{"id":84394,"date":"2018-12-29T22:45:48","date_gmt":"2018-12-29T19:45:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=84394"},"modified":"2018-12-30T15:25:21","modified_gmt":"2018-12-30T12:25:21","slug":"energrom-yeni-bir-biyogaz-santralinin-kurulumunu-manisaya-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/energrom-yeni-bir-biyogaz-santralinin-kurulumunu-manisaya-yapacak\/","title":{"rendered":"(Turkish) Energrom, Yeni Bir Biyogaz Santralinin Kurulumunu Manisa\u2019ya Yapacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/84394\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Energrom Enerji taraf\u0131ndan Manisa\u2019n\u0131n Turgutlu il\u00e7esinde kurulacak 2.2 MW kapasiteli biyogaz tesisi ile b\u00fcy\u00fckba\u015f hayvan ve tavuk g\u00fcbresinden elektrik \u00fcretimi yap\u0131lacak.<img loading=\"lazy\" class=\"alignright size-medium wp-image-84396\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/energrom-yeni-bir-biyogaz-santralinin-kurulumunu-manisaya-yapacak-300x158.jpg\" alt=\"\" width=\"300\" height=\"158\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/energrom-yeni-bir-biyogaz-santralinin-kurulumunu-manisaya-yapacak-300x158.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/energrom-yeni-bir-biyogaz-santralinin-kurulumunu-manisaya-yapacak-500x263.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/energrom-yeni-bir-biyogaz-santralinin-kurulumunu-manisaya-yapacak-80x42.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/energrom-yeni-bir-biyogaz-santralinin-kurulumunu-manisaya-yapacak.jpg 608w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Energrom Enerji \u0130n\u015faat Tic.ve San. A.\u015e., Bal\u0131kesir, \u0130zmir ve Ayd\u0131n\u2019dan sonra Manisa\u2019da da biyogaz santrali kurmaya haz\u0131rlan\u0131yor. \u015eirket Manisa \u0130li, Turgutlu \u0130l\u00e7esi, \u00c7epnidere Mahallesi, K\u0131\u015fla Deresi Mevkii&#8217;nde 2,2 MWe kurulu g\u00fcc\u00fc olacak 350 ton\/g\u00fcn kapasiteye sahip biyogaz tesisi kuracak.<\/p>\n<p>Santral ile b\u00f6lgede olu\u015fan hayvan d\u0131\u015fk\u0131s\u0131 (b\u00fcy\u00fckba\u015f besi ve s\u00fct hayvanc\u0131l\u0131k i\u015fletmeleri ve yumurta tavu\u011fu i\u015fletmeleri) at\u0131klar\u0131ndan sa\u011flanan biyogaz ile elektrik \u00fcretimi yap\u0131lacak. Santralin yakla\u015f\u0131k 75.7 milyon lira yat\u0131r\u0131m bedeli olup g\u00fcnde yakla\u015f\u0131k 250 ton civar\u0131nda b\u00fcy\u00fckba\u015f hayvan g\u00fcbresi ve 100 ton tavuk g\u00fcbresi kullan\u0131lmas\u0131 \u00f6ng\u00f6r\u00fclmektedir. Santralde y\u0131lda 18.755.237 kWh elektrik \u00fcretimi ger\u00e7ekle\u015ftirilecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Energrom Enerji taraf\u0131ndan Manisa\u2019n\u0131n Turgutlu il\u00e7esinde kurulacak 2.2 MW kapasiteli biyogaz tesisi ile b\u00fcy\u00fckba\u015f hayvan ve tavuk g\u00fcbresinden elektrik \u00fcretimi yap\u0131lacak. Energrom Enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":84396,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[640,41508,43693,29816,68,34979,19638,34980,26353,43690,37177,43691,67,1009,2191,34977,43694,43692,26829],"views":1981,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/84394"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=84394"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/84394\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/84396"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=84394"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=84394"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=84394"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}