{"id":84242,"date":"2018-12-27T21:44:10","date_gmt":"2018-12-27T18:44:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=84242"},"modified":"2018-12-27T21:46:26","modified_gmt":"2018-12-27T18:46:26","slug":"antalyada-7-429-ciftci-sulamada-kullandigi-elektrige-ucret-odemeyecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/antalyada-7-429-ciftci-sulamada-kullandigi-elektrige-ucret-odemeyecek\/","title":{"rendered":"(Turkish) Antalya&#8217;da 7.429 \u00c7ift\u00e7i Sulamada Kulland\u0131\u011f\u0131 Elektri\u011fe \u00dccret \u00d6demeyecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/84242\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Antalya B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan \u00e7ift\u00e7iye elektrik deste\u011fi verilecek olunan 3&#8217;\u00fcnc\u00fc Etap G\u00fcne\u015f Enerji Santrali \u00e7al\u0131\u015fmalar\u0131na ba\u015fland\u0131.<\/strong><\/p>\n<p>B\u00fcy\u00fck\u015fehir Belediyesi ve Bat\u0131 Akdeniz Kalk\u0131nma Ajans\u0131&#8217;n\u0131n ortak \u00e7al\u0131\u015fmalar\u0131yla hayata ge\u00e7irilecek <img loading=\"lazy\" class=\"alignright size-medium wp-image-84244\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/antalyada-7-429-ciftci-sulamada-kullandigi-elektrige-ucret-odemeyecek-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/antalyada-7-429-ciftci-sulamada-kullandigi-elektrige-ucret-odemeyecek-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/antalyada-7-429-ciftci-sulamada-kullandigi-elektrige-ucret-odemeyecek-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/antalyada-7-429-ciftci-sulamada-kullandigi-elektrige-ucret-odemeyecek-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/antalyada-7-429-ciftci-sulamada-kullandigi-elektrige-ucret-odemeyecek.jpg 620w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>3&#8217;\u00fcnc\u00fc Etap G\u00fcne\u015f Enerji Santrali, di\u011fer iki santralin yan\u0131nda 46 bin m2 lik alan \u00fczerinde yer alacakt\u0131r.<\/p>\n<p><strong>Santral Gelecek Y\u0131l \u015eubat Ay\u0131nda Tamamlanacak<\/strong><\/p>\n<p>3 mw kurulu g\u00fcce sahip olacak yeni santral tamamland\u0131\u011f\u0131nda B\u00fcy\u00fck\u015fehir Belediyesinin \u00fcretim kapasitesi 5 mw&#8217;a y\u00fckselmi\u015f olacak. Kentte tar\u0131msal sulamaya y\u00f6nelik y\u0131ll\u0131k 5 mw elektrik \u00fcretmekte olan 39 sulama kooperatifindeki 7.429 \u00e7ift\u00e7i, sulamada kulland\u0131\u011f\u0131 elektri\u011fe \u00fccret \u00f6demeyecek.<\/p>\n<p>Di\u011fer yandan \u00fcretime ge\u00e7mi\u015f olan santrallerden sa\u011flanan enerjiyle Antalya\u2019da yer alan sulama kooperatiflerine iki y\u0131l zarf\u0131nda toplam da 4 milyon 630 bin lira destek \u00f6demesi yap\u0131ld\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Antalya B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan \u00e7ift\u00e7iye elektrik deste\u011fi verilecek olunan 3&#8217;\u00fcnc\u00fc Etap G\u00fcne\u015f Enerji Santrali \u00e7al\u0131\u015fmalar\u0131na ba\u015fland\u0131. B\u00fcy\u00fck\u015fehir Belediyesi ve Bat\u0131 Akdeniz Kalk\u0131nma Ajans\u0131&#8217;n\u0131n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":84244,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[5201,7939,18602,16138,13370,43552,130,63,67,1009,35038,21886,23416,24386,2569,16920,26059,43553,5296,37540],"views":865,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/84242"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=84242"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/84242\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/84244"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=84242"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=84242"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=84242"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}