solar"},"content":{"rendered":"<p><\/p>\n<h1>The first phase of the solar power plant (GES) established on the roof of the renewable energy cooperative in Kayseri was commissioned by Panasonic and Sefero\u011flu Elektrik, a leading technology company in Japan.<\/h1>\n<p>Using the developed HIT solar panel, Kayseri Furnishers Renewable Energy Cooperative GES has a total investment of 7.2 million dollars. When the first multi-partner GES project investment with 743 SME <img loading=\"lazy\" class=\"alignright size-medium wp-image-85010\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/japon-panasonic-ortakliginin-cati-tipi-gunes-santralinin-ilk-fazi-devrede-300x187.jpg\" alt=\"\" width=\"300\" height=\"187\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/japon-panasonic-ortakliginin-cati-tipi-gunes-santralinin-ilk-fazi-devrede-300x187.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/japon-panasonic-ortakliginin-cati-tipi-gunes-santralinin-ilk-fazi-devrede-768x480.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/japon-panasonic-ortakliginin-cati-tipi-gunes-santralinin-ilk-fazi-devrede-500x312.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/japon-panasonic-ortakliginin-cati-tipi-gunes-santralinin-ilk-fazi-devrede-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2019\/01\/japon-panasonic-ortakliginin-cati-tipi-gunes-santralinin-ilk-fazi-devrede.jpg 781w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>members is fully commissioned, the installed capacity of 5.8 mw will increase to 35 mw.<\/p>\n<p><strong>&#8220;Turkey&#8217;s Solar Radiation Values \u200b\u200bAre Very High&#8221;<\/strong><\/p>\n<p>Sefero\u011flu Electrical Assistant General Manager Murat Sefero\u011flu the statement &#8220;we have realized this project in partnership with Panasonic, not only in Turkey, will be an example to the world. Turkey to turn to renewable energy such as solar energy is very important, &#8220;he gave expression to the place.<\/p>\n<p>Panasonic Eco Solutions Turkey General Manager Tatsuya Kumazawa emphasis on the work done in the company as Turkey, &#8220;Turkey is an important and potentially high country. Although it is located in the southernmost part of Europe, it has a daily average of 7.2 hours in terms of solar potential and 2 thousand 650 hours of sunshine per year. We aim to gain many more solar energy projects in Turkey. &#8221; said.<\/p>","protected":false},"excerpt":{"rendered":"<p>The first phase of the solar power plant (GES) established on the roof of the renewable energy cooperative in Kayseri was commissioned by Panasonic and Sefero\u011flu Elektrik, a leading technology company in Japan. Using the developed HIT solar panel, Kayseri Furnishers Renewable Energy Cooperative GES has a total investment of 7.2 million dollars. When the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":85010,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[38826,30578,41345,67,1009,23416,23133,1657,23131,44288,44282,44281,44290,36857,44285,42848,5842,42846,42845,44287,38750,44286,44289,44284],"views":1620,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/85008"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=85008"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/85008\/revisions"}],"predecessor-version":[{"id":85018,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/85008\/revisions\/85018"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/85010"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=85008"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=85008"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=85008"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}