{"id":83754,"date":"2018-12-20T23:08:09","date_gmt":"2018-12-20T20:08:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=83754"},"modified":"2018-12-20T23:08:49","modified_gmt":"2018-12-20T20:08:49","slug":"demirdag-guneste-alim-tesvigi-degil-sadece-yeni-kapasite-istiyoruz","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/demirdag-guneste-alim-tesvigi-degil-sadece-yeni-kapasite-istiyoruz\/","title":{"rendered":"(Turkish) Demirda\u011f: &#8220;G\u00fcne\u015f&#8217;te Al\u0131m Te\u015fvi\u011fi De\u011fil, Sadece Yeni Kapasite \u0130stiyoruz&#8221;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/83754\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>G\u00fcne\u015f enerjisi sekt\u00f6r\u00fcn\u00fcn 2018 y\u0131l\u0131nda 5 bin MW\u2019\u0131 ge\u00e7en kapasitesi, panelde y\u00fczde 50\u2019yi, GES\u2019te ise y\u00fczde 75\u2019i a\u015fan yerlilik oran\u0131 ile g\u00fcc\u00fcn\u00fc ispatlad\u0131\u011f\u0131na dikkat \u00e7eken GENSED ve Smart Energy Ba\u015fkan\u0131 Halil Demirda\u011f, \u201c2019 y\u0131l\u0131nda daha da iyisini yapabiliriz\u201d dedi. Demirda\u011f, 2018 y\u0131l\u0131nda g\u00fcne\u015fin en ucuz enerji kayna\u011f\u0131 oldu\u011funu ispatlad\u0131\u011f\u0131n\u0131 belirtirken \u201c2019 y\u0131l\u0131nda al\u0131m te\u015fvi\u011fi (F\u0130Ts) de\u011fil, sadece ve sadece yeni kapasite istiyoruz\u201d dedi.<\/strong><\/p>\n<p>T\u00fcrkiye\u2019nin 2019 y\u0131l\u0131nda g\u00fcne\u015f enerjisinde \u00f6nemli ba\u015far\u0131lara imza att\u0131\u011f\u0131n\u0131 vurgulayan T\u00fcrkiye G\u00fcne\u015f Enerjisi Sanayicileri ve End\u00fcstrisi Derne\u011fi (GENSED) Ba\u015fkan\u0131 Halil Demirda\u011f, sekt\u00f6r\u00fcn 2019 y\u0131l\u0131na ili\u015fkin beklenti ve hedeflerini payla\u015ft\u0131. G\u00fcne\u015f enerjisi sekt\u00f6r\u00fcnde yat\u0131r\u0131mc\u0131 ve panel \u00fcreticisi kimli\u011fi ile <img loading=\"lazy\" class=\"alignleft size-medium wp-image-83756\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/english-demirdag-guneste-alim-tesvigi-degil-sadece-yeni-kapasite-istiyoruz-300x215.jpg\" alt=\"\" width=\"300\" height=\"215\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/english-demirdag-guneste-alim-tesvigi-degil-sadece-yeni-kapasite-istiyoruz-300x215.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/english-demirdag-guneste-alim-tesvigi-degil-sadece-yeni-kapasite-istiyoruz-768x551.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/english-demirdag-guneste-alim-tesvigi-degil-sadece-yeni-kapasite-istiyoruz-1024x735.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/english-demirdag-guneste-alim-tesvigi-degil-sadece-yeni-kapasite-istiyoruz-500x359.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/english-demirdag-guneste-alim-tesvigi-degil-sadece-yeni-kapasite-istiyoruz-70x50.jpg 70w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/english-demirdag-guneste-alim-tesvigi-degil-sadece-yeni-kapasite-istiyoruz.jpg 1307w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>sekt\u00f6r\u00fcn \u00f6nde gelen firmalar\u0131ndan olan Smart Energy\u2019nin Y\u00f6netim Kurulu Ba\u015fkan\u0131 da olan Demirda\u011f, 2019 y\u0131l\u0131nda T\u00fcrkiye\u2019nin bu alanda \u00e7ok daha b\u00fcy\u00fck i\u015fleri hayata ge\u00e7irebilece\u011fini belirtti.