{"id":83873,"date":"2018-12-23T16:10:53","date_gmt":"2018-12-23T13:10:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=83873"},"modified":"2018-12-23T16:17:41","modified_gmt":"2018-12-23T13:17:41","slug":"bandirma-belediyesi-gunes-santrali-ile-ges-1-milyon-lira-gelir-sagladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bandirma-belediyesi-gunes-santrali-ile-ges-1-milyon-lira-gelir-sagladi\/","title":{"rendered":"Band\u0131rma Municipality Provided 1 Million TL Income Through Solar Power Plant"},"content":{"rendered":"<p><\/p>\n<h1>1 million pounds of income was generated in 9 months by the solar power plant (ges) built by Band\u0131rma Municipality.<\/h1>\n<p>Band\u0131rma Municipality President Dursun Mirza said earlier in the statement;<\/p>\n<p>&#8220;As Band\u0131rma Municipality, we have implemented a model project by following this change and development in the world. With the Solar Energy project, we will produce clean energy and provide <img loading=\"lazy\" class=\"alignright size-medium wp-image-83875\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/bandirma-belediyesi-gunes-santrali-ile-ges-1-milyon-lira-gelir-sagladi-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/bandirma-belediyesi-gunes-santrali-ile-ges-1-milyon-lira-gelir-sagladi-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/bandirma-belediyesi-gunes-santrali-ile-ges-1-milyon-lira-gelir-sagladi-768x431.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/bandirma-belediyesi-gunes-santrali-ile-ges-1-milyon-lira-gelir-sagladi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/bandirma-belediyesi-gunes-santrali-ile-ges-1-milyon-lira-gelir-sagladi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/bandirma-belediyesi-gunes-santrali-ile-ges-1-milyon-lira-gelir-sagladi.jpg 869w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>savings by meeting the electricity costs of our Municipality.<\/p>\n<p>Erikli Mahallemizde belonging to our municipality and we have developed our project in non-fertile land. After receiving the necessary permits and documents, we made the tender for our project. We will finish the construction of our project that will produce electricity from solar energy. The municipality, which pays an average energy cost of 780 thousand liras per year, will provide an energy saving of 700 thousand liras annually after the implementation of the system. provided.<\/p>\n<p>Total investment cost of 4 million 60 thousand TL with one project in Balikesir, Turkey&#8217;s leading solar power plant in Turkey for the position and in our region &#8220;Now we are producing our own energy.&#8221; had used the expressions.<\/p>","protected":false},"excerpt":{"rendered":"<p>1 million pounds of income was generated in 9 months by the solar power plant (ges) built by Band\u0131rma Municipality. Band\u0131rma Municipality President Dursun Mirza said earlier in the statement; &#8220;As Band\u0131rma Municipality, we have implemented a model project by following this change and development in the world. With the Solar Energy project, we will [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":83875,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[3613,43243,43244,43246,43247,43251,43162,43245,13237,42491,41345,43237,67,1009,1412,6014,23416,38247,12474,34925,35037,23131,43248,42552,42843,43249,42868,43250,42844,42994,42869,34977,6854,26829],"views":1637,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83873"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=83873"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83873\/revisions"}],"predecessor-version":[{"id":83879,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83873\/revisions\/83879"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/83875"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=83873"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=83873"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=83873"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}