{"id":84385,"date":"2018-12-30T14:04:26","date_gmt":"2018-12-30T11:04:26","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=84385"},"modified":"2018-12-30T14:07:51","modified_gmt":"2018-12-30T11:07:51","slug":"vestas-a-rusyadan-198-mw-ruzgar-turbini-siparisi-geldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/vestas-a-rusyadan-198-mw-ruzgar-turbini-siparisi-geldi\/","title":{"rendered":"(Turkish) Vestas&#8217;a Rusya\u2019dan 198 MW R\u00fczgar T\u00fcrbini Sipari\u015fi Geldi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/84385\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Vestas&#8217;a Rusya\u2019n\u0131n en b\u00fcy\u00fck r\u00fczgar santrali konumundaki Kamensko-Krasnosulinsky RES&#8217;ine y\u00f6nelik WEDF Second Wind Farm LLC \u015firketince 3.45 MW\u2019l\u0131k 52 adet t\u00fcrbin sipari\u015fi verildi.<img loading=\"lazy\" class=\"alignright size-medium wp-image-84387\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/vestas-a-rusyadan-198-mw-ruzgar-turbini-siparisi-geldi-300x163.jpg\" alt=\"\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/vestas-a-rusyadan-198-mw-ruzgar-turbini-siparisi-geldi-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/vestas-a-rusyadan-198-mw-ruzgar-turbini-siparisi-geldi-500x271.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/vestas-a-rusyadan-198-mw-ruzgar-turbini-siparisi-geldi-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/vestas-a-rusyadan-198-mw-ruzgar-turbini-siparisi-geldi.jpg 680w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Danimarka&#8217;n\u0131n merkezinde yer alan r\u00fczgar t\u00fcrbinleri \u00fcreticisi Vestas a\u00e7\u0131klamas\u0131nda, Rusya\u2019n\u0131n Rostov b\u00f6lgesinde yap\u0131lacak \u00fclkenin en b\u00fcy\u00fck r\u00fczgar santrali Kamensko-Krasnosulinsky&#8217;ye y\u00f6nelik Rus <strong>Rusnano<\/strong> ve <strong>Finli Fortum Oyj<\/strong>\u2019nin ba\u011fl\u0131 ortakl\u0131\u011f\u0131 <strong>WEDF Second Wind Farm LLC<\/strong> \u015firketinden 52 adet V126-3.45 MW t\u00fcrbin sipari\u015fi ald\u0131\u011f\u0131 belirtildi.<\/p>\n<p>Kurulacak r\u00fczgar t\u00fcrbinleri 198 MW g\u00fcce sahip olup 2019&#8217;un d\u00f6rd\u00fcnc\u00fc \u00e7eyre\u011finde teslimatlar\u0131 ger\u00e7ekle\u015ftirilecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Vestas&#8217;a Rusya\u2019n\u0131n en b\u00fcy\u00fck r\u00fczgar santrali konumundaki Kamensko-Krasnosulinsky RES&#8217;ine y\u00f6nelik WEDF Second Wind Farm LLC \u015firketince 3.45 MW\u2019l\u0131k 52 adet t\u00fcrbin sipari\u015fi verildi. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":84387,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[67,1009,43686,43683,35002,9213,43685,885,69,24949,35004,23318,34960,23130,43682,34977,4734,43684,26829],"views":1126,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/84385"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=84385"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/84385\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/84387"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=84385"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=84385"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=84385"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}