<\/p>\n<p><strong>KURULU G\u00dc\u00c7 5 YILDA 125 KAT ARTTI<\/strong><\/p>\n<p>T\u00fcrkiye\u2019nin g\u00fcne\u015f enerjisi kurulu g\u00fcc\u00fcn\u00fcn, 30 Kas\u0131m 2018 itibariyle 4.921 megavat (MW) lisanss\u0131z, 82 MW lisansl\u0131 olmak \u00fczere toplam 5 gigavat (GW) s\u0131n\u0131r\u0131n\u0131 ge\u00e7ti\u011fine dikkat \u00e7eken Demirda\u011f, \u015fu de\u011ferlendirmeyi yapt\u0131: \u201cBu k\u00fc\u00e7\u00fckten b\u00fcy\u00fc\u011fe t\u00fcm g\u00fcne\u015f yat\u0131r\u0131mc\u0131lar\u0131 ile T\u00fcrkiye\u2019nin ba\u015far\u0131s\u0131d\u0131r. Gelinen seviye T\u00fcrkiye\u2019nin g\u00fcne\u015f enerjisi kapasitesini 5 y\u0131lda 125 kat art\u0131rd\u0131\u011f\u0131n\u0131 g\u00f6steriyor. 2014 y\u0131l\u0131nda bu rakam sadece 40 MW seviyesindeydi, 2017 y\u0131l\u0131nda 3 bin MW\u2019\u0131 a\u015ft\u0131k ve 2018 y\u0131l\u0131nda 5 bin MW seviyesini ge\u00e7tik. 2018 y\u0131l\u0131nda y\u00fczde 50\u2019yi bulan g\u00fc\u00e7 art\u0131\u015f\u0131 ya\u015fad\u0131k. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131m\u0131z, r\u00fczgar ve g\u00fcne\u015f santrallar\u0131nda 10 y\u0131l i\u00e7inde 10 bin MW kurulu g\u00fc\u00e7 ilave edilmesi hedefini ortaya koydu. Biz bug\u00fcne kadar oldu\u011fu gibi bundan sonra da \u00fczerimize d\u00fc\u015feni yapmay\u0131 haz\u0131r\u0131z. \u201c<\/p>\n<p><strong>YERL\u0130 VE M\u0130LL\u0130 ENERJ\u0130N\u0130N KAYNA\u011eI G\u00dcNE\u015e<\/strong><\/p>\n<p>T\u00fcrkiye\u2019de en h\u0131zl\u0131 yerlile\u015fen sekt\u00f6rlerin ba\u015f\u0131nda g\u00fcne\u015f enerjisinin geldi\u011fini belirten Demirda\u011f, \u015f\u00f6yle konu\u015ftu: \u201c\u015eu anda panel baz\u0131nda y\u00fczde 50\u2019den, GES baz\u0131nda ise y\u00fczde 75\u2019den fazla yerlilik oran\u0131na ula\u015ft\u0131k. K\u0131sa s\u00fcrede bu seviyeye ula\u015fmak \u00e7ok \u00f6nemli bir ba\u015far\u0131, ancak biz bu oranlar\u0131 hala yeterli g\u00f6rm\u00fcyoruz. Bu oranlar\u0131 ne kadar b\u00fcy\u00fctebilirsek o kadar milli ve yerli oluruz. GES\u2019lerdeki yerlilik oran\u0131n\u0131 art\u0131rmak i\u00e7in panelin h\u00fccresini yapmak kald\u0131. \u015eu anda panel yerli, trafo yerli, kesici yerli, \u00e7elik yap\u0131lar yerli, kablo yerli. Devletimiz sekt\u00f6re g\u00fcvence verirse sekt\u00f6r h\u00fccreyi de yerlile\u015ftirecektir.\u201c<\/p>\n<p><strong>2019, G\u00dcNE\u015e\u0130N DE\u011eER\u0130N\u0130N B\u0130L\u0130ND\u0130\u011e\u0130 B\u0130R YIL OLSUN<\/strong><\/p>\n<p>Yeni y\u0131la say\u0131l\u0131 g\u00fcnler kala g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcn\u00fcn 2019\u2019a dair beklentilerini payla\u015fan Demirda\u011f, s\u00f6zlerine \u015f\u00f6yle devam etti: \u201cYat\u0131r\u0131mlar\u0131n s\u00fcrmesi ve \u00fclkemize daha fazla GES kurulabilmesi i\u00e7in yeni kapasiteler yarat\u0131larak \u00fcretici desteklenmeli. Bu sayede, sekt\u00f6r olarak \u00f6n\u00fcm\u00fcz a\u00e7\u0131labilir ve 2019 y\u0131l\u0131 ve sonras\u0131nda da g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcnde kaliteli i\u015fler yapmaya devam edebiliriz. 