{"id":84353,"date":"2018-12-29T23:13:49","date_gmt":"2018-12-29T20:13:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=84353"},"modified":"2018-12-29T23:16:00","modified_gmt":"2018-12-29T20:16:00","slug":"bodrum-gunes-enerjili-bir-otogara-daha-kavusacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bodrum-gunes-enerjili-bir-otogara-daha-kavusacak\/","title":{"rendered":"(Turkish) Bodrum, G\u00fcne\u015f Enerjili Bir Otogara Daha Kavu\u015facak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/84353\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Mu\u011fla B\u00fcy\u00fck\u015fehir Belediyesi Bodrum \u0130l\u00e7esi\u2019ne arsa bedeli 24 Milyon 600 Bin TL, otogar ihalesi 45 Milyon 548 Bin TL ve 4 Milyon TL g\u00fcne\u015f enerji panelleri olmak \u00fczere toplam 74 Milyon yat\u0131r\u0131m bedeline sahip otogar yap\u0131yor.<\/strong><\/p>\n<p>Enerjisini \u00e7at\u0131s\u0131ndaki g\u00fcne\u015f panellerinden sa\u011flamas\u0131 planlanan Bodrum Otogar\u0131\u2019n\u0131n in\u015faat alan\u0131 17 bin<strong><img loading=\"lazy\" class=\"alignright size-medium wp-image-84355\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/bodrum-gunes-enerjili-bir-otogara-daha-kavusacak-300x198.jpg\" alt=\"\" width=\"300\" height=\"198\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/bodrum-gunes-enerjili-bir-otogara-daha-kavusacak-300x198.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/bodrum-gunes-enerjili-bir-otogara-daha-kavusacak-500x331.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/bodrum-gunes-enerjili-bir-otogara-daha-kavusacak-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/bodrum-gunes-enerjili-bir-otogara-daha-kavusacak.jpg 620w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong> 117 metrekare, \u015fehirleraras\u0131 otob\u00fcs peron say\u0131s\u0131 21, minib\u00fcs peron say\u0131s\u0131 45, minib\u00fcs depo peron say\u0131s\u0131 10, a\u00e7\u0131k otopark say\u0131s\u0131 157 ara\u00e7, kapal\u0131 otopark\u0131 19 ara\u00e7 ve engelli otopark\u0131 da 8 ara\u00e7 olarak tasarland\u0131.<\/p>\n<p>Mu\u011fla Mente\u015fe\u2019de yap\u0131m\u0131 tamamlanan ve enerjisinin y\u00fczde 80\u2019ini \u00e7at\u0131s\u0131ndan sa\u011flayan Mente\u015fe \u015eehirleraras\u0131 otogar\u0131ndaki gibi Bodrum Otogar\u0131\u2019n\u0131n \u00e7at\u0131s\u0131 da tamamen g\u00fcne\u015f panellerinden olu\u015facak. Bodrum otogar\u0131nda bir ilk olarak 6 tane elektrikli ara\u00e7 \u015farj istasyonu yer alacak. 630 KW g\u00fcc\u00fcnde g\u00fcne\u015f enerji santralinin kurulaca\u011f\u0131 Bodrum otogar\u0131n\u0131n \u00e7at\u0131s\u0131n\u0131 olu\u015fturacak g\u00fcne\u015f panellerinin maliyeti 4 Milyon TL. Bodrum il\u00e7esindeki mevcut otogar\u0131n il\u00e7e merkezi d\u0131\u015f\u0131na ta\u015f\u0131nmas\u0131yla da \u015fehir i\u00e7i trafi\u011finin de b\u00fcy\u00fck \u00f6l\u00e7\u00fcde rahatlat\u0131lmas\u0131 \u00f6ng\u00f6r\u00fclmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Mu\u011fla B\u00fcy\u00fck\u015fehir Belediyesi Bodrum \u0130l\u00e7esi\u2019ne arsa bedeli 24 Milyon 600 Bin TL, otogar ihalesi 45 Milyon 548 Bin TL ve 4 Milyon TL [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":84355,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[20870,24218,26659,35224,67,1009,35038,227,23416,35039,23133,34925,23131,43658,3089],"views":1007,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/84353"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=84353"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/84353\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/84355"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=84353"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=84353"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=84353"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}