{"id":83736,"date":"2018-12-20T22:06:31","date_gmt":"2018-12-20T19:06:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=83736"},"modified":"2018-12-20T22:26:14","modified_gmt":"2018-12-20T19:26:14","slug":"baglarbasi-gunes-santrali-ges-ile-1-250-konutun-yillik-elektrigi-uretiliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/baglarbasi-gunes-santrali-ges-ile-1-250-konutun-yillik-elektrigi-uretiliyor\/","title":{"rendered":"(Turkish) Ba\u011flarba\u015f\u0131 G\u00fcne\u015f Santrali (GES) \u0130le 1.250 Konutun Y\u0131ll\u0131k Elektri\u011fi \u00dcretiliyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/83736\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Gaziantep B\u00fcy\u00fck\u015fehir Belediyesi&#8217;nin hayata ge\u00e7irdi\u011fi Ba\u011flarba\u015f\u0131 G\u00fcne\u015f Enerji Santrali (GES), 2017 y\u0131l\u0131ndan g\u00fcn\u00fcm\u00fcze 1.250 konutun 1 y\u0131ll\u0131k elektri\u011fini kar\u015f\u0131layacak \u00fcretimi ger\u00e7ekle\u015ftirmektedir.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright size-medium wp-image-83739\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/baglarbasi-gunes-santrali-ges-ile-1-250-konutun-yillik-elektrigi-uretiliyor-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/baglarbasi-gunes-santrali-ges-ile-1-250-konutun-yillik-elektrigi-uretiliyor-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/baglarbasi-gunes-santrali-ges-ile-1-250-konutun-yillik-elektrigi-uretiliyor-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/baglarbasi-gunes-santrali-ges-ile-1-250-konutun-yillik-elektrigi-uretiliyor-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/baglarbasi-gunes-santrali-ges-ile-1-250-konutun-yillik-elektrigi-uretiliyor.jpg 587w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Gaziantep B\u00fcy\u00fck\u015fehir Belediyesi stratejik planlar\u0131 ve vizyonuna enerji t\u00fcketimini yenilenebilir enerji kaynaklar\u0131ndan sa\u011flama karar\u0131n\u0131 alarak bu do\u011frultuda projeler geli\u015ftirdi. Uygun araziler se\u00e7ildi ve kurulacak santrallere y\u00f6nelik uygulama projeleri haz\u0131rland\u0131.<\/p>\n<p>2015&#8217;te yap\u0131m\u0131na karar verilen 1 MW g\u00fcce sahip Ba\u011flarba\u015f\u0131 G\u00fcne\u015f Enerji Santrali\u2019nin in\u015faas\u0131 18 A\u011fustos 2016 tarihinde ba\u015flam\u0131\u015ft\u0131r. 2017&#8217;de yap\u0131m i\u015fi tamamlanarak Ba\u011flarba\u015f\u0131 G\u00fcne\u015f Enerji Santrali devreye girmi\u015ftir. Santralin devreye al\u0131nmas\u0131ndan bu zamana kadar 2 milyon 943 bin 644 Kwh elektrik \u00fcretimi ger\u00e7ekle\u015ftirilirken bu rakam 1.250 konutun 1 y\u0131ll\u0131k t\u00fcketti\u011fi elektri\u011fe kar\u015f\u0131l\u0131k gelmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Gaziantep B\u00fcy\u00fck\u015fehir Belediyesi&#8217;nin hayata ge\u00e7irdi\u011fi Ba\u011flarba\u015f\u0131 G\u00fcne\u015f Enerji Santrali (GES), 2017 y\u0131l\u0131ndan g\u00fcn\u00fcm\u00fcze 1.250 konutun 1 y\u0131ll\u0131k elektri\u011fini kar\u015f\u0131layacak \u00fcretimi ger\u00e7ekle\u015ftirmektedir. Gaziantep B\u00fcy\u00fck\u015fehir [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":83739,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[42991,42490,42484,42996,42489,34979,26353,19,42030,42491,41345,42993,67,1009,1826,42997,35038,42842,23416,35039,23133,23131,42552,42843,42846,42868,42845,42995,42998,42994,42869,26829],"views":861,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83736"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=83736"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83736\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/83739"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=83736"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=83736"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=83736"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}