{"id":83853,"date":"2018-12-23T15:11:32","date_gmt":"2018-12-23T12:11:32","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=83853"},"modified":"2018-12-23T15:45:17","modified_gmt":"2018-12-23T12:45:17","slug":"viransehirde-500-mw-kurulu-guce-sahip-ges-kurulumu-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/viransehirde-500-mw-kurulu-guce-sahip-ges-kurulumu-yapilacak\/","title":{"rendered":"500 MW Solar Power Plant GES Installation In Viransehir"},"content":{"rendered":"<p><strong>The feasibility studies for the establishment of a 500 MW Solar Power Plant in the Viransehir district of Sanliurfa were initiated by the Ministry of Energy and Natural Resources.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"size-medium wp-image-83855 alignright\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/viransehirde-500-mw-kurulu-guce-sahip-ges-kurulumu-yapilacak-300x187.jpg\" alt=\"\" width=\"300\" height=\"187\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/viransehirde-500-mw-kurulu-guce-sahip-ges-kurulumu-yapilacak-300x187.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/viransehirde-500-mw-kurulu-guce-sahip-ges-kurulumu-yapilacak-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/viransehirde-500-mw-kurulu-guce-sahip-ges-kurulumu-yapilacak.jpg 460w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>District Governor \u00d6mer Dereci said in a statement; T\u0131 The Ministry of Energy and Natural Resources initiated a study to establish a 500 MW installed power plant in Viransehir. Feasibility studies are carried out for the system to be auctioned at the beginning of 2019. 1000 &#8211; 2000 thousand people will be employed in this process for the solar power plant to be operational in 3 or 5 years. We will endeavor to employ the people of Viran\u015fehir. After the establishment of this facility, 300 permanent people will be employed.<\/p>\n<p>Viran\u015fehir citizens will be employed in the facility to be established in the Public Education Center will be trained by opening various courses. Successful candidates will start working immediately.<\/p>","protected":false},"excerpt":{"rendered":"<p>The feasibility studies for the establishment of a 500 MW Solar Power Plant in the Viransehir district of Sanliurfa were initiated by the Ministry of Energy and Natural Resources. District Governor \u00d6mer Dereci said in a statement; T\u0131 The Ministry of Energy and Natural Resources initiated a study to establish a 500 MW installed power [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":83855,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[42491,41345,67,1009,23416,2569,23133,34925,23131,43214,2097,42843,42868,42845,42844,42869,39714],"views":1655,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83853"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=83853"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83853\/revisions"}],"predecessor-version":[{"id":83867,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83853\/revisions\/83867"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/83855"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=83853"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=83853"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=83853"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}