{"id":83626,"date":"2018-12-19T00:22:30","date_gmt":"2018-12-18T21:22:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=83626"},"modified":"2018-12-19T00:35:49","modified_gmt":"2018-12-18T21:35:49","slug":"kayseride-yenilenebilir-enerji-kooperatifinin-gesinde-ilk-faz-devreye-alindi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kayseride-yenilenebilir-enerji-kooperatifinin-gesinde-ilk-faz-devreye-alindi\/","title":{"rendered":"(Turkish) Kayseri\u2019de Yenilenebilir Enerji Kooperatifi&#8217;nin Ges&#8217;inde \u0130lk Faz Devrede!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/83626\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kayseri Mobilyac\u0131lar Yenilenebilir Enerji Kooperatifi G\u00fcne\u015f Enerjisi Santrali\u2019nin ilk faz a\u00e7\u0131l\u0131\u015f\u0131 ger\u00e7ekle\u015ftirildi.\u00a0A\u00e7\u0131l\u0131\u015f\u0131 yap\u0131lan ilk faz, y\u0131lda 7.5 GWh elektrik \u00fcretimi ile tesislerin g\u00fcnd\u00fcz t\u00fcketiminin y\u00fczde 30\u2019unu kar\u015f\u0131layacak.\u00a0<\/strong><\/p>\n<p>Panasonic \u2013 Sefero\u011flu Elektrik imzas\u0131 ta\u015f\u0131yan ve Panasonic \u00fcr\u00fcnleri kullan\u0131lan d\u00fcnyadaki en b\u00fcy\u00fck \u00e7at\u0131 projesi olarak ifade edilen, Kayseri Mobilyac\u0131lar Yenilenebilir Enerji Kooperatifi G\u00fcne\u015f Enerjisi <img loading=\"lazy\" class=\"alignleft size-medium wp-image-83628\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/kayseride-yenilenebilir-enerji-kooperatifinin-gesinde-ilk-faz-devreye-alindi-300x220.jpg\" alt=\"\" width=\"300\" height=\"220\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/kayseride-yenilenebilir-enerji-kooperatifinin-gesinde-ilk-faz-devreye-alindi-300x220.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/kayseride-yenilenebilir-enerji-kooperatifinin-gesinde-ilk-faz-devreye-alindi-500x366.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/kayseride-yenilenebilir-enerji-kooperatifinin-gesinde-ilk-faz-devreye-alindi-68x50.jpg 68w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/kayseride-yenilenebilir-enerji-kooperatifinin-gesinde-ilk-faz-devreye-alindi.jpg 666w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Santrali\u2019nin ilk faz a\u00e7\u0131l\u0131\u015f\u0131 ger\u00e7ekle\u015ftirildi.<\/p>\n<p>Yat\u0131r\u0131m\u0131 planlayan, ger\u00e7ekle\u015ftiren, i\u015fletme ve bak\u0131m\u0131n\u0131 \u00fcstlenen Sefero\u011flu Elektrik taraf\u0131ndan verilen bilgilere g\u00f6re; kooperatifin a\u00e7\u0131l\u0131\u015f\u0131 yap\u0131lan ilk faz\u0131 y\u0131lda 7.5 GWh elektrik \u00fcretimi ile tesislerin g\u00fcnd\u00fcz t\u00fcketiminin y\u00fczde 30\u2019unu kar\u015f\u0131layacak. Proje i\u00e7in 18 bin adet 325 W panel yerle\u015ftirilerek 36 bin m2 \u00e7at\u0131 alan\u0131nda 5.8 MWp kurulu g\u00fcce ula\u015f\u0131ld\u0131.<\/p>\n<p>Projenin toplam yat\u0131r\u0131m tutar\u0131, 7.2 milyon dolar olurken, a\u00e7\u0131l\u0131\u015f\u0131 yap\u0131lan proje ile Yenilenebilir Enerji Kooperatifi hem enerji tasarrufu sa\u011flayacak hem de 22 bin 294 adet a\u011fa\u00e7 kurtar\u0131lm\u0131\u015f olacak. Panasonic HIT \u00fcr\u00fcn\u00fcn\u00fcn kullan\u0131ld\u0131\u011f\u0131 d\u00fcnyadaki en b\u00fcy\u00fck \u00e7at\u0131 projesi olma \u00f6zelli\u011fini ta\u015f\u0131yan bu g\u00fcne\u015f enerjisi uygulamas\u0131, ayn\u0131 zamanda T\u00fcrkiye \u00e7ap\u0131ndaki en b\u00fcy\u00fck \u00e7at\u0131 projelerinden biri olarak kabul ediliyor. T\u00fcrkiye\u2019nin ilk Yenilenebilir Enerji Kooperatifi projesi ve yine \u00fclkemizin 743 KOB\u0130 \u00fcyeli ilk \u00e7ok ortakl\u0131 GES projesi olarak da dikkat \u00e7ekiyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kayseri Mobilyac\u0131lar Yenilenebilir Enerji Kooperatifi G\u00fcne\u015f Enerjisi Santrali\u2019nin ilk faz a\u00e7\u0131l\u0131\u015f\u0131 ger\u00e7ekle\u015ftirildi.\u00a0A\u00e7\u0131l\u0131\u015f\u0131 yap\u0131lan ilk faz, y\u0131lda 7.5 GWh elektrik \u00fcretimi ile tesislerin g\u00fcnd\u00fcz [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":83628,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[42838,42483,42840,42841,42489,34979,19638,26353,5300,42491,41345,67,1009,35038,42842,23416,2569,23133,23131,42847,42836,42837,42849,42552,42839,42848,5842,42843,42846,42845,42844,26829,34719],"views":1136,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83626"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=83626"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83626\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/83628"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=83626"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=83626"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=83626"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}