2019 y\u0131l\u0131nda al\u0131m te\u015fvi\u011fi (F\u0130Ts) de\u011fil, sadece ve sadece yeni kapasite istiyoruz. Sekt\u00f6r\u00fcm\u00fczde, \u00e7at\u0131 yat\u0131r\u0131mlar\u0131n\u0131n artmas\u0131, yeni kapasitelerin artmas\u0131, YEKA (Yenilenebilir Enerji Kaynak Alanlar\u0131) projelerinin devam etmesi beklentisi var. \u0130stiyoruz ki, 2019 y\u0131l\u0131nda daha \u00e7ok ev, daha \u00e7ok fabrika kendi elektri\u011fini \u00fcretsin, hatta \u00fcretmekle kalmay\u0131p kom\u015fular\u0131na satabilsin, 2019 g\u00fcne\u015fin de\u011ferinin bilindi\u011fi bir y\u0131l olsun.\u201d<\/p>\n<p>Enerjide art\u0131k dengelerin de\u011fi\u015fti\u011fini ifade eden Demirda\u011f, a\u00e7\u0131klamas\u0131n\u0131 \u015f\u00f6yle tamamlad\u0131: \u201c2018 y\u0131l\u0131 g\u00f6sterdi ki, g\u00fcne\u015f d\u00fcnyan\u0131n en ucuz enerji kayna\u011f\u0131. G\u00fcne\u015f enerjisi sekt\u00f6r\u00fcnde verimlilik oranlar\u0131 h\u0131zla artm\u0131\u015f durumda. Bu sekt\u00f6re yat\u0131r\u0131m yapmak eskisine nazaran \u00e7ok daha uygun maliyetlerle m\u00fcmk\u00fcn. T\u00fcrkiye, yenilenebilir enerjiyi kalk\u0131nmas\u0131n\u0131n lokomotifi olarak kullanan geli\u015fmi\u015f \u00fclkelerin izinden gitmeli ve do\u011fal kaynaklar konusundaki \u015fans\u0131n\u0131 kullanarak enerjisini yerin \u00fcst\u00fcnde aramal\u0131. \u00c7\u00fcnk\u00fc g\u00fcne\u015f enerjisi sayesinde enerji ba\u011f\u0131ms\u0131zl\u0131\u011f\u0131m\u0131z\u0131 kazanabilir, cari a\u00e7\u0131\u011f\u0131m\u0131z\u0131 kapatabilir ve yeni istihdam alanlar\u0131 yaratabiliriz.\u201d<\/p>\n<p><strong>T\u00dcRK\u0130YE\u2019N\u0130N G\u00dcNE\u015e ENERJ\u0130S\u0130\u00a0KURULU G\u00dcC\u00dc 5 YILDA 125 KAT ARTTI<\/strong><\/p>\n<p><strong><u>YIL<\/u><u>\u00a0<\/u><\/strong><strong><u>KURULU G\u00dc\u00c7 (MW)<\/u><\/strong><\/p>\n<p>2014 &#8211; 40<\/p>\n<p>2015 &#8211; 249<\/p>\n<p>2016 &#8211; 832<\/p>\n<p>2017 &#8211; 3.420<\/p>\n<p>2018 &#8211; 5.003<\/p>\n<p><strong>*Kaynak:\u00a0<\/strong><strong>TE\u0130A\u015e<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.G\u00fcne\u015f enerjisi sekt\u00f6r\u00fcn\u00fcn 2018 y\u0131l\u0131nda 5 bin MW\u2019\u0131 ge\u00e7en kapasitesi, panelde y\u00fczde 50\u2019yi, GES\u2019te ise y\u00fczde 75\u2019i a\u015fan yerlilik oran\u0131 ile g\u00fcc\u00fcn\u00fc ispatlad\u0131\u011f\u0131na [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":83756,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[43075,67,1009,43076,727,35038,21886,43078,23416,19757,43074,2206,43079,23133,1657,8255,35037,23131,43072,43073,34862,33702,43077,26385,43080,4748,97,25578,26829,31711,2469,6719,30606],"views":771,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83754"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=83754"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83754\/revisions"}],"predecessor-version":[{"id":83755,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83754\/revisions\/83755"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/83756"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=83754"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=83754"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=83754"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}