{"id":84027,"date":"2018-12-25T12:19:16","date_gmt":"2018-12-25T09:19:16","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=84027"},"modified":"2018-12-25T14:33:53","modified_gmt":"2018-12-25T11:33:53","slug":"sinop-a-12-mw-gucunde-biyokutle-santrali-yatirimi-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sinop-a-12-mw-gucunde-biyokutle-santrali-yatirimi-yapilacak\/","title":{"rendered":"(Turkish) Sinop\u2019a 12 MW G\u00fcc\u00fcnde Biyok\u00fctle Santrali Yat\u0131r\u0131m\u0131 Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/84027\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Satem Sinop Biyok\u00fctle Enerji taraf\u0131ndan Sinop\u2019ta 12 MW kapasiteli biyok\u00fctle santrali kurularak b\u00f6lgenin orman ve tar\u0131m at\u0131klar\u0131ndan elektrik \u00fcretimi yap\u0131lacak.<\/h1>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-84029\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/sinopta-12-mw-gucunde-biyokutle-santrali-yatirimi-yapilacak-300x240.jpg\" alt=\"\" width=\"300\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/sinopta-12-mw-gucunde-biyokutle-santrali-yatirimi-yapilacak-300x240.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/sinopta-12-mw-gucunde-biyokutle-santrali-yatirimi-yapilacak-768x614.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/sinopta-12-mw-gucunde-biyokutle-santrali-yatirimi-yapilacak-500x400.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/sinopta-12-mw-gucunde-biyokutle-santrali-yatirimi-yapilacak-63x50.jpg 63w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/sinopta-12-mw-gucunde-biyokutle-santrali-yatirimi-yapilacak.jpg 800w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Sinop ili, Merkez \u0130l\u00e7esi, OSB mahallesi, Demirci K\u00f6y\u00fc Mevkiinde bulunan 25.747,75 m2 alan i\u00e7erisinde Satem Sinop Biyok\u00fctle Enerji Ltd. \u015eti. taraf\u0131ndan 12 MWe\/12,50 MWm\/43,19 MWt kapasiteye sahip Satem Sinop Biyok\u00fctle Enerji Santrali\u2019nin kurulup i\u015fletilmesi \u00f6ng\u00f6r\u00fclmektedir. Yakla\u015f\u0131k 24 milyon lira yat\u0131r\u0131m bedeli ile kurulacak olan santral y\u0131lda 85.014 ton hammadde yakarak elektrik \u00fcretimi ger\u00e7ekle\u015ftirecektir. Bu hammaddenin 76.514 ton\/y\u0131l\u2019l\u0131k k\u0131sm\u0131 orman, orman \u00fcr\u00fcn\u00fc (yakacak odun, lif yonga, ka\u011f\u0131tl\u0131k odun, orman tali \u00fcr\u00fcnleri, k\u00f6k odunu) ve standart d\u0131\u015f\u0131 orman \u00fcr\u00fcn\u00fc (2-5 cm aras\u0131) 8.500 ton\/y\u0131l\u2019l\u0131k k\u0131sm\u0131 ise tar\u0131m at\u0131\u011f\u0131ndan (m\u0131s\u0131r ko\u00e7an\u0131, \u00e7eltik sap\u0131, domates pa\u015fas\u0131, \u015feftali \u00e7ekirde\u011fi vs.) olu\u015facak.<\/p>\n<p>Ak\u0131\u015fkan Yatakl\u0131 Yakma Kazan\u0131 sisteminin kullan\u0131laca\u011f\u0131 tesiste y\u0131lda toplam 96.000 MWh elektrik ve saatlik 43,19 MWt \u0131s\u0131l g\u00fc\u00e7 elde edilecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Satem Sinop Biyok\u00fctle Enerji taraf\u0131ndan Sinop\u2019ta 12 MW kapasiteli biyok\u00fctle santrali kurularak b\u00f6lgenin orman ve tar\u0131m at\u0131klar\u0131ndan elektrik \u00fcretimi yap\u0131lacak. Sinop ili, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":84029,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[43350,35143,1678,29816,41926,68,34979,19638,34980,26353,67,1009,43349,43348,1595,38548,34977,26829],"views":2455,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/84027"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=84027"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/84027\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/84029"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=84027"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=84027"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=84027"